Two family converted from one family
210-14 HOLLIS AVENUE
QUEENS · Queens Village · BIN 4239448
💬 Discuss this project
1945Year Built
2Stories
B3Building Class
R3-2Zoning
3,248 sfGross Floor Area
2Units
Rent Stabilized2 Active Violations ▸FDNY Report ↗
Two family converted from one family · 8,022 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 23p · 2 filings · 20 docs
Floor 14p · 2 filings · 20 docs
Cellar3p · 2 filings · 20 docs
Site & exterior1p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/21/2024$1.5M—HR HOLLIS LLC → Private party$471/sf building
02/10/2022$485K—Private party → HR HOLLIS LLC$149/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.k.design409/18/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Elite GC NYGeneral Contractor303/21/2026
Elite GC NYScaffold303/21/2026
Austin Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Homa Professional Engineering8807309/18/2023
Building Lifecycle
11/25/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
12/05/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
12/20/2023
Signed off — Alteration
Q00808551-I1
12/06/2023
Signed off — Alteration
installation of new gas fired equipment,and plumbing fixtures for the renovation of the existing two family dwelling . Filed in conjunction with ALT I app#Q00697235-I1
Q00809277-I1
12/06/2023
Signed off — Alteration
Existing 2 story two family dwelling to be horizontally enlarged and fully renovated .new drywall partitions and plumbing fixtures as per plans. No change in use egress or occupancy. (see existing C of O number Q110260 ).
Q00697235-I1
115 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAustin Plumbing & Heating05/15/2023
DOB NOWStructuralSigned-offElite GC NY05/14/2023
DOB NOWConstruction FenceSigned-offElite GC NY01/19/2023
1 project · most recent 07/07/2023
General Wiring
FiledStatusContractorScope
07/07/2023CompleteWMS Electrical ContngGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/28/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/28/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/28/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
10/04/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationEBRAHIM HEKMATspecial
10/04/2023Subgrade InspectionsEBRAHIM HEKMATspecial
10/04/2023Structural Stability – Alterations of existing buildingsEBRAHIM HEKMATspecial
10/04/2023Concrete - Cast-In-PlaceEBRAHIM HEKMATspecial
10/04/2023Fire-Resistant Penetrations and JointsEBRAHIM HEKMATspecial
10/04/2023Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
10/04/2023Construction Operations Influencing Adjacent StructuresEBRAHIM HEKMATspecial
10/04/2023Energy Code Compliance InspectionsEBRAHIM HEKMATprogress
10/04/2023Footing and FoundationEBRAHIM HEKMATprogress
10/04/2023Fire-Resistance Rated ConstructionEBRAHIM HEKMATprogress
10/04/2023Finaljacob Kannerprogress
10/04/2023Structural Wood FrameEBRAHIM HEKMATprogress
10/04/2023HVAC-R and service water heating equipmentEBRAHIM HEKMATenergy_progress
10/04/2023Air barrier - visual inspectionEBRAHIM HEKMATenergy_progress
10/04/2023Fenestration areasEBRAHIM HEKMATenergy_progress
10/04/2023HVAC-R and service water heating system controlsEBRAHIM HEKMATenergy_progress
10/04/2023Permanent certificateEBRAHIM HEKMATenergy_progress
10/04/2023Fenestration air leakageEBRAHIM HEKMATenergy_progress
10/04/2023Fenestration and door U-factor and product ratingsEBRAHIM HEKMATenergy_progress
10/04/2023Insulation placement and R valuesEBRAHIM HEKMATenergy_progress
10/04/2023Lighting controlsEBRAHIM HEKMATenergy_progress
10/04/2023HVAC-R and service water piping design and insulationEBRAHIM HEKMATenergy_progress
01/08/2023Fire-Resistant Penetrations and JointsEBRAHIM HEKMATspecial
01/08/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationEBRAHIM HEKMATspecial
01/08/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesEBRAHIM HEKMATspecial
Latest 25 of 30.
32 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account