Walk-up cooperative
Mon Bijoux
210 EAST 17 STREET · Gramercy · BIN 1019548
💬 Discuss this project
1904Year Built
6Stories
C6Building Class
R7BZoning
16,278 sfGross Floor Area
25Units
Rent Stabilized12 Open Violations ▸FISP: SAFE
Walk-up cooperative · Owner of record: MON BIJOUX OWNERS CORPORATION · 4,048 sf lot · 4.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Roof5p · 1 filing · 4 docs
Floor 64p · 1 filing · 4 docs
Floor 54p · 1 filing · 4 docs
Floor 44p · 1 filing · 4 docs
Floor 34p · 1 filing · 4 docs
Floor 26p · 2 filings · 11 docs
Floor 112p · 4 filings · 14 docs
Sub-Basement4p · 1 filing · 4 docs
Site & exterior5p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EAST 17TH STREET HDFC1403/22/2026
RELIABLE ENTERPRISES1007/08/2026
HKS CONSTRUCTION807/08/2026
EAST 17TH ST H D F C703/21/2026
EAST 17 ST HOUSING DEVELOPMENT603/21/2026
210 E 17 HOFC403/21/2026
RHAMCO MANAGEMENT303/22/2026
MON BIJOUX OWNERS CORPORATION103/22/2026
HOUSINH DEVELOPMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SW ENGINEERING COMPANY106/29/2023
ENTHINK ENGINEERS LLC202/15/2023
ARCHITECTURE+CONSTRUCTION, PLLC106/13/2022
HAIDER ENGINEERING, P.E.212/18/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS103/21/2026
SNR EXPEDITING DESIGN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE ENTERPRISES INCGeneral Contractor607/08/2026
HKS CONSTRUCTION CORPGeneral Contractor407/08/2026
HNS CORPGeneral Contractor303/21/2026
ACCURATE CONTRACTING CORP.General Contractor203/21/2026
FABCON PRECAST LLCElectrical103/21/2026
PADMORE VEREElectrical103/21/2026
ABE HIMELFARBElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
VERE PADMOREElectrical103/21/2026
PORRINO, MARINElectrical103/21/2026
ALABAMA IRONWORKS INCElectrical103/21/2026
BEARD, JOIElectrical103/21/2026
CHRISTOPHER, STEPHENElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SWL ENGINEERING INSPECTIO6912106/29/2023
ARCHITECTURE+CONSTRUCTION1326106/13/2022
Building Lifecycle
All (76)Filed (6)Permit Issued (8)Signed Off (5)Facade (FISP) (18)Violation (29)Special Inspection (10)
05/26/2026
Violation issued (HPD, open)
B
01/02/2026
Violation issued (HPD, closed)
C
01/02/2026
Violation issued (HPD, closed)
C
01/02/2026
Violation issued (HPD, open)
C
05/24/2024
Cycle 9 facade report signed — SAFE
05/02/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00829278-I1
05/02/2024
Signed off — Alteration
M00828876-I1
04/26/2024
Signed off — Alteration
EXTERIOR REPAIRS INCLUDING STONE REPLACEMENT, BRICKWORK REPLACEMENT, AND STUCCO REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00869603-I1
04/12/2024
Cycle 9 facade report submitted
04/01/2024
Violation issued (HPD, closed)
A
03/20/2024
Cycle 9 facade inspection completed
11/29/2023
Permit issued — Sidewalk Shed
M00828876-I1-SH
11/28/2023
Permit issued — Supported Scaffold
M00829278-I1-SF
11/15/2023
Violation issued (HPD, closed)
I
09/18/2023
Permit issued — General Construction
M00869603-I1-GC
06/29/2023
Filed — Alteration
EXTERIOR REPAIRS INCLUDING STONE REPLACEMENT, BRICKWORK REPLACEMENT, AND STUCCO REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00869603-I1
02/16/2023
Cycle 9 facade report submitted
02/16/2023
Cycle 9 facade report signed — UNSAFE
02/16/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/15/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00829278-I1
02/15/2023
Permit issued — Supported Scaffold
M00829278-I1-SF
02/15/2023
Cycle 9 facade inspection completed
02/14/2023
Filed — Alteration
M00828876-I1
02/14/2023
Permit issued — Sidewalk Shed
M00828876-I1-SH
07/14/2022
Permit issued — General Construction
M00745181-I1-GC
06/13/2022
Filed — Alteration
M00745181-I1
05/25/2022
Special inspection requirement — Lighting controls
Joshua Pulver
05/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joshua Pulver
05/25/2022
Special inspection requirement — Final
Joshua Pulver
05/25/2022
Special inspection requirement — Energy Code Compliance Inspections
Joshua Pulver
05/25/2022
Special inspection requirement — Fire-Resistance Rated Construction
Joshua Pulver
05/25/2022
Special inspection requirement — Lighting in dwelling units
Joshua Pulver
05/25/2022
Special inspection requirement — Interior lighting power
Joshua Pulver
05/25/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Joshua Pulver
02/15/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
04/28/2020
Cycle 8 facade inspection completed
04/27/2020
Cycle 8 facade report signed — SAFE
01/29/2020
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00279931-I1
01/29/2020
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00282528-I1
01/20/2020
Cycle 8 facade report submitted
12/20/2019
Permit issued — Supported Scaffold
M00282528-I1-SF
12/18/2019
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00282528-I1
12/16/2019
Special inspection requirement — Final
JAFAR HAIDER
12/12/2019
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00279931-I1
12/12/2019
Permit issued — Sidewalk Shed
M00279931-I1-SH
12/11/2019
Special inspection requirement — Final
JAFAR HAIDER
02/21/2018
Cycle 8 facade report submitted
02/12/2018
Cycle 8 facade report signed — SWARMP
02/05/2018
Cycle 8 facade inspection completed
10/01/2015
Violation issued (HPD, closed)
I
07/10/2012
Cycle 7 facade report submitted
07/02/2012
Cycle 7 facade report signed — SAFE
05/23/2012
Cycle 7 facade inspection completed
11/30/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/29/2007
Cycle 6 facade report submitted
10/23/2007
Cycle 6 facade report signed — SAFE
06/06/2007
Cycle 6 facade inspection completed
12/22/2004
Violation issued (ECB, closed)
Boilers
05/08/2003
Violation issued (ECB, closed)
Construction
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC11/29/2023
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC11/28/2023
DOB NOWGeneral ConstructionSigned-offHNS CORP09/18/2023
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC02/15/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC02/14/2023
DOB NOWGeneral ConstructionPermit IssuedACCURATE CONTRACTING CORP07/14/2022
DOB NOWSupported ScaffoldSigned-offHKS CONSTRUCTION CORP12/20/2019
DOB NOWSidewalk ShedSigned-offHKS CONSTRUCTION CORP12/12/2019
BISPLISSUEDPILATO BROS PLBG & HTG CO02/12/2016
BISOTISSUEDTS & TS CONSTRUCTION INC02/09/2016
BISPLISSUEDS&H PLUMBING,INC01/13/2016
BISOTISSUEDAAA COMPLETE CONTRACTOR12/23/2015
BISOTISSUEDRPR REMODELING INC08/31/2015
BISPLISSUEDS&H PLUMBING,INC11/26/2014
BISOTISSUEDRPR REMODELING INC11/20/2014
BISOTISSUEDDELIN CONTRACTING CORP07/02/2014
BISPLISSUEDZ.W. PLBG & HTG CORP06/02/2011
BISPLISSUEDZ.W. PLBG & HTG CORP05/25/2010
BISPLISSUEDZ.W. PLBG & HTG CORP02/18/2009
BISOTISSUEDDG CUSTOM BUILT HOME & RE02/03/2009
BISPLISSUEDMACREDDIN PLBG & HTG INC07/25/2006
BISOTISSUEDEURO CONSTRUCTION MGMT INC04/18/2006
BISMHISSUEDVAN GOGH PAINTING AND CONTRACT C05/03/2005
BISPLISSUEDTMS PLMBG & HTG CORP04/06/2005
BISMHISSUEDTOWHOUSE CONSTRT INC02/24/2005
BISOTISSUEDTOWHOUSE CONSTRT INC02/24/2005
BISPLISSUEDZARA PLUMBING CORP11/30/2004
BISOTISSUEDVAN GOGH PAINTING AND CONTRACT C10/19/2004
BISEQISSUEDSTEEL INDUSTRIES07/28/2004
BISOTISSUEDNEW LIFE MASONRY & WATERPROOFING07/28/2004
BISBLISSUEDCITY GAS HTG SVC CO INC07/14/2004
BISPLISSUEDCITY GAS HTG SVC CO INC07/14/2004
BISOTISSUEDNY INTERIOR CONSTRUCTION04/22/2004
BISOTISSUEDEURO C ONSTR. MANAG. INC.12/23/2003
BISOTISSUEDTHE RENOVATED HOME 1 LTD03/31/2003
BISOTISSUEDFREDS GENERAL CONTRACTING06/11/2002
BISOTISSUEDBANNER CONSTRUCTION CORP10/23/1998
4 projects · most recent 05/09/2023
General Wiring
FiledStatusContractorScope
05/09/2023CompleteCODA ELECTRO CONT'G INC.General Wiring
02/17/2023CompleteRICHARD NEU—
09/20/2022CancelledPOWER SURGE ELECTRIC, INCGeneral Wiring
12/18/2019CompleteWCK ELECTRIC CORP.—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/25/2022Lighting controlsJoshua Pulverenergy_progress
05/25/2022Fire-Resistant Penetrations and JointsJoshua Pulverspecial
05/25/2022FinalJoshua Pulverprogress
05/25/2022Energy Code Compliance InspectionsJoshua Pulverprogress
05/25/2022Fire-Resistance Rated ConstructionJoshua Pulverprogress
05/25/2022Lighting in dwelling unitsJoshua Pulverenergy_progress
05/25/2022Interior lighting powerJoshua Pulverenergy_progress
05/25/2022HVAC-R and service water piping design and insulationJoshua Pulverenergy_progress
12/16/2019FinalJAFAR HAIDERprogress
12/11/2019FinalJAFAR HAIDERprogress
▾Documents — 117 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
09/02/2026M00745181-I1Request digital key ↗
08/31/2026M00828876-I1Request digital key ↗
08/31/2026M00829278-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00279931-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00282528-I1Request digital key ↗
▸Applications & Permits21
▸BISWORK PERMIT APPLICATION10
02/23/2016122675783Open ↗
02/11/2016122675783Open ↗
01/28/2016122199263Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
02/04/2016122675783Open ↗
01/12/2016122559203Open ↗
04/27/2015122351828Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWLPC Approval/Permit2
08/13/2026M00869603-I1Open ↗
08/13/2026M00745181-I1Open ↗
▸Seals & Professional Certifications38
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
06/13/2016122675783Open ↗
04/05/2016122199263Open ↗
02/26/2016122559203Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
02/04/2016122675783Open ↗
01/12/2016122559203Open ↗
01/12/2016122559203Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
02/04/2016122675783Open ↗
01/12/2016122559203Open ↗
01/12/2016122559203Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/02/2026M00745181-I1Open ↗
08/31/2026M00828876-I1Open ↗
08/13/2026M00829278-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026M00745181-I1Open ↗
08/28/2026M00745181-I1Open ↗
08/26/2026M00282528-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/30/2009110444029Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026M00745181-I1Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
02/04/2016122675783Open ↗
11/21/2014122199263Open ↗
05/05/2014121726891Open ↗
▸BISSCHEDULE B - PLUMBING2
07/29/2013121726891Open ↗
01/30/2009110444029Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
02/11/2015122199263Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan2
08/13/2026M00282528-I1Open ↗
08/13/2026M00279931-I1Open ↗
▸BISTenant Protection Plan and Notes1
02/11/2016122675783Open ↗
▸BISST-1: Street Tree Checklist1
01/30/2009110444029Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
02/04/2016122675783Open ↗
01/12/2016122559203Open ↗
07/29/2013121726891Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
04/27/2015122199263Open ↗
04/27/2015122199263Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/02/2026M00745181-I1Open ↗
08/13/2026M00869603-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/30/2009110444029Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
06/13/2016122675783Open ↗
02/04/2016122675783Open ↗
04/27/2015122351828Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
06/13/2016122675783Open ↗
▸Approvals, Objections & Sign-offs10
▸BISLANDMARKS APPROVAL5
06/13/2016122675783Open ↗
02/26/2016122559203Open ↗
02/11/2016122675783Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
06/13/2016122675783Open ↗
04/05/2016122199263Open ↗
02/26/2016122559203Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
01/27/2009110444029Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT10
06/13/2016122675783Open ↗
04/05/2016122199263Open ↗
02/26/2016122559203Open ↗
Showing 3 of 10 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
11/25/2014122199263Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET5
02/04/2016122675783Open ↗
01/12/2016122559203Open ↗
04/27/2015122351828Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION2
03/28/2016122199263Open ↗
05/07/2014121726891Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/11/2011110444029Open ↗