← Back
Office with commercial, 7-19 stories
210 5 AVENUE
MANHATTAN · Midtown South-Flatiron-Union Square · BIN 1015623
💬 Discuss this project
1902Year Built
11Stories
O6Building Class
C5-2Zoning
36,485 sfGross Floor Area
20Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: LERAD COMPANY LLC · 3,625 sf lot · 10.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalFire ProtectionEquipmentGeneral
Roof2p · 1 filing · 4 docs
Floor 111p · 1 filing · 9 docs
Floor 10
Floor 9
Floor 8
Floor 73p · 1 filing · 7 docs
Floor 64p · 1 filing · 2 docs
Floor 54p · 1 filing · 2 docs
Floor 413p · 2 filings · 20 docs
Floor 34p · 1 filing · 2 docs
Floor 24p · 1 filing · 2 docs
Floor 14p · 1 filing · 2 docs
Site & exterior29p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LERAD COMPANY9203/22/2026
SILVERLINING807/08/2026
LERARD603/21/2026
FM RING ASSOCIATES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CLARKE CONSTRUCTION CONSULTANTS503/21/2026
Rigid Structural Design, LLC203/21/2026
EA DESIGN GROUP203/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GEORGE BASSOLINOPlumbing603/21/2026
EMPIRE MECHANICAL SVCS*General Contractor407/08/2026
NOVA CONSTRUCTION SERVICEGeneral Contractor407/08/2026
ACE GROUP NY CORPGeneral Contractor303/21/2026
MANHATTAN D ENTERPRISESGeneral Contractor207/08/2026
J.D.S. CONSTRUCTION,LLCElectrical203/21/2026
INDY ELECTRIC CORP.Electrical203/22/2026
G & G VILLAGE P & H INCElectrical203/21/2026
FALIKS, GENNADYElectrical203/21/2026
GWT ENTERPRISES INCGeneral Contractor107/08/2026
JURGEN WRIEDTElectrical103/21/2026
JOHN JR MARIElectrical103/21/2026
MILLSTONE CONSTRUCTION ASGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING2018303/25/2025
AK ENGINEERING PC678105/09/2023
THOMAS A. FENNIMAN ARCHIT260110/07/2022
Building Lifecycle
All (136)Filed (13)Permit Issued (9)Signed Off (5)Facade (FISP) (12)Violation (60)Objection (16)Special Inspection (21)
03/11/2026
Violation issued (FDNY_ORDER, closed)
03/11/2026
Violation issued (FDNY_ORDER, closed)
03/11/2026
Violation issued (FDNY_NOV, closed)
08/18/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01217782-P1
05/09/2025
Permit issued — Sidewalk Shed
M01217782-I1-SH
05/08/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01217782-I1
05/08/2025
Special inspection requirement — Final
Peter Mullen
05/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
05/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
05/08/2025
Special inspection requirement — Ventilation and air distribution system
05/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Peter Mullen
05/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
05/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/08/2025
Special inspection requirement — Mechanical Systems
William Ryan
04/21/2025
Objection resolved — Addressed
04/15/2025
Objection resolved — Addressed
04/09/2025
Objection resolved — Addressed
04/09/2025
Objection resolved — Addressed
04/08/2025
Objection resolved — Addressed
04/04/2025
Objection raised — Scope
04/04/2025
Objection raised — Fire_Protection
04/04/2025
Objection raised — Fire_Protection
04/04/2025
Objection raised — Scope
04/04/2025
Objection raised — Structural
03/25/2025
Filed — Alteration
SP WORK ON THE 4TH FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01081740-S1
03/25/2025
Filed — Alteration
SP WORK ON THE 4TH FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01081740-P1
03/25/2025
Filed — Alteration
SP WORK ON THE 4TH FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01081740-S2
10/17/2024
Permit issued — Mechanical Systems
M01081740-I1-MS
09/09/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/16/2024
Objection resolved — Addressed
08/01/2024
Objection raised — Scope
08/01/2024
Objection raised — Energy
08/01/2024
Objection raised — Scope
07/26/2024
Filed — Alteration
SP WORK ON THE 4TH FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01081740-I1
06/26/2024
Violation issued (FDNY_NOV, closed)
06/26/2024
Violation issued (FDNY_NOV, closed)
04/24/2024
Signed off — Alteration
M01004869-I1
04/09/2024
Signed off — Alteration
Installation of a temporarily roof and overhead protection as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00694724-I1
04/09/2024
Permit issued — Mechanical Systems
M01004869-I1-MS
04/01/2024
Filed — Alteration
M01004869-I1
02/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
William Ryan
02/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
02/15/2024
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
02/15/2024
Special inspection requirement — Ventilation and air distribution system
William Ryan
02/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
William Ryan
02/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
William Ryan
02/13/2024
Special inspection requirement — Mechanical Systems
William Ryan
02/13/2024
Special inspection requirement — Final
Peter Mullen
01/08/2024
Permit issued — Protection and Mechanical Methods
M00694724-I1-PM
10/12/2023
Violation issued (FDNY_NOV, closed)
09/12/2023
Violation issued (FDNY_NOV, closed)
07/19/2023
Violation issued (ECB, closed)
Construction
06/05/2023
Permit issued — General Construction
M00854096-I1-GC
05/09/2023
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00854096-I1
04/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
04/04/2023
Permit issued — Protection and Mechanical Methods
M00694724-I1-PM
04/03/2023
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
04/03/2023
Special inspection requirement — Final
Javier de la Garza
03/02/2023
Signed off — Alteration
M08000812-I1
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP05/09/2025
DOB NOWMechanical SystemsPermit IssuedEMPIRE MECHANICAL SVCS*10/17/2024
DOB NOWMechanical SystemsSigned-offEMPIRE MECHANICAL SVCS*04/09/2024
DOB NOWProtection and Mechanical MethodsSigned-offGWT ENTERPRISES INC01/08/2024
DOB NOWGeneral ConstructionSigned-offMILLSTONE CONSTRUCTION AS06/05/2023
DOB NOWProtection and Mechanical MethodsSigned-offMANHATTAN D ENTERPRISES04/04/2023
DOB NOWSupported ScaffoldSigned-offNOVA CONSTRUCTION SERVICE12/21/2022
DOB NOWSidewalk ShedSigned-offNOVA CONSTRUCTION SERVICE12/13/2022
DOB NOWProtection and Mechanical MethodsSigned-offMANHATTAN D ENTERPRISES04/12/2022
BIS—ISSUEDBALKAN CONSTRUCTION LLC11/01/2023
BISOTISSUEDKEL-MAR DESIGNS INC06/28/2023
BISOTISSUEDKEL-MAR DESIGNS INC06/28/2023
BISOTISSUEDKEL-MAR DESIGNS INC04/26/2023
BISOTISSUEDKEL-MAR DESIGNS INC04/26/2023
BISOTISSUEDKEL-MAR DESIGNS INC08/24/2022
BISOTISSUEDKEL-MAR DESIGNS INC08/24/2022
BISOTISSUEDC C CONTROLLED COMBUSTION08/20/2020
BISPLISSUEDMCMANUS MECH MAINT P&H INC06/15/2020
BIS—ISSUEDNEPTUNE SIGNS&AWNINGS INC05/08/2017
BIS—ISSUEDNEPTUNE SIGNS&AWNINGS INC05/08/2017
BISOTISSUEDBOHEMIA J&P LLC10/06/2016
BIS—ISSUEDCPM BUILDERS INC10/06/2016
BISOTISSUEDCPM BUILDERS INC10/05/2016
BISMHISSUEDCPM BUILDERS INC10/05/2016
BISOTISSUEDCPM BUILDERS INC10/05/2016
BISMHISSUEDCPM BUILDERS INC10/05/2016
BISOTISSUEDCPM BUILDERS INC10/05/2016
BISOTISSUEDCPM BUILDERS INC10/05/2016
BISOTISSUEDCPM BUILDERS INC10/05/2016
BISPLISSUEDCC CONTROLLED PLBG CO INC09/14/2016
BISOTISSUEDC C CONTROLLED COMBUSTION07/25/2016
BISFSISSUEDC C CONTROLLED COMBUSTION07/22/2016
BISFPISSUEDRELIABLE FIRE PROT. INC07/20/2016
BISOTISSUEDCPM BUILDERS INC06/06/2016
BISMHISSUEDCPM BUILDERS INC06/06/2016
BISOTISSUEDCPM BUILDERS INC06/06/2016
BISPLISSUEDCOPPER PLUMBING INC04/20/2016
BISOTISSUEDCPM BUILDERS INC04/19/2016
BISOTISSUEDCPM BUILDERS INC04/19/2016
BISMHISSUEDCPM BUILDERS INC04/19/2016
+ 19 more permits on file
1 project · most recent 03/25/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/25/2025Permit IssuedEMPIRE MECHANICAL SVCS*Heating and Air Conditioning Systems
Heat / Cool
1 project · most recent 03/25/2025
FiledStatusContractorScope
03/25/2025——11 heads
7 projects · most recent 05/20/2025
General Wiring HVAC Wiring
FiledStatusContractorScope
05/20/2025CompleteFOCUS ELECTRICAL INCHVAC Wiring
04/11/2024CompleteFOCUS ELECTRICAL INCGeneral Wiring
02/20/2023CompleteINDY ELECTRIC CORP.General Wiring
01/19/2023Permit IssuedTOP SHELF ELECTRIC CORP—
05/11/2022Permit IssuedSOLAS ELECTRICAL CORP—
01/16/2021CompleteINDY ELECTRIC CORP.General Wiring
08/28/2019CompleteFOLKS ELECTRICAL INCGeneral Wiring
1 project · most recent 08/18/2025
Sidewalk Shed
FiledStatusContractorScope
08/18/2025Permit IssuedACE GROUP NY CORPSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
05/08/2025FinalPeter Mullenprogress
05/08/2025HVAC-R and service water heating system controls—energy_progress
05/08/2025HVAC-R and service water heating equipment—energy_progress
05/08/2025Ventilation and air distribution system—energy_progress
05/08/2025Energy Code Compliance InspectionsPeter Mullenprogress
05/08/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
05/08/2025Tenant Protection Plan Compliance—special
05/08/2025Mechanical SystemsWilliam Ryanspecial
02/15/2024HVAC-R and service water piping design and insulationWilliam Ryanenergy_progress
02/15/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
02/15/2024Energy Code Compliance InspectionsWilliam Ryanprogress
02/15/2024Ventilation and air distribution systemWilliam Ryanenergy_progress
02/15/2024HVAC-R and service water heating equipmentWilliam Ryanenergy_progress
02/15/2024HVAC-R and service water heating system controlsWilliam Ryanenergy_progress
02/13/2024Mechanical SystemsWilliam Ryanspecial
02/13/2024FinalPeter Mullenprogress
04/28/2023Fire-Resistant Penetrations and JointsAri Kamospecial
04/03/2023Tenant Protection Plan ComplianceAri Kamospecial
04/03/2023FinalJavier de la Garzaprogress
09/08/2022MasonryThomas Fennimanspecial
09/08/2022FinalThomas Fennimanprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Prime Line DistributorsOfficeFloor 7
Project M00854096 Alteration · Permit Entire · 05/09/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 855 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/02/2026M00694724-I1Request digital key ↗
09/02/2026M00694724-P1Request digital key ↗
09/01/2026M08000812-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits170
▸BISPLAN / WORK APPROVAL APPLICATION87
09/25/2025140915428Open ↗
08/13/2024122342893Open ↗
08/12/2024122342893Open ↗
Showing 3 of 87 on file for this type
▸BISWORK PERMIT APPLICATION67
11/01/2023123264653Open ↗
08/25/2022123764159Open ↗
08/25/2022123764159Open ↗
Showing 3 of 67 on file for this type
▸BISPLACE OF ASSEMBLY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWLPC Approval/Permit6
08/13/2026M01081740-P1Open ↗
08/13/2026M01081740-S2Open ↗
08/13/2026M01081740-I1Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
09/19/2019123264653Open ↗
Showing 1 of 2 on file for this type
▸BISDOT: SIDEWALK/CURB/ROAD WORK PERMITS1
01/12/2024123764159Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications161
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION94
02/10/2020123764159Open ↗
09/18/2019122745459Open ↗
06/11/2019123764159Open ↗
Showing 3 of 94 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT15
06/19/2020140915428Open ↗
Showing 1 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/02/2026M00694724-I1Open ↗
09/02/2026M00694724-P1Open ↗
09/01/2026M08043742-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M01081740-I1Open ↗
09/01/2026M01081740-I1Open ↗
08/31/2026M08000812-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M01081740-I1Open ↗
08/31/2026M08000812-I1Open ↗
08/27/2026M00854096-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment53
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE16
10/11/2019123264653Open ↗
10/11/2019123264653Open ↗
09/26/2019123264653Open ↗
Showing 3 of 16 on file for this type
▸BISEQUIPMENT USE PERMITS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING8
09/25/2020120309647Open ↗
Showing 1 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
02/25/2021122806375Open ↗
Showing 1 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection14
▸BISTenant Protection Plan and Notes9
06/11/2019123764159Open ↗
09/06/2024122342893Open ↗
06/19/2020140915428Open ↗
Showing 3 of 9 on file for this type
▸BISSTREET TREE CHECKLIST5
06/19/2019123264653Open ↗
Showing 1 of 5 on file for this type
▸Environmental & Asbestos45
▸BISASBESTOS: CERTIFICATION (DEP ACP5)19
06/19/2020140915428Open ↗
06/11/2019123764159Open ↗
05/24/2019123264653Open ↗
Showing 3 of 19 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/31/2026M00854096-I1Open ↗
08/24/2026M01081740-S2Open ↗
08/24/2026M01081740-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Energy Compliance65
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS32
06/19/2019123264653Open ↗
06/11/2019123764159Open ↗
05/24/2019123264653Open ↗
Showing 3 of 32 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
11/05/2018122770796Open ↗
Showing 1 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
08/29/2025123264653Open ↗
08/29/2025123264653Open ↗
11/21/2024140915428Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
11/21/2024140915428Open ↗
08/23/2024122342893Open ↗
01/03/2024123764159Open ↗
Showing 3 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER3
08/23/2024122342893Open ↗
03/21/2023123264653Open ↗
03/21/2023123264653Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
08/23/2024122342893Open ↗
03/21/2023123264653Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLIGHTING CONTROLS2
08/23/2024122342893Open ↗
03/21/2023123264653Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING2
08/23/2024122342893Open ↗
03/21/2023123264653Open ↗
▸BISFENESTRATION AIR LEAKAGE2
08/23/2024122342893Open ↗
03/21/2023123264653Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/19/2020140915428Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY9
09/25/2025140915428Open ↗
08/29/2025123264653Open ↗
08/29/2025123264653Open ↗
Showing 3 of 9 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)4
08/23/2024122342893Open ↗
03/15/2024120309647Open ↗
01/17/2024123764159Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STEEL - WELDING1
01/03/2024123764159Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
07/25/2022123764159Open ↗
▸BISMECHANICAL SYSTEMS1
03/21/2023123264653Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
07/25/2022123764159Open ↗
▸Approvals, Objections & Sign-offs116
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST49
09/25/2025140915428Open ↗
09/06/2024122342893Open ↗
05/02/2024120309647Open ↗
Showing 3 of 49 on file for this type
▸BISLANDMARKS APPROVAL24
06/19/2020140915428Open ↗
02/19/2020123764159Open ↗
06/11/2019123764159Open ↗
Showing 3 of 24 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
02/10/2020123764159Open ↗
Showing 1 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
03/29/2023123264653Open ↗
11/23/2022122810075Open ↗
10/05/2022122810075Open ↗
Showing 3 of 10 on file for this type
▸BISLANDMARKS SIGNOFF4
05/03/2024123264653Open ↗
01/04/2024123764159Open ↗
03/28/2023120309647Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL3
08/23/2024122342893Open ↗
03/15/2024120309647Open ↗
01/17/2024123764159Open ↗
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership77
▸BISCOST AFFIDAVIT62
05/01/2024120309647Open ↗
05/01/2024120309647Open ↗
07/25/2023123264653Open ↗
Showing 3 of 62 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
11/21/2024140915428Open ↗
09/05/2024122342893Open ↗
01/09/2024123764159Open ↗
▸Filing & Intake Forms95
▸BISBOROUGH INTAKE FORM38
08/25/2022123764159Open ↗
08/15/2022123764159Open ↗
03/11/2020120309647Open ↗
Showing 3 of 38 on file for this type
▸BISEFILING COVER SHEET33
06/11/2019123764159Open ↗
06/11/2019123764159Open ↗
Showing 2 of 33 on file for this type
▸BISADDITIONAL INFORMATION23
07/26/2023123264653Open ↗
10/11/2019123264653Open ↗
08/05/2019123264653Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
06/19/2020140915428Open ↗
▸Other Documents4
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026M00854096-I1Open ↗
08/13/2026M08000812-I1Open ↗