← Back
Walk-up apt, over six families with stores
2100 2 AVENUE
MANHATTAN · BIN 1052801
💬 Discuss this project
1920Year Built
6Stories
C7Building Class
R9AZoning
24,644 sfGross Floor Area
41Units
Rent Stabilized47 Open Violations 46 unresolved · 1 paperwork only ▸FISP: No Report Filed
Walk-up apt, over six families with stores · Owner of record: 2100 2ND AVE LLC · 5,000 sf lot · 4.93 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction10p · 1 filing · 17 docs
Floor 1Under Construction13p · 4 filings · 20 docs
CellarUnder Construction12p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CENTENNIAL PROPERTIES NY INC.608/29/2026
2100 2ND AVE3703/22/2026
108 STREET MEMBER LLC203/22/2026
MANN REALTY ASSC103/22/2026
9300 REALTY LLC103/21/2026
BSW CONSTRUCTION303/21/2026
J G GNRL CONTRACT203/21/2026
SAABI CONSTRUCTION203/21/2026
EAST 110TH REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STV INCORPORATED106/08/2026
KIERAN PATRICK SPILLANE305/13/2026
JOSE L. PENA,P.E.209/19/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.403/21/2026
JANCO BUILDING CONSULTANTS, LLC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHETRAM, RISHIRAMElectrical103/21/2026
IP YUElectrical103/21/2026
MICHAEL BAPTISTEElectrical103/21/2026
MIKHAIL LEYBMANElectrical103/21/2026
QUINTANA, DAVIDElectrical103/21/2026
TRINCITY ELECTRIC, INCElectrical103/22/2026
YU IPElectrical103/21/2026
C.A.C. INDUSTRIES, INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106306/08/2026
JOSE L. PENA, P.E5969209/19/2019
Building Lifecycle
All (101)Filed (6)Permit Issued (1)Violation (60)Objection (4)Special Inspection (30)
08/25/2026
Violation issued (HPD, open)
C
08/18/2026
Violation issued (HPD, open)
B
08/18/2026
Violation issued (HPD, open)
B
08/18/2026
Violation issued (HPD, open)
B
08/18/2026
Violation issued (HPD, open)
B
08/18/2026
Violation issued (HPD, open)
B
08/18/2026
Violation issued (HPD, open)
B
07/18/2026
Violation issued (HPD, open)
B
07/18/2026
Violation issued (HPD, open)
B
07/18/2026
Violation issued (HPD, open)
B
07/18/2026
Violation issued (HPD, open)
C
07/18/2026
Violation issued (HPD, open)
C
07/18/2026
Violation issued (HPD, open)
B
07/18/2026
Violation issued (HPD, open)
B
07/04/2026
Violation issued (HPD, open)
C
06/18/2026
Permit issued — General Construction
M01120847-S1-GC-CX
06/09/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Masonry
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Preliminary
KIERAN SPILLANE
06/09/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
06/08/2026
Filed — Alteration
Filing for the removal of the vault.
M01407073-I1
06/02/2026
Violation issued (HPD, open)
A
06/02/2026
Violation issued (HPD, open)
A
06/02/2026
Violation issued (HPD, open)
C
06/02/2026
Violation issued (HPD, open)
A
06/02/2026
Violation issued (HPD, open)
B
05/29/2026
Violation issued (HPD, open)
B
05/29/2026
Violation issued (HPD, closed)
B
05/29/2026
Violation issued (HPD, open)
B
05/22/2026
Objection resolved — Addressed
05/21/2026
Objection raised — Scope
05/13/2026
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building underpinning. Repair and strengthen existing foundation walls and columns, with inclusion of mini piles.
M01120847-P3
05/11/2026
Special inspection requirement — Subgrade Inspections
05/11/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
05/11/2026
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
05/11/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
05/11/2026
Special inspection requirement — Post-installed Anchors
05/11/2026
Special inspection requirement — Structural Steel - High Strength Bolting
05/11/2026
Special inspection requirement — Preliminary
05/11/2026
Special inspection requirement — Structural Steel - Welding
04/29/2026
Violation issued (HPD, open)
C
04/29/2026
Violation issued (HPD, open)
B
04/20/2026
Violation issued (ECB, open)
Construction
03/13/2026
Violation issued (HPD, closed)
C
02/06/2026
Violation issued (HPD, open)
C
02/06/2026
Violation issued (HPD, closed)
B
02/06/2026
Violation issued (HPD, closed)
B
02/06/2026
Violation issued (HPD, closed)
B
02/06/2026
Violation issued (HPD, closed)
B
01/16/2026
Violation issued (HPD, closed)
B
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedC.A.C. INDUSTRIES, INC06/18/2026
BISOTISSUEDCONSTRUCTION XPERT INC09/06/2018
BISFPISSUEDMETFLOW FIRE CONTROL LLC08/03/2018
BISPLISSUEDTOP DOG PLBG & HTG CORP04/23/2018
BISOTISSUEDMERRICK REAL ESTATE GP IN07/07/2017
BISFPISSUEDACTIVE FIRE CONTROL, INC05/12/2017
BISPLISSUEDTOP DOG PLBG & HTG CORP05/01/2017
BISPLISSUEDTOP DOG PLBG & HTG CORP05/01/2017
BISOTISSUEDBSW GENERAL CONSTRUCTION01/17/2017
BISOTISSUEDBRICK BY BRICK CONTRACTIN12/28/2016
BISOTISSUEDBRICK BY BRICK CONTRACTIN12/22/2016
BISPLISSUEDVILLAGE P & H NY INC10/11/2016
BISOTISSUEDNBS CONSTRUCTION CORP09/29/2016
BISEQISSUEDJ& G GNRL CONTRACT INC08/25/2016
BISOTISSUEDC2 CONSTRUCTION CORP07/18/2016
BISOTISSUEDPERFECTLY RELIABLE CONSTR04/14/2016
BISOTISSUEDJCT DEVELOPMENT NY INC04/05/2016
BISOTRE-ISSUEDPERFECTLY RELIABLE CONSTR03/09/2016
BISPLISSUEDORION PLUMBING & HTG CORP02/10/2016
BISOTISSUEDPERFECTLY RELIABLE CONSTR10/26/2015
BISFPISSUEDMASTER FIRE SYSTEMS, INC11/06/2009
BISOTISSUEDCOVENTRY INTERIORS INC07/28/2009
BISEQISSUEDCOVENTRY INTERIORS INC07/28/2009
BISPLISSUEDARBEN CONTRACTING INC03/19/2009
BISEQISSUEDCOVENTRY INTERIORS INC03/19/2009
BISMHISSUEDCOVENTRY INTERIORS INC03/19/2009
BISPLISSUEDPINNACLE PLBG & HTG CORP10/20/2008
BISBLISSUEDPINNACLE PLBG & HTG CORP10/20/2008
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEM09/04/2007
BISFBISSUEDSTEPHEN BRAUN04/17/2007
BISFPISSUEDMASTER FIRE PREVENTION SYSTEM IN12/15/1993
1 project · most recent 09/19/2019
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/19/2019——Air Conditioning Systems
Cooling
Senville SENVILLE 18,000 BTU ×3
1 project · most recent 09/17/2019
Water/Sanitary
FiledStatusContractorScope
09/17/2019——Water/Sanitary
1 project · most recent 12/12/2019
FiledStatusContractorScope
12/12/2019CompleteTRINCITY ELECTRIC, INC43 meters, 1 new_meters
2 projects · most recent 06/08/2026
FiledStatusContractorScope
06/08/2026——1 scope_items
05/13/2026Permit IssuedC.A.C. INDUSTRIES, INC1 scope_items
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
06/09/2026Post-installed AnchorsGEORGE GHEBRYALspecial
06/09/2026MasonryGEORGE GHEBRYALspecial
06/09/2026Structural Steel - DetailsGEORGE GHEBRYALspecial
06/09/2026Footing and FoundationGEORGE GHEBRYALprogress
06/09/2026FinalGEORGE GHEBRYALprogress
06/09/2026PreliminaryKIERAN SPILLANEprogress
06/09/2026Construction Operations Influencing Adjacent StructuresGEORGE GHEBRYALspecial
06/09/2026Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
06/09/2026Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
06/09/2026Subgrade InspectionsGEORGE GHEBRYALspecial
06/09/2026Underpinning and alternate methods of support of buildings and adjacent propertyGEORGE GHEBRYALspecial
06/09/2026Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
06/09/2026Structural Steel - WeldingGEORGE GHEBRYALspecial
06/09/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
05/11/2026Subgrade Inspections—special
05/11/2026Subsurface Conditions – Fill Placement & In-Place Density—special
05/11/2026Underpinning and alternate methods of support of buildings and adjacent property—special
05/11/2026Construction Operations Influencing Adjacent Structures—special
05/11/2026Post-installed Anchors—special
05/11/2026Structural Steel - High Strength Bolting—special
05/11/2026Preliminary—progress
05/11/2026Structural Steel - Welding—special
11/24/2025FinalGEORGE GHEBRYALprogress
11/24/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
11/24/2025MasonryGEORGE GHEBRYALspecial
Latest 25 of 34.
▾Documents — 299 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
08/17/2026M01120847-I1Request digital key ↗
08/17/2026M01120847-P2Request digital key ↗
08/17/2026M01120847-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00229904-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00213799-I1Request digital key ↗
▸Applications & Permits72
▸BISPLAN / WORK APPROVAL APPLICATION38
01/06/2020123745215Open ↗
11/22/2019123745215Open ↗
10/29/2019123745215Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION33
12/12/2018123056780Open ↗
09/06/2018123522964Open ↗
08/03/2018123499712Open ↗
Showing 3 of 33 on file for this type
▸BISINTENT TO REVOKE APPROVAL/PERMIT1
06/11/2019122946223Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE DESIGN CERTIFICATION1
10/23/2015140420033Open ↗
▸Seals & Professional Certifications65
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
01/07/2020123745215Open ↗
10/29/2019123745215Open ↗
09/18/2019123745215Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
09/06/2018123522964Open ↗
07/30/2018123499712Open ↗
04/18/2018123454902Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
09/06/2018123522964Open ↗
08/09/2018123499712Open ↗
04/18/2018123454902Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026M01120847-I1Open ↗
08/17/2026M01120847-S1Open ↗
08/17/2026M01120847-P3Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
05/23/2017140638558Open ↗
09/28/2016140556217Open ↗
08/24/2016140539139Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
05/23/2017140638558Open ↗
09/28/2016140556217Open ↗
08/24/2016140539139Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026M00229904-I1Open ↗
09/01/2026M01120847-S1Open ↗
09/01/2026M01120847-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026M00229904-I1Open ↗
09/01/2026M01120847-S1Open ↗
08/24/2026M00213799-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment26
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE15
11/26/2018122946223Open ↗
11/13/2018123522964Open ↗
09/06/2018123522964Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
08/09/2018123499712Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection16
▸BISTenant Protection Plan and Notes13
01/07/2020123745215Open ↗
09/18/2019123745215Open ↗
09/06/2018123522964Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00213799-I1Open ↗
08/13/2026M00229904-I1Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos15
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
09/18/2019123745215Open ↗
09/06/2018123522964Open ↗
12/29/2016122946269Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M00213799-I1Open ↗
08/13/2026M00229904-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/17/2026M01120847-S1Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
01/07/2020123745215Open ↗
09/18/2019123745215Open ↗
06/11/2019122946223Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
09/28/2016140556217Open ↗
04/05/2016140478855Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/05/2016140478855Open ↗
Showing 1 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/24/2016140539139Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/23/2017140638558Open ↗
09/28/2016140556217Open ↗
08/24/2016140539139Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs13
▸BISLETTERS - SUPPORTING DOCUMENTATION4
09/18/2019123745215Open ↗
11/17/2016122891102Open ↗
10/21/2016140420033Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
12/12/2018123056780Open ↗
01/27/2017140556217Open ↗
08/01/2016122664777Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT18
09/18/2019123745215Open ↗
09/06/2018123522964Open ↗
08/09/2018123499712Open ↗
Showing 3 of 18 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
09/06/2018123522964Open ↗
12/27/2016122946223Open ↗
Showing 2 of 3 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
07/07/2017140638558Open ↗
▸Filing & Intake Forms32
▸BISEFILING COVER SHEET11
09/18/2019123745215Open ↗
09/06/2018123522964Open ↗
07/30/2018123499712Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION11
09/15/2020123745215Open ↗
06/11/2019122946223Open ↗
07/23/2018122946269Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
05/23/2017140638558Open ↗
09/28/2016140556217Open ↗
08/24/2016140539139Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM5
01/06/2020123745215Open ↗
10/29/2019123745215Open ↗
11/13/2018123522964Open ↗
Showing 3 of 5 on file for this type
▸Other Documents9
▸DOB NOWGeotechnical Peer Review Report (BC 1818)4
08/17/2026M01120847-I1Open ↗
08/17/2026M01120847-S1Open ↗
08/13/2026M01120847-P2Open ↗
Showing 3 of 4 on file for this type
▸BISHPD: CONH PILOT1
01/07/2020123745215Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
10/23/2015140420033Open ↗
▸BISSupporting Document: Fee Deferment1
11/17/2016122891102Open ↗
▸DOB NOWDHCR Document1
08/13/2026M00213799-I1Open ↗