← Back
BuildNYC
Public elementary, junior or senior high
P.S. 116 Mary Lindley Murray
210 EAST 33RD STREET · BIN 1020080
💬 Discuss this project
1925Year Built
5Stories
W1Building Class
R8BZoning
51,210 sfGross Floor Area
1Units
LL97 Covered12 Active Violations 0 unresolved · 12 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 43,203 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofP.S. 116 - Manhattan1 filing · 17 docs
Floor 1P.S. 116 Mary Lindley Murray1 filing · 20 docs
Sub-BasementP.S. 116 Mary Lindley Murray1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority6503/21/2026
NYC Department of Education503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYC School Construction Authority509/17/2025
Infinity Design101/28/2025
Salam & Giacalone Architects110/01/2024
James A. Crocker303/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC School Construction Authority503/21/2026
Precision 3Sixty NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Anco Electl ContctngElectrical103/22/2026
An-K ElectricElectrical103/22/2026
Anco Electl ContctngElectrical103/21/2026
Laser Electrical Constr'gElectrical103/21/2026
Citywide Electrical ContractingElectrical103/21/2026
Laser Electrical ContractingElectrical103/22/2026
Jamcob ElectricElectrical103/21/2026
Slope ElectricElectrical103/21/2026
Building Lifecycle
All (105)Filed (10)Violation (60)Objection (10)Special Inspection (25)
04/16/2026
Violation issued (ECB, open)
Construction
04/16/2026
Violation issued (ECB, closed)
Construction
04/16/2026
Violation issued (ECB, open)
Construction
04/16/2026
Violation issued (ECB, open)
Construction
04/16/2026
Violation issued (ECB, open)
Construction
04/16/2026
Violation issued (ECB, open)
Construction
04/16/2026
Violation issued (ECB, open)
Construction
09/17/2025
Filed — Alteration
REMOVE AND REPLACE EXISTING WINDOWS & ROOFING SYSTEMS. MASONRY REPAIRS THROUGHOUT. FLOOD ELIMINATION WORK IN CELLAR. MINOR INTERIOR FINISH WORK. REPLACE ONE EXISTING BULKHEAD DOOR.
M01111994-P1
09/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/09/2025
Special inspection requirement — Structural Steel - Details
09/09/2025
Special inspection requirement — Final
09/09/2025
Special inspection requirement — Structural Steel - Welding
09/09/2025
Special inspection requirement — Structural Steel - High Strength Bolting
09/09/2025
Special inspection requirement — Concrete - Cast-In-Place
09/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/09/2025
Special inspection requirement — Masonry
09/09/2025
Special inspection requirement — Post-installed Anchors
05/09/2025
Violation issued (ECB, closed)
Construction
05/09/2025
Violation issued (ECB, open)
Construction
05/09/2025
Violation issued (ECB, open)
Construction
05/09/2025
Violation issued (ECB, open)
Construction
03/19/2025
Objection resolved — Addressed
03/19/2025
Objection resolved — Addressed
03/12/2025
Objection resolved — Addressed
03/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/06/2025
Objection resolved — Addressed
02/06/2025
Objection resolved — Addressed
01/30/2025
Objection raised — Other
01/28/2025
Filed — Alteration
Remove and install new non load bearing partitions, fixtures and finishes in bathroom.
M01016657-S5
01/16/2025
Objection raised — Other
01/16/2025
Objection raised — Other
01/07/2025
Filed — Alteration
REMOVE AND REPLACE EXISTING WINDOWS & ROOFING SYSTEMS. MASONRY REPAIRS THROUGHOUT. FLOOD ELIMINATION WORK IN CELLAR. MINOR INTERIOR FINISH WORK. REPLACE ONE EXISTING BULKHEAD DOOR.
M01111994-S2
01/06/2025
Filed — Alteration
REMOVE AND REPLACE EXISTING WINDOWS & ROOFING SYSTEMS. MASONRY REPAIRS THROUGHOUT. FLOOD ELIMINATION WORK IN CELLAR. MINOR INTERIOR FINISH WORK. REPLACE ONE EXISTING BULKHEAD DOOR.
M01111994-S1
01/06/2025
Filed — Alteration
REMOVE AND REPLACE EXISTING WINDOWS & ROOFING SYSTEMS. MASONRY REPAIRS THROUGHOUT. FLOOD ELIMINATION WORK IN CELLAR. MINOR INTERIOR FINISH WORK. REPLACE ONE EXISTING BULKHEAD DOOR.
M01111994-I1
01/06/2025
Special inspection requirement — Post-installed Anchors
01/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/03/2025
Filed — Alteration
Roof replacement, masonry repairs, window replacement and flood elimination.
M01152935-I1
01/03/2025
Special inspection requirement — Post-installed Anchors
01/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/30/2024
Special inspection requirement — Masonry
12/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/17/2024
Special inspection requirement — Structural Steel - High Strength Bolting
12/17/2024
Special inspection requirement — Structural Steel - Welding
12/17/2024
Special inspection requirement — Structural Steel - Details
12/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/17/2024
Special inspection requirement — Post-installed Anchors
12/09/2024
Special inspection requirement — Final
10/01/2024
Filed — Alteration
Remove and install new non load bearing partitions, fixtures and finishes in bathroom.
M01016657-S4
09/16/2024
Special inspection requirement — Final
09/16/2024
Special inspection requirement — Mechanical Systems
08/29/2024
Violation issued (ECB, open)
Boilers
07/22/2024
Violation issued (ECB, open)
Construction
07/22/2024
Violation issued (ECB, open)
Construction
07/22/2024
Violation issued (ECB, closed)
Construction
03/18/2024
Filed — Alteration
Remove and install new non load bearing partitions, fixtures and finishes in bathroom.
M01016657-S3
03/15/2024
Objection raised — Other
03/15/2024
Objection raised — Other
03/15/2024
Special inspection requirement — Final
03/08/2024
Filed — Alteration
Remove and install new non load bearing partitions, fixtures and finishes in bathroom.
M01016657-S1
03/08/2024
Filed — Alteration
Remove and install new non load bearing partitions, fixtures and finishes in bathroom.
M01016657-I1
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDVarsity Plumbing and Heating02/02/2022
BISOTISSUEDMac Contractor07/23/2021
BISPLISSUEDForsythe P&H06/18/2021
BISOTISSUEDCentral Mechanical Systems04/06/2021
BISOTISSUEDCentral Mechanical Systems04/06/2021
BISMHISSUEDCentral Mechanical Systems04/06/2021
BISOTISSUEDCentral Mechanical Systems04/06/2021
BISEQISSUEDCentral Mechanical Systems04/06/2021
BISOTISSUEDCentral Mechanical Systems04/06/2021
BISEQISSUEDCentral Mechanical Systems04/06/2021
BISPLISSUEDVarsity Plumbing and Heating02/03/2021
BISOTISSUEDNycsca12/30/2020
BISEQISSUEDMac Contractor09/02/2020
BISOTISSUEDMac Contractor07/15/2020
BISOTISSUEDMac Contractor07/10/2020
BISPLISSUEDVarsity Plumbing and Heating02/19/2020
BISOTISSUEDMac Contractor02/19/2020
BISOTISSUEDMac Contractor02/19/2020
BISEQISSUEDMac Contractor09/11/2019
BISPLISSUEDForsythe P&H10/11/2016
BISOTISSUEDCentral Mechanical Systems03/21/2016
BISOTISSUEDCentral Mechanical Systems03/21/2016
BISOTISSUEDCentral Mechanical Systems03/21/2016
BISEQISSUEDCentral Mechanical Systems03/21/2016
BISOTISSUEDCentral Mechanical Systems03/21/2016
BISEQISSUEDCentral Mechanical Systems03/21/2016
BISEQISSUEDCentral Mechanical Systems03/21/2016
BISMHISSUEDCentral Mechanical Systems03/21/2016
BISEQISSUEDCentral Mechanical Systems11/16/2015
BISOTISSUEDCentral Mechanical Systems11/16/2015
BISFBISSUEDForsythe P&H10/23/2015
BISPLISSUEDForsythe P&H10/23/2015
BISEQISSUEDCentral Mechanical Systems10/07/2015
BISEQISSUEDCentral Mechanical Systems10/07/2015
BISMHISSUEDKW Tech08/25/2015
BISOTISSUEDCentral Mechanical Systems04/28/2015
BISOTISSUEDCentral Mechanical Systems04/28/2015
BISOTISSUEDCentral Mechanical Systems03/24/2015
BISMHISSUEDCentral Mechanical Systems03/24/2015
BISOTISSUEDCentral Mechanical Systems11/07/2014
+ 10 more permits on file
1 project · most recent 09/17/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/17/2025——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Carrier 38HDR060-3 56,000 BTU · Condensing Unit ×3
40QAC060-311 56,000 BTU · Fan Coil Indoor ×3
Mitsubishi Electric PKA-A18LA1 22,000 BTU · Fan Coil Indoor ×1
PUZ-A18NKA7 22,000 BTU · Condensing Unit ×1
Ventilation
Greenheck GB-097-4 130 CFM · Exhaust Fan ×1
GB-098-4 640 CFM · Exhaust Fan ×1
GB-099-4 750 CFM · Exhaust Fan ×1
GB-260-5 3,300 CFM · Exhaust Fan ×1
GB-3360-15 8,010 CFM · Exhaust Fan ×1
GPI-28x32-G12 3,000 CFM ×1
1 project · most recent 01/28/2025
Water/Sanitary
FiledStatusContractorScope
01/28/2025——Water/Sanitary
6 projects · most recent 04/09/2024
General Wiring Lighting
FiledStatusContractorScope
04/09/2024CancelledAn-K ElectricGeneral Wiring
09/08/2021CompleteAnco Electl ContctngGeneral Wiring
07/14/2021CompleteJamcob ElectricGeneral Wiring
10/28/2019CompleteLaser Electrical Contracting—
08/27/2019CompleteSlope ElectricGeneral Wiring, Lighting
01/14/2019CompleteLaser Electrical Constr'g—
2 projects · most recent 09/17/2025
Masonry
FiledStatusContractorScope
09/17/2025——Masonry
01/03/2025——Masonry
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
09/09/2025Structural Stability – Alterations of existing buildings—special
09/09/2025Structural Steel - Details—special
09/09/2025Final—progress
09/09/2025Structural Steel - Welding—special
09/09/2025Structural Steel - High Strength Bolting—special
09/09/2025Concrete - Cast-In-Place—special
09/09/2025Fire-Resistant Penetrations and Joints—special
09/09/2025Masonry—special
09/09/2025Post-installed Anchors—special
03/12/2025Fire-Resistant Penetrations and Joints—special
01/06/2025Post-installed Anchors—special
01/06/2025Fire-Resistant Penetrations and Joints—special
01/03/2025Post-installed Anchors—special
01/03/2025Fire-Resistant Penetrations and Joints—special
12/30/2024Masonry—special
12/17/2024Structural Stability – Alterations of existing buildings—special
12/17/2024Structural Steel - High Strength Bolting—special
12/17/2024Structural Steel - Welding—special
12/17/2024Structural Steel - Details—special
12/17/2024Fire-Resistant Penetrations and Joints—special
12/17/2024Post-installed Anchors—special
12/09/2024Final—progress
09/16/2024Final—progress
09/16/2024Mechanical Systems—special
03/15/2024Final—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 116 - ManhattanEducationCellar, Floors 1–5, Roof
Project M01111994 Alteration · Approved · 01/06/2025
Project M01152935 Alteration · Filing Withdrawn · 01/03/2025
P.S. 116 Mary Lindley MurrayEducationSub-basement, Floor 1
Project M01016657 Alteration · Filing Withdrawn · 03/08/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/26/2026M01016657-I1Request digital key ↗
08/26/2026M01016657-S5Request digital key ↗
08/26/2026M01016657-S4Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
03/05/2009110465773Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/25/2026M01152935-I1Open ↗
08/13/2026M01016657-S1Open ↗
08/13/2026M01016657-S3Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/05/2009110465773Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/05/2009110465773Open ↗
▸Trade Schedules & Equipment2
▸BISFA - FDNY APPROVAL : FD-FAA1
09/09/2021104212567Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
03/05/2009110465773Open ↗
▸Approvals, Objections & Sign-offs26
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/13/2026M01152935-I1Open ↗
08/13/2026M01016657-S3Open ↗
08/13/2026M01111994-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)10
08/13/2026M01152935-I1Open ↗
08/13/2026M01016657-S5Open ↗
08/13/2026M01016657-S4Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/13/2026M01016657-I1Open ↗
08/13/2026M01016657-S5Open ↗
08/13/2026M01016657-S1Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
03/05/2009110465773Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026M01111994-S2Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
03/05/2009110465773Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/05/2009110465773Open ↗
▸Other Documents12
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal10
08/13/2026M01111994-S2Open ↗
08/13/2026M01111994-P1Open ↗
08/13/2026M01111994-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026M01111994-I1Open ↗
08/13/2026M01111994-P1Open ↗