← Back
Elevator apt, semi-fireproof without stores
210 WEST 107 STREET
MANHATTAN · Upper West Side-Manhattan Valley · BIN 1056642
💬 Discuss this project
1925Year Built
6Stories
D1Building Class
R8BZoning
53,250 sfGross Floor Area
53Units
LL97 CoveredRent Stabilized51 Open Violations 35 unresolved · 16 paperwork only ▸FISP: SWARMP
Elevator apt, semi-fireproof without stores · Owner of record: 210 W 107 STREET LLC · 12,615 sf lot · 4.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction17p · 2 filings · 20 docs
Floor 56p · 2 filings · 20 docs
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorUnder Construction22p · 4 filings · 20 docs
Filed — no permit issued4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRIHILL MANAGEMENT707/19/2026
WKR CONSTRUCTION507/08/2026
210 WEST 107 LLC503/21/2026
LKR CONSTRUCTION403/21/2026
DERMOT403/21/2026
HF Management109/13/2026
210 W 107 STREET LLC103/22/2026
EMERALD EQUITY GROUP103/22/2026
KRF MANAGEMENT COMPANY103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/06/2018$26.5M—210 WEST 107 LLC → 210 W 107 STREET LLC$498/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SURFACE DESIGN205/28/2026
MJE PROFESSIONAL SERVICES109/10/2024
RIGID STRUCTURAL DESIGN, LLC105/13/2024
ENTHINK ENGINEERS LLC104/19/2023
CHRISTOPHER TEETER112/08/2022
ARJUNE DESIGN STUDIO406/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN203/21/2026
Rigid Structural Design, LLC103/21/2026
CHRISTOPHER TEETER RA203/21/2026
QUICK FILING OF NY INC403/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
PS ENGINEERS403/21/2026
QUICK FILING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WKR CONSTRUCTION, INCGeneral Contractor707/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor707/19/2026
D.J.DEMA PAINTING CORPGeneral Contractor203/21/2026
INTERSYSTEMS INSTAL S&SGeneral Contractor207/08/2026
SENAD MEHOVICElectrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
TROADIO MENENDEZElectrical103/21/2026
CEESAY, BELALElectrical103/21/2026
CARA PLUMBING GROUP INCPlumbing107/08/2026
FOREST BROOK ELEC'L CONTRElectrical103/22/2026
GREGORY PAPANTONIOUElectrical103/21/2026
RAPPO, FRANKElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEORGE J. XERAKIAS, PE1658205/28/2026
SURFACE DESIGN PROFESSION3968205/28/2026
FRANCISCO D. PEREZ PE3306204/24/2024
ADS SPECIAL INSPECTIONS1270406/27/2022
Building Lifecycle
All (146)Filed (12)Permit Issued (17)Signed Off (4)Facade (FISP) (21)Violation (60)Objection (16)Special Inspection (16)
08/05/2026
Signed off — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M00926542-I1
08/05/2026
Cycle 9 facade report signed — SWARMP
07/17/2026
Permit issued — Sidewalk Shed
M00861667-I1-SH
07/14/2026
Cycle 9 facade report submitted
07/08/2026
Cycle 9 facade inspection completed
06/15/2026
Special inspection requirement — Air barrier - visual inspection
MOLLY FORR
06/15/2026
Special inspection requirement — Masonry
MOLLY FORR
06/15/2026
Special inspection requirement — Post-installed Anchors
MOLLY FORR
06/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
George Xerakias
06/15/2026
Special inspection requirement — Final
Benson Gillespie
05/28/2026
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M00926542-P2
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Special inspection requirement — Post-installed Anchors
MOLLY FORR
04/29/2026
Special inspection requirement — Air barrier - visual inspection
MOLLY FORR
04/29/2026
Special inspection requirement — Final
Benson Gillespie
04/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
George Xerakias
04/29/2026
Special inspection requirement — Masonry
MOLLY FORR
04/27/2026
Permit issued — Sidewalk Shed
M00861667-I1-SH
03/11/2026
Signed off — Alteration
M01106708-I1
03/11/2026
Permit issued — General Construction
M00926542-I1-GC
03/05/2026
Signed off — Alteration
File-SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FAADE RESTORATION AND INSPECTION. ALSO, INSTALL HOIST ON ROOF.
M01027048-I1
01/12/2026
Cycle 9 facade report submitted
01/12/2026
Cycle 9 facade report signed — UNSAFE
12/11/2025
Cycle 9 facade inspection completed
12/09/2025
Signed off — Alteration
M01046646-I1
09/30/2025
Permit issued — Sidewalk Shed
M01046646-I1-SH
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
A
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
A
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
05/21/2025
Violation issued (HPD, open)
C
05/21/2025
Violation issued (HPD, closed)
B
05/21/2025
Violation issued (HPD, open)
B
05/21/2025
Violation issued (HPD, closed)
B
05/21/2025
Violation issued (HPD, open)
A
05/21/2025
Violation issued (HPD, open)
B
05/21/2025
Violation issued (HPD, closed)
B
05/21/2025
Violation issued (HPD, closed)
B
05/21/2025
Violation issued (HPD, closed)
B
05/21/2025
Violation issued (HPD, open)
A
05/21/2025
Violation issued (HPD, closed)
B
05/14/2025
Violation issued (HPD, open)
A
05/14/2025
Violation issued (HPD, closed)
B
05/14/2025
Violation issued (HPD, open)
A
05/14/2025
Violation issued (HPD, closed)
B
05/14/2025
Violation issued (HPD, open)
C
05/14/2025
Violation issued (HPD, open)
A
05/14/2025
Violation issued (HPD, closed)
B
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, closed)
B
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, open)
A
Latest 60 of 146 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC07/17/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC04/27/2026
DOB NOWGeneral ConstructionSigned-offWKR CONSTRUCTION, INC03/11/2026
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S09/30/2025
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC04/28/2025
DOB NOWGeneral ConstructionSigned-offWKR CONSTRUCTION, INC04/11/2025
DOB NOWSupported ScaffoldSigned-offWKR CONSTRUCTION, INC04/10/2025
DOB NOWSuspended ScaffoldSigned-offWKR CONSTRUCTION INC04/10/2025
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S10/30/2024
DOB NOWSupported ScaffoldSigned-offWKR CONSTRUCTION, INC09/27/2024
DOB NOWSuspended ScaffoldPermit IssuedWKR CONSTRUCTION INC05/10/2024
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC04/30/2024
DOB NOWGeneral ConstructionSigned-offWKR CONSTRUCTION, INC04/25/2024
DOB NOWSuspended ScaffoldSigned-offWKR CONSTRUCTION INC04/12/2024
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC05/10/2023
DOB NOWGeneral ConstructionPermit IssuedD.J.DEMA PAINTING CORP06/09/2022
DOB NOWPlumbingPermit IssuedPRIME PLMBG & HTG OF NY04/28/2022
BISPLISSUEDSO PLUMBING & HEATING INC12/12/2018
BISOTISSUEDEXCEL MGMT & MAINTENANCE11/13/2018
BISPLISSUEDS & L PLUMBING INC07/11/2018
BISOTISSUEDRONG MAINTENANCE INC07/05/2018
BISOTISSUEDAMACO MANAGEMENT & CONSUL04/29/2016
BISOTISSUEDAMACO MANAGEMENT & CONSUL01/14/2016
BISOTISSUEDFUTUREISTIC DEVELOPMENT I03/10/2015
BISOTISSUEDKYW MANAGEMENT COMPANY IN11/17/2014
BISOTISSUEDFUTUREISTIC DEVELOPMENT I01/09/2014
BISOTISSUEDFUTUREISTIC DEVELOPMENT I12/19/2013
BISEQISSUEDLKR CONSTRUCTION INC04/30/2013
BISPLISSUEDS & L PLUMBING INC03/27/2013
BISOTISSUEDAMACO MANAGEMENT & CONSUL03/13/2013
BISOTISSUEDMISHKIN CONTRACTING_INC.05/12/2006
BISEQISSUEDCOLATTE SCAFF.04/26/2004
1 project · most recent 06/27/2022
Gas Water/Sanitary
FiledStatusContractorScope
06/27/2022Permit IssuedCARA PLUMBING GROUP INCGas, Water/Sanitary
4 projects · most recent 07/21/2025
General Wiring
FiledStatusContractorScope
07/21/2025Permit IssuedAURORA ELECL CONTG INC—
04/20/2023Permit IssuedBOROWIDE ELECT'L CONTR'S—
12/08/2020CompleteFOREST BROOK ELEC'L CONTRGeneral Wiring
07/13/2018Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
06/15/2026Air barrier - visual inspectionMOLLY FORRenergy_progress
06/15/2026MasonryMOLLY FORRspecial
06/15/2026Post-installed AnchorsMOLLY FORRspecial
06/15/2026Tenant Protection Plan ComplianceGeorge Xerakiasspecial
06/15/2026FinalBenson Gillespieprogress
04/29/2026Post-installed AnchorsMOLLY FORRspecial
04/29/2026Air barrier - visual inspectionMOLLY FORRenergy_progress
04/29/2026FinalBenson Gillespieprogress
04/29/2026Tenant Protection Plan ComplianceGeorge Xerakiasspecial
04/29/2026MasonryMOLLY FORRspecial
05/10/2024Post-installed AnchorsFRANCISCO PEREZspecial
06/27/2022Lighting in dwelling unitsNISCHAL ARJUNEenergy_progress
06/27/2022Energy Code Compliance InspectionsNISCHAL ARJUNEprogress
06/27/2022FinalNISCHAL ARJUNEprogress
06/27/2022Fire-Resistant Penetrations and JointsNISCHAL ARJUNEspecial
06/27/2022Fire-Resistant Penetrations and JointsNISCHAL ARJUNEspecial
▾Documents — 232 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/02/2026M00546475-P1Request digital key ↗
09/02/2026M00546530-P1Request digital key ↗
09/01/2026M08023365-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION15
11/09/2018123407367Open ↗
07/05/2018123519433Open ↗
04/28/2016140489031Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION13
12/12/2018123407367Open ↗
11/13/2018123407367Open ↗
07/12/2018123519433Open ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications67
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
11/09/2018123407367Open ↗
07/05/2018123519433Open ↗
09/13/2016140489031Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/02/2026M00546475-I1Open ↗
09/02/2026M00546530-I1Open ↗
09/01/2026M08023365-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/30/2026M00926542-I1Open ↗
08/30/2026M00926542-I1Open ↗
08/30/2026M00546475-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
11/09/2018123407367Open ↗
04/28/2016140489031Open ↗
01/13/2016140448674Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/30/2026M00926542-I1Open ↗
08/30/2026M00546475-I1Open ↗
08/30/2026M00546475-I1Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
04/28/2016140489031Open ↗
01/13/2016140448674Open ↗
03/07/2015140317805Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
04/28/2016140489031Open ↗
01/13/2016140448674Open ↗
03/07/2015140317805Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
11/09/2018123407367Open ↗
07/05/2018123519433Open ↗
03/21/2013121375127Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
03/21/2013121375127Open ↗
03/15/2013121565056Open ↗
05/25/2011120701259Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING4
05/14/2013121375127Open ↗
04/25/2013121375127Open ↗
03/21/2013121375127Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/09/2018123407367Open ↗
07/05/2018123519433Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
06/06/2013121375127Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes3
11/13/2018123407367Open ↗
07/05/2018123519433Open ↗
04/28/2016140489031Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/26/2011120701240Open ↗
▸BISSTREET TREE CHECKLIST1
05/26/2011120701240Open ↗
▸Environmental & Asbestos18
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
11/13/2018123407367Open ↗
07/05/2018123519433Open ↗
04/28/2016140489031Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/17/2026M00926542-P2Open ↗
08/15/2026M00546475-I1Open ↗
08/14/2026M00546530-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
05/26/2011120701240Open ↗
05/25/2011120701259Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
03/15/2013121565056Open ↗
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
11/09/2018123407367Open ↗
07/05/2018123519433Open ↗
09/13/2016140489031Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
09/13/2016140489031Open ↗
06/14/2016140448674Open ↗
07/17/2015140317805Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
04/28/2016140489031Open ↗
01/13/2016140448674Open ↗
03/07/2015140317805Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
04/28/2016140489031Open ↗
01/13/2016140448674Open ↗
03/07/2015140317805Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections1
03/11/2015140280201Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/26/2011120701240Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
04/28/2016140489031Open ↗
01/13/2016140448674Open ↗
03/07/2015140317805Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs13
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
09/13/2016140489031Open ↗
06/14/2016140448674Open ↗
07/17/2015140317805Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
03/21/2013121375127Open ↗
03/15/2013121565056Open ↗
05/26/2011120701240Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/14/2014140074327Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT18
11/09/2018123407367Open ↗
07/05/2018123519433Open ↗
09/13/2016140489031Open ↗
Showing 3 of 18 on file for this type
▸Filing & Intake Forms15
▸BISEFILING JOB APPLICATION COVER SHEET8
04/28/2016140489031Open ↗
01/13/2016140448674Open ↗
03/07/2015140317805Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET4
11/09/2018123407367Open ↗
07/05/2018123519433Open ↗
05/26/2011120701240Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
05/14/2013121565056Open ↗
04/30/2013121375127Open ↗
03/21/2013121565056Open ↗
▸Other Documents14
▸DOB NOWHPD4: CONH Pilot Program5
08/17/2026M00926542-P2Open ↗
08/13/2026M00926542-I1Open ↗
08/13/2026M00861667-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDHCR Document4
08/15/2026M00546475-I1Open ↗
08/14/2026M00546530-I1Open ↗
08/13/2026M00546530-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations2
08/13/2026M01027048-P1Open ↗
08/13/2026M01027048-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01027048-I1Open ↗
08/13/2026M01027048-P1Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
03/15/2013121565056Open ↗