← Back
Adult care facility
210 BEACH 47 STREET
QUEENS · BIN 4301914
💬 Discuss this project
1974Year Built
3Stories
I7Building Class
C4-3AZoning
30,935 sfGross Floor Area
1Units
LL97 Covered10 Open Violations ▸FDNY Report ↗
Adult care facility · Owner of record: MDE REALTY, L.L.C. · 23,547 sf lot · 1.31 FAR built · Flood zone AE
Locations of Work
StructuralElectricalMechanicalEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW CINGULAR WIRELESS PCS, LLC609/13/2026
MDE REALTY1503/22/2026
LV CONTRACTING SOLUTIONS103/22/2026
5008 13 LLC103/21/2026
CONSTRUCTION SERVICES CONSULTING203/21/2026
CARRAMAN REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOHN M BANKS ARCHITECT104/22/2026
TECTONIC ENGINEERING709/02/2025
ASHRAF CORP110/08/2023
PAUL PERDEK, PROF. ENG. PLLC109/19/2023
SOURCE ENGINEERING PC108/18/2023
SCHERER DESIGN GROUP109/03/2019
CENTEK ENGINEERING, INC.110/01/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM CONSULTING GROUP, INC.803/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
AE DESIGN SOLUTION203/21/2026
LEVIN ENGINEERING PLLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JACOBS TELECOMMUN. INCGeneral Contractor1007/08/2026
LV CONTRACTING SOLUTIONSGeneral Contractor407/08/2026
SQUAN CONSTRUCTION SERVICGeneral Contractor207/08/2026
MECHANICAL EAST CO.,INCGeneral Contractor203/21/2026
PIPESTYLISTS, INCPlumbing107/08/2026
BLASKOVIC, ALDOElectrical103/21/2026
PUMPING SOL PLBG & MECH IPlumbing107/08/2026
FLORES, HECTORElectrical103/21/2026
ACE OPTICS LLCGeneral Contractor107/08/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
R MARSAC CONSULTING LLC329104/22/2026
TECTONIC ENGINEERING CONS106509/02/2025
NORMAN C. LOK818110/08/2023
LEVIN ENGINEERING PLLC1267108/18/2023
SCHERER DESIGN GROUP, LLC6303109/03/2019
Building Lifecycle
All (105)Filed (13)Permit Issued (13)Signed Off (8)Violation (44)Objection (18)Special Inspection (9)
04/30/2026
Permit issued — Antenna
Q01268463-I1-AN
04/22/2026
Filed — Alteration
AT&T - Relocation/replacement/relocation of antennas with removal/installation of RRH units on roof. Retrofit of cabinets on existing equipment platform on roof. This project is not a substantial change per 6409(a). No change to occupancy, use, or egress.
Q01268463-I1
02/17/2026
Violation issued (FDNY_ORDER, closed)
10/24/2025
Signed off — Alteration
Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress.
Q00421452-I1
09/02/2025
Filed — Alteration
Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress.
Q00421452-P2
03/18/2025
Permit issued — Plumbing
Q00421452-I1-PL
02/11/2025
Signed off — Alteration
AT&T - Retrofit and removal of cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Q00421459-I1
02/11/2025
Signed off — Alteration
Q00421443-I1
01/14/2025
Signed off — Alteration
Q00943804-I1
11/12/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00932857-I1
05/10/2024
Violation issued (FDNY_NOV, closed)
04/25/2024
Permit issued — General Construction
Q00943804-I1-GC
04/23/2024
Violation issued (ECB, closed)
Construction
01/07/2024
Violation issued (FDNY_NOV, closed)
10/27/2023
Signed off — Alteration
MODIFICATIONS TO EXISTING AT&T SITE. REPLACE (6) ANTENNAS AND (1) EQUIPMENT CABINET. INSTALL (3) RRH UNITS.
Q00685233-I1
10/16/2023
Permit issued — General Construction
Q00943804-I1-GC
10/08/2023
Filed — Alteration
Q00943804-I1
09/28/2023
Signed off — Alteration
REPLACE EXISTING OUTDOOR AC UNIT ON THE ROOF. NO CHANGE IN USE, EGRESS OR OCCUPACNY.
Q00914119-I1
09/20/2023
Permit issued — Mechanical Systems
Q00914119-I1-MS
09/20/2023
Permit issued — Sidewalk Shed
Q00932857-I1-SH
09/19/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00932857-I1
08/18/2023
Filed — Alteration
REPLACE EXISTING OUTDOOR AC UNIT ON THE ROOF. NO CHANGE IN USE, EGRESS OR OCCUPACNY.
Q00914119-I1
08/16/2023
Special inspection requirement — Tenant Protection Plan Compliance
Dmitry Levin
08/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
Dmitry Levin
08/09/2023
Special inspection requirement — Maintenance information
Dmitry Levin
08/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
Dmitry Levin
08/03/2023
Special inspection requirement — Mechanical Systems
Dmitry Levin
08/03/2023
Special inspection requirement — Final
Dmitry Levin
12/28/2022
Violation issued (FDNY_NOV, closed)
05/31/2022
Permit issued — Antenna
Q00685233-I1-AN
04/06/2022
Objection raised — Admin
04/06/2022
Objection resolved — Addressed
04/06/2022
Objection raised — Fire_Protection
04/06/2022
Objection resolved — Addressed
04/06/2022
Objection raised — Scope
04/06/2022
Objection resolved — Addressed
04/06/2022
Objection raised — Scope
04/06/2022
Objection resolved — Addressed
04/06/2022
Objection raised — Structural
04/06/2022
Objection resolved — Addressed
04/05/2022
Filed — Alteration
MODIFICATIONS TO EXISTING AT&T SITE. REPLACE (6) ANTENNAS AND (1) EQUIPMENT CABINET. INSTALL (3) RRH UNITS.
Q00685233-I1
12/26/2021
Special inspection requirement — Final
ANTONIO GUALTIERI
12/26/2021
Special inspection requirement — Mechanical Systems
ANTONIO GUALTIERI
12/15/2021
Filed — Alteration
Q00421443-P1
08/02/2021
Filed — Alteration
Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress.
Q00421452-P1
07/26/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTONIO GUALTIERI
04/20/2021
Violation issued (FDNY_NOV, closed)
03/26/2021
Permit issued — Plumbing
Q00421452-I1-PL
03/10/2021
Permit issued — Antenna
Q00421459-I1-AN
02/16/2021
Objection raised — 2014-AN AC 28-104.7.1-Administ
02/16/2021
Objection resolved — Addressed
02/16/2021
Objection raised — 2014-AN BC Appendix G-Building
02/16/2021
Objection resolved — Addressed
02/12/2021
Filed — Alteration
AT&T - Retrofit and removal of cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Q00421459-I1
02/01/2021
Violation issued (ECB, closed)
Elevators
01/28/2021
Permit issued — Mechanical Systems
Q00421443-I1-MS
01/21/2021
Filed — Alteration
Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress.
Q00421452-I1
01/20/2021
Filed — Alteration
Q00421443-I1
12/28/2020
Violation issued (HPD, open)
A
12/28/2020
Violation issued (HPD, open)
A
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaPermit IssuedACE OPTICS LLC04/30/2026
DOB NOWPlumbingSigned-offJAG PLUMBING & MECHANICAL03/18/2025
DOB NOWGeneral ConstructionSigned-offLV CONTRACTING SOLUTIONS04/25/2024
DOB NOWGeneral ConstructionSigned-offLV CONTRACTING SOLUTIONS10/16/2023
DOB NOWMechanical SystemsSigned-offMECHANICAL EAST CO.,INC09/20/2023
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL09/20/2023
DOB NOWAntennaSigned-offARMENTUM DIGITAL INFRASTR05/31/2022
DOB NOWPlumbingSigned-offT & T PLUMBING INC03/26/2021
DOB NOWAntennaSigned-offARMENTUM DIGITAL INFRASTR03/10/2021
DOB NOWMechanical SystemsSigned-offARMENTUM DIGITAL INFRASTR01/28/2021
DOB NOWAntennaSigned-offSQUAN CONSTRUCTION SERVIC02/14/2020
DOB NOWAntennaSigned-offSQUAN CONSTRUCTION SERVIC12/05/2019
DOB NOWAntennaPermit IssuedARMENTUM DIGITAL INFRASTR12/01/2018
BISMHISSUEDRC3 ELECTRIC, LLC10/06/2017
BISEQISSUEDCONSTRUCTION SVS CON NY10/31/2016
BISEQISSUEDCONSTRUCTION SVS CON NY10/26/2016
BISPLISSUEDGW MECHANICAL CORP10/04/2016
BISOTISSUEDSQUAN CONSTRUCTION SERVIC09/29/2016
BISOTISSUEDSQUAN CONSTRUCTION SERVIC06/20/2016
BISOTISSUEDTELCOM ENGINEERING GP INC03/01/2016
BISBLISSUEDGW MECHANICAL CORP10/06/2015
BISPLISSUEDGW MECHANICAL CORP02/02/2015
BISBLISSUEDGW MECHANICAL CORP02/02/2015
BISOTISSUEDTELCOM ENGINEERING GP INC09/12/2014
BISOTISSUEDANTELEX WIRELESS INC06/19/2012
BISOTISSUEDPREFERRED BUILDERS INC06/25/2010
BISPLISSUEDDEWATERS P & H LLC02/26/2008
BISMHISSUEDCOSTROTTA CONSTRUCTION MGMT02/11/2008
BISOTISSUEDCOSTROTTA CONSTRUCITON MANAGEMEN01/22/2008
BISFPISSUEDFIRE COMMAND CO INC03/06/2007
BISOTISSUEDTEG PARTNERSLLC02/20/2007
BISSPISSUEDMEGA PLBG CORP06/27/2005
BISPLISSUEDMEGA PLBG CORP06/27/2005
BISOTISSUEDODYSSIA GLOBAL COMM. CORP05/27/2004
BISFBISSUEDCOHLER FUEL OIL CO INC12/19/2002
1 project · most recent 09/12/2023
FiledStatusContractorScope
09/12/2023Permit IssuedOPTIMAL ELECTRIC, INC—
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
08/16/2023Tenant Protection Plan ComplianceDmitry Levinspecial
08/09/2023HVAC-R and service water heating system controlsDmitry Levinenergy_progress
08/09/2023Maintenance informationDmitry Levinenergy_progress
08/09/2023HVAC-R and service water heating equipmentDmitry Levinenergy_progress
08/03/2023Mechanical SystemsDmitry Levinspecial
08/03/2023FinalDmitry Levinprogress
12/26/2021FinalANTONIO GUALTIERIprogress
12/26/2021Mechanical SystemsANTONIO GUALTIERIspecial
07/26/2021Fire-Resistant Penetrations and JointsANTONIO GUALTIERIspecial
▾Documents — 218 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch6
08/24/2026Q00914119-I1Request digital key ↗
08/24/2026Q00932857-I1Request digital key ↗
08/24/2026Q00943804-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/27/2026Q00421452-I1Request digital key ↗
08/27/2026Q00421452-P2Request digital key ↗
08/15/2026Q00421452-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/27/2026Q00421443-I1Request digital key ↗
08/15/2026Q00421443-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna2
08/28/2026Q00179976-I1Request digital key ↗
08/14/2026Q00421459-I1Request digital key ↗
▸Applications & Permits33
▸BISPLAN / WORK APPROVAL APPLICATION18
12/11/2018421531364Open ↗
06/12/2018421531364Open ↗
07/26/2017421531364Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION15
10/20/2017421531364Open ↗
10/31/2016440355919Open ↗
10/24/2016440355928Open ↗
Showing 3 of 15 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWFlood Zone Design Certification2
08/13/2026Q00179976-I1Open ↗
08/13/2026Q00026604-I1Open ↗
▸DOB NOWFlood Zone Compliance2
08/13/2026Q00026604-I1Open ↗
08/13/2026Q00179976-I1Open ↗
▸Seals & Professional Certifications50
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
04/02/2019421531364Open ↗
11/27/2018421531364Open ↗
10/25/2017420974716Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/27/2026Q00421443-I1Open ↗
08/27/2026Q00421452-P1Open ↗
08/27/2026Q00421452-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
10/24/2016440355919Open ↗
10/24/2016440355928Open ↗
09/19/2016421372534Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/19/2016421372534Open ↗
02/11/2015421078229Open ↗
07/07/2009420044516Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026Q00914119-I1Open ↗
09/02/2026Q00914119-I1Open ↗
08/28/2026Q00421443-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026Q00914119-I1Open ↗
08/29/2026Q00421452-P1Open ↗
08/28/2026Q00421443-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/24/2016440355919Open ↗
10/24/2016440355928Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/24/2016440355919Open ↗
10/24/2016440355928Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/07/2009420044516Open ↗
▸Trade Schedules & Equipment20
▸BISEQUIPMENT USE APPLICATION/PERMIT4
04/02/2019421531364Open ↗
09/08/2010420044516Open ↗
09/08/2010420044516Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
09/19/2016421372534Open ↗
11/05/2015421078229Open ↗
10/09/2015421078229Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
11/18/2015421078229Open ↗
11/04/2015421078229Open ↗
10/28/2015421078229Open ↗
▸BISSCHEDULE B - PLUMBING2
08/12/2011410037712Open ↗
12/19/2007410037712Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
10/15/2015421078229Open ↗
02/11/2015421078229Open ↗
▸BISEQUIPMENT USE PERMITS2
04/02/2019421531364Open ↗
02/03/2010410036875Open ↗
▸BISBOILER APPROVAL : 900A1
11/04/2015421078229Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
09/15/2014420974716Open ↗
▸DOB NOWFDNY: Letter of No Objection1
08/13/2026Q00179976-I1Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/27/2026Q00421443-I1Open ↗
08/27/2026Q00421452-I1Open ↗
08/27/2026Q00421452-P1Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
06/01/2011420359230Open ↗
06/18/2010420201971Open ↗
12/19/2007410036875Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
07/26/2017421531364Open ↗
02/11/2015421078229Open ↗
06/18/2014420974716Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/07/2009420044516Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
04/02/2019421531364Open ↗
11/27/2018421531364Open ↗
10/25/2017420974716Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
04/02/2019421531364Open ↗
10/25/2017420974716Open ↗
12/29/2015421078229Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/24/2016440355919Open ↗
10/24/2016440355928Open ↗
▸Approvals, Objections & Sign-offs25
▸BISADMINISTRATIVE OBJECTIONS8
09/19/2016421372534Open ↗
02/11/2015421078229Open ↗
06/18/2014420974716Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
04/02/2019421531364Open ↗
10/25/2017420974716Open ↗
01/11/2016421078229Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
04/02/2019421531364Open ↗
12/12/2018421531364Open ↗
10/07/2016421372534Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER1
07/05/2016420974716Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT18
04/02/2019421531364Open ↗
10/25/2017420974716Open ↗
07/26/2017421531364Open ↗
Showing 3 of 18 on file for this type
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION8
09/29/2017421531364Open ↗
09/29/2017421531364Open ↗
09/29/2017421531364Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET5
07/26/2017421531364Open ↗
09/19/2016421372534Open ↗
02/11/2015421078229Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
10/24/2016440355919Open ↗
10/24/2016440355928Open ↗
▸BISBOROUGH INTAKE FORM1
10/25/2017420974716Open ↗
▸Other Documents5
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)2
08/13/2026Q00026604-I1Open ↗
08/13/2026Q00179976-I1Open ↗
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation2
08/13/2026Q00026604-I1Open ↗
08/13/2026Q00179976-I1Open ↗
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
09/29/2017420974716Open ↗