Elevator apt, semi-fireproof without stores
210 BRIGHTON 15 STREET
BROOKLYN · Brighton Beach · BIN 3245728
💬 Discuss this project
1951Year Built
6Stories
D1Building Class
R7-1Zoning
96,600 sfGross Floor Area
96Units
LL97 CoveredRent Stabilized5 Active Violations 2 unresolved · 3 paperwork only 1 old, status unconfirmed ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 200 Brighton 15th Street Owner · 30,465 sf lot · 3.17 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 3 docs
Floor 6Partition repair for new gas piping11p · 3 filings · 20 docs
Floor 5Partition repair for new gas piping10p · 4 filings · 20 docs
Floor 4Partition repair for new gas piping9p · 3 filings · 20 docs
Floor 3Partition repair for new gas piping9p · 3 filings · 20 docs
Floor 2Unit 2A10p · 3 filings · 20 docs
Floor 1Unit 1B11p · 3 filings · 20 docs
CellarBrookman Management Corp.23p · 5 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed3p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1511-1521 Brightwater Ave5203/21/2026
1511Brightwateravellc Newcastle4303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/20/2024$11.2M—1511-1521 BRIGHTWATER AVENUE LLC → 200 BRIGHTON 15TH STREET OWNER LLC$116/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mike Polychroniades P.E710/09/2026
Costa Arch & Engineering204/05/2022
Paul Gurdak Architect212/09/2021
Peter Pratt106/11/2021
A.P. Associates111/03/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Alma Realty603/21/2026
Costa403/21/2026
Hovann403/21/2026
Lombardo Building Consultants203/21/2026
Sandeep Kaur103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Maxwell Plumbing MechanicalPlumbing1007/08/2026
Parsons ConstructionScaffold507/08/2026
T.N.T. Plumbing & HeatingPlumbing406/28/2026
M Group ManagementGeneral Contractor303/21/2026
Bruci Construction ServicesGeneral Contractor303/21/2026
LTC Electrical ContractingElectrical203/21/2026
Dynamo ElectricalElectrical103/21/2026
Maxwell Plumbing Mechanicalspecialty_contractor107/08/2026
New York Standard MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Costa Architects & Engineering1321204/05/2022
Eti Consultants7694106/11/2021
Building Lifecycle
10/23/2026
Boiler inspection report filed
Initial · defects found · Accepted
10/09/2026
Filed — Alteration
Install (4) washing machines, (1) floor drain, (1) waste interceptor. Install (2) double stack gas dryers (4 total gas connections). Install (1) sprinkler head off of domestic service.
B00611347-P5
10/07/2026
Elevator Category 1 inspection report filed
10/07/2026
Elevator Category 5 inspection report filed
06/06/2026
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
B00611322-I1-PL
197 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedT.N.T. Plumbing & Heating06/06/2025
DOB NOWPlumbingPermit IssuedT.N.T. Plumbing & Heating05/02/2025
DOB NOWGeneral ConstructionSigned-offBruci Construction Services06/30/2022
DOB NOWPlumbingSigned-offNew York Standard Mechanical06/28/2022
DOB NOWGeneral ConstructionPermit IssuedMaxwell Plumbing Mechanical06/04/2022
DOB NOWPlumbingPermit IssuedMaxwell Plumbing Mechanical06/01/2022
DOB NOWPlumbingPermit IssuedMaxwell Plumbing Mechanical05/31/2022
DOB NOWSidewalk ShedPermit IssuedParsons Construction01/28/2022
DOB NOWSidewalk ShedPermit IssuedParsons Construction11/03/2021
DOB NOWStructuralSigned-offM Group Management07/08/2021
DOB NOWSidewalk ShedPermit IssuedParsons Construction11/05/2020
BISOTISSUEDTNT Contractors06/10/2020
BISPLISSUEDTri State Plumbing & Heating05/16/2019
BISPLISSUEDEZ Runer Construction05/02/2019
BISOTISSUEDAski Construction03/26/2019
BISOTISSUEDRovola Renovations02/07/2019
BISOTISSUEDProgeny Restoration08/10/2018
BISOTISSUEDProgeny Restoration08/10/2018
BISPLISSUEDThe Plumbing & Heating Specialist07/24/2018
BISPLISSUEDL & N Plumbing07/06/2018
BISOTISSUEDC & D of New York07/05/2018
BISOTISSUEDProgeny Restoration07/02/2018
BISPLISSUEDL & N Plumbing04/06/2018
BISOTISSUEDJN Windows & Doors03/21/2018
BISOTISSUEDC & D of New York03/05/2018
BISPLISSUEDEZ Runer Construction02/22/2018
BISOTISSUEDRovola Renovations01/25/2018
BISPLISSUEDEZ Runer Construction08/03/2017
BISPLISSUEDL & N Plumbing07/27/2017
BISOTISSUEDC & D of New York07/07/2017
BISPLISSUEDEZ Runer Construction06/22/2017
BISOTISSUEDRovola Renovations06/20/2017
BISOTISSUEDRovola Renovations06/20/2017
BISOTISSUEDJN Windows & Doors06/02/2017
BISOTISSUEDRovola Renovations05/11/2017
BISPLISSUEDL & N Plumbing05/04/2017
BISPLISSUEDL & N Plumbing05/04/2017
BISPLISSUEDL & N Plumbing04/28/2017
BISPLISSUEDL & N Plumbing04/07/2017
BISOTISSUEDC & D of New York03/31/2017
+ 21 more permits on file
2 projects · most recent 10/09/2026
Gas Water/Sanitary Plumbing-Sprinkler
FiledStatusContractorScope
10/09/2026Permit IssuedT.N.T. Plumbing & HeatingGas, Plumbing-Sprinkler, Water/Sanitary
03/21/2025Permit IssuedT.N.T. Plumbing & HeatingGas, Water/Sanitary
1 project · most recent 11/03/2020
FiledStatusContractorScope
11/03/2020Permit IssuedRichard Neu—
1 project · most recent 11/03/2020
Sidewalk Shed
FiledStatusContractorScope
11/03/2020Permit IssuedParsons ConstructionSidewalk Shed
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/19/2022Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
09/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/14/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
08/26/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/22/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
08/15/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/05/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/05/2022Energy Code Compliance InspectionsGeorge Paiderprogress
04/05/2022Fire-Resistance Rated ConstructionGeorge Paiderprogress
03/18/2022Fire-Resistant Penetrations and JointsPaul Antoniospecial
03/18/2022Energy Code Compliance InspectionsPaul Antonioprogress
03/11/2022Fire-Resistant Penetrations and JointsGeorge Paiderspecial
03/10/2022FinalGeorge Paiderprogress
520 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account