← Back
BuildNYC
Over six families without stores
210 PALMETTO STREET
BROOKLYN · BIN 3326173
💬 Discuss this project
1983Year Built
3Stories
C1Building Class
R6Zoning
99,040 sfGross Floor Area
96Units
LL97 CoveredRent Stabilized26 Active Violations 4 likely answered ▸FDNY Report ↗
Over six families without stores · Owner of record: Hope Gardens 1 · 120,200 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1Unit 1B, Unit 1C, Unit 1D1p · 1 filing · 4 docs
CellarHope Gardens - Group DUnder Construction18p · 5 filings · 20 docs
Site & exteriorGround improvement and flowable fill15p · 3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Pennrose4310/13/2026
New York City Housing Authority803/21/2026
Hope Gardens I303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cameron Engineering409/18/2026
Christopher Compton704/17/2023
Haley & Aldrich of New York203/30/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECC1803/21/2026
JM Zoning403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Romax GroupGeneral Contractor707/08/2026
Procida Constructionspecialty_contractor504/09/2026
Miller Plumbing & HeatingPlumbing307/08/2026
J-J PlumbingPlumbing303/21/2026
HI-Lights ElectricalElectrical103/21/2026
G.M.A. Plumbing & HeatingPlumbing107/08/2026
Romax GroupScaffold107/08/2026
A. Heating and Plumbing WorksPlumbing107/08/2026
Interstate Restorationspecialty_contractor107/08/2026
Bright Power InstallationGeneral Contractor106/17/2020
Procida ConstructionGeneral Contractor612/11/2020
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering106409/18/2026
Environmental Code Consulting5516703/30/2023
H & A of New York Engineering642203/30/2023
Building Lifecycle
09/18/2026
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER PIPING FROM THE CELLAR TO OUTSIDE; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00963057-P2
08/28/2026
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
08/28/2026
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
08/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
08/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
80 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedProcida Construction01/07/2026
DOB NOWMechanical SystemsPermit IssuedProcida Construction01/27/2025
DOB NOWPlumbingPermit IssuedMiller Plumbing & Heating09/04/2024
DOB NOWPlumbingPermit IssuedMiller Plumbing & Heating05/03/2024
DOB NOWMechanical SystemsPermit IssuedProcida Construction02/08/2024
DOB NOWSupport of ExcavationSigned-offRomax Group05/02/2023
DOB NOWProtection and Mechanical MethodsSigned-offRomax Group05/02/2023
DOB NOWEarth WorkSigned-offRomax Group05/02/2023
DOB NOWSupport of ExcavationSigned-offRomax Group04/05/2023
DOB NOWBoiler EquipmentPermit IssuedD.H. Eagle Plumbing01/18/2023
DOB NOWGeneral ConstructionSigned-offInterstate Restoration05/03/2022
DOB NOWBoiler EquipmentSigned-offG.M.A. Plumbing & Heating01/12/2022
BISBLISSUEDJ-J Plumbing03/24/2022
BISPLISSUEDJ-J Plumbing02/07/2022
BISBLISSUEDJ-J Plumbing03/25/2021
BISPLISSUEDJ-J Plumbing12/28/2020
BISOTISSUEDProcida Construction12/11/2020
BISMHISSUEDProcida Construction12/11/2020
BISBLISSUEDJ-J Plumbing11/30/2020
BISOTISSUEDBright Power Installation06/17/2020
BISOTISSUEDProcida Construction05/05/2020
BISMHISSUEDProcida Construction05/05/2020
BISBLISSUEDJ-J Plumbing12/26/2019
BISOTISSUEDProcida Construction10/03/2019
BISMHISSUEDProcida Construction10/03/2019
1 project · most recent 09/18/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/18/2026Permit IssuedMiller Plumbing & HeatingGas, Storm, Water/Sanitary
6 projects · most recent 11/03/2025
General Wiring
FiledStatusContractorScope
11/03/2025Permit IssuedHI-Lights Electrical—
09/19/2022CompleteWire Up Electrical Cont'g—
09/05/2021CompleteWire Up Electrical Cont'g—
05/27/2020CompleteVenture Home Solar—
03/02/2020CompleteMonte Electric—
02/26/2020CompleteRamdeen's Electric ContractingGeneral Wiring
1 project · most recent 09/18/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
09/18/2026Permit IssuedProcida ConstructionTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/01/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
08/28/2026Mechanical SystemsGEORGE GHEBRYALspecial
08/28/2026Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
08/28/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
08/28/2026Tenant Protection Plan Compliance—special
08/28/2026HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
08/28/2026FinalGEORGE GHEBRYALprogress
01/10/2024Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
12/26/2023Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
12/26/2023Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
12/26/2023Post-installed AnchorsGEORGE GHEBRYALspecial
12/26/2023HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
12/26/2023Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
12/26/2023Post-installed AnchorsGEORGE GHEBRYALspecial
12/26/2023HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
11/15/2023Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
11/15/2023FinalGEORGE GHEBRYALprogress
11/15/2023Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
11/15/2023Mechanical SystemsGEORGE GHEBRYALspecial
11/21/2022Tenant Protection Plan ComplianceCHRISTOPHER COMPTONspecial
11/18/2022Heating SystemsCHRISTOPHER COMPTONspecial
05/17/2022Heating SystemsCHRISTOPHER COMPTONspecial
03/10/2022Heating SystemsCHRISTOPHER COMPTONspecial
157 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account