← Back
BuildNYC
Walk-up apt, over six families with stores
2100 2ND AVENUE
MANHATTAN · BIN 1052801
💬 Discuss this project
1920Year Built
6Stories
C7Building Class
R9AZoning
24,644 sfGross Floor Area
41Units
Rent Stabilized47 Active Violations 46 unresolved · 1 paperwork only 1 likely answered 1 old, status unconfirmed ▸FISP: No Report Filed
Walk-up apt, over six families with stores · Owner of record: 2100 2nd Ave · 5,000 sf lot · 4.93 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofCentennial Properties NY INC.Under Construction8p · 1 filing · 17 docs
Floor 1Nail SalonUnder Construction10p · 4 filings · 20 docs
CellarCentennial Properties NY INC.Under Construction10p · 2 filings · 17 docs
BasementCentennial Properties NY INC.Under Construction7p · 1 filing · 17 docs
Site & exteriorCentennial Properties NY INC.Under Construction6p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2100 2nd Ave2203/22/2026
Glencord Building1003/21/2026
Centennial Properties NY608/29/2026
East 110th Realty203/21/2026
9300 Realty103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STV106/08/2026
Kieran Patrick Spillane305/13/2026
Jose L. Pena, P.E209/19/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KM Associates of New York203/21/2026
Jca & Associates403/21/2026
K & M Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Joey Electrical CoElectrical103/21/2026
IP YuElectrical103/21/2026
WCK ElectricElectrical103/21/2026
Reliable Electrical ContractorsElectrical103/21/2026
Trincity ElectricElectrical103/22/2026
I.P. ElectricElectrical103/21/2026
C.A.C. IndustriesGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106306/08/2026
Jose L. Pena, P.E5969209/19/2019
Building Lifecycle
All (101)Filed (6)Permit Issued (1)Violation (60)Objection (4)Special Inspection (30)
08/18/2026
Violation issued (HPD, open)
B
08/18/2026
Violation issued (HPD, open)
B
08/18/2026
Violation issued (HPD, open)
B
08/18/2026
Violation issued (HPD, open)
B
08/18/2026
Violation issued (HPD, open)
B
06/18/2026
Permit issued — General Construction
M01120847-S1-GC-CX
06/09/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Masonry
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Preliminary
KIERAN SPILLANE
06/09/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
06/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
06/08/2026
Filed — Alteration
Filing for the removal of the vault.
M01407073-I1
06/02/2026
Violation issued (HPD, open)
A
06/02/2026
Violation issued (HPD, open)
C
06/02/2026
Violation issued (HPD, open)
A
06/02/2026
Violation issued (HPD, open)
A
05/29/2026
Violation issued (HPD, closed)
B
05/29/2026
Violation issued (HPD, open)
B
05/29/2026
Violation issued (HPD, open)
B
05/22/2026
Objection resolved — Addressed
05/21/2026
Objection raised — Scope
05/13/2026
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building underpinning. Repair and strengthen existing foundation walls and columns, with inclusion of mini piles.
M01120847-P3
05/11/2026
Special inspection requirement — Subgrade Inspections
05/11/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
05/11/2026
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
05/11/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
05/11/2026
Special inspection requirement — Post-installed Anchors
05/11/2026
Special inspection requirement — Structural Steel - High Strength Bolting
05/11/2026
Special inspection requirement — Preliminary
05/11/2026
Special inspection requirement — Structural Steel - Welding
04/29/2026
Violation issued (HPD, open)
B
04/29/2026
Violation issued (HPD, open)
C
04/20/2026
Violation issued (ECB, open)
Construction
03/13/2026
Violation issued (HPD, closed)
C
02/06/2026
Violation issued (HPD, closed)
B
02/06/2026
Violation issued (HPD, closed)
B
02/06/2026
Violation issued (HPD, closed)
B
02/06/2026
Violation issued (HPD, closed)
B
01/16/2026
Violation issued (HPD, closed)
B
01/16/2026
Violation issued (HPD, open)
C
11/24/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
11/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
11/24/2025
Special inspection requirement — Masonry
GEORGE GHEBRYAL
11/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
11/24/2025
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
11/24/2025
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
11/17/2025
Violation issued (HPD, closed)
I
10/02/2025
Violation issued (HPD, open)
B
10/02/2025
Violation issued (HPD, open)
B
10/02/2025
Violation issued (HPD, open)
B
09/22/2025
Violation issued (HPD, closed)
B
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedC.A.C. Industries06/18/2026
BISOTISSUEDConstruction Xpert09/06/2018
BISFPISSUEDMetflow Fire Control08/03/2018
BISPLISSUEDTop Dog Plumbing & Heating04/23/2018
BISOTISSUEDMerrick Real Estate GP07/07/2017
BISFPISSUEDActive Fire Control05/12/2017
BISPLISSUEDTop Dog Plumbing & Heating05/01/2017
BISPLISSUEDTop Dog Plumbing & Heating05/01/2017
BISOTISSUEDBSW General Construction01/17/2017
BISOTISSUEDBrick by Brick Contracting12/28/2016
BISOTISSUEDBrick by Brick Contracting12/22/2016
BISPLISSUEDVillage P & H NY10/11/2016
BISOTISSUEDNBS Construction09/29/2016
BISEQISSUEDJ & G GNRL Contracting08/25/2016
BISOTISSUEDC2 Construction07/18/2016
BISOTISSUEDPerfectly Reliable Construction04/14/2016
BISOTISSUEDJCT Development NY04/05/2016
BISOTRE-ISSUEDPerfectly Reliable Construction03/09/2016
BISPLISSUEDOrion Plumbing & Heating02/10/2016
BISOTISSUEDPerfectly Reliable Construction10/26/2015
BISFPISSUEDMaster Fire Systems11/06/2009
BISOTISSUEDCoventry Interiors07/28/2009
BISEQISSUEDCoventry Interiors07/28/2009
BISPLISSUEDArben Contracting03/19/2009
BISEQISSUEDCoventry Interiors03/19/2009
BISMHISSUEDCoventry Interiors03/19/2009
BISPLISSUEDPinnacle Plumbing & Heating10/20/2008
BISBLISSUEDPinnacle Plumbing & Heating10/20/2008
BISFPISSUEDNew York Business Fire System09/04/2007
BISFBISSUEDStephen Braun04/17/2007
BISFPISSUEDMaster Fire Prevention System12/15/1993
1 project · most recent 09/19/2019
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/19/2019——Air Conditioning Systems
Cooling
Senville SENVILLE 18,000 BTU ×3
1 project · most recent 09/17/2019
Water/Sanitary
FiledStatusContractorScope
09/17/2019——Water/Sanitary
1 project · most recent 12/12/2019
FiledStatusContractorScope
12/12/2019CompleteTrincity Electric43 meters, 1 new_meters
2 projects · most recent 06/08/2026
FiledStatusContractorScope
06/08/2026——1 scope_items
05/13/2026Permit IssuedC.A.C. Industries1 scope_items
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
06/09/2026Post-installed AnchorsGEORGE GHEBRYALspecial
06/09/2026MasonryGEORGE GHEBRYALspecial
06/09/2026Structural Steel - DetailsGEORGE GHEBRYALspecial
06/09/2026Footing and FoundationGEORGE GHEBRYALprogress
06/09/2026FinalGEORGE GHEBRYALprogress
06/09/2026PreliminaryKIERAN SPILLANEprogress
06/09/2026Construction Operations Influencing Adjacent StructuresGEORGE GHEBRYALspecial
06/09/2026Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
06/09/2026Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
06/09/2026Subgrade InspectionsGEORGE GHEBRYALspecial
06/09/2026Underpinning and alternate methods of support of buildings and adjacent propertyGEORGE GHEBRYALspecial
06/09/2026Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
06/09/2026Structural Steel - WeldingGEORGE GHEBRYALspecial
06/09/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
05/11/2026Subgrade Inspections—special
05/11/2026Subsurface Conditions – Fill Placement & In-Place Density—special
05/11/2026Underpinning and alternate methods of support of buildings and adjacent property—special
05/11/2026Construction Operations Influencing Adjacent Structures—special
05/11/2026Post-installed Anchors—special
05/11/2026Structural Steel - High Strength Bolting—special
05/11/2026Preliminary—progress
05/11/2026Structural Steel - Welding—special
11/24/2025FinalGEORGE GHEBRYALprogress
11/24/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
11/24/2025MasonryGEORGE GHEBRYALspecial
Latest 25 of 34.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Nail SalonPersonal servicesFloor 1
Project M00229904 Alteration · Approved · 09/19/2019
Project M00213799 Alteration · Approved · 09/17/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 299 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
08/17/2026M01120847-I1Request digital key ↗
08/17/2026M01120847-S1Request digital key ↗
08/17/2026M01120847-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00229904-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00213799-I1Request digital key ↗
▸Applications & Permits72
▸BISPLAN / WORK APPROVAL APPLICATION38
01/06/2020123745215Open ↗
11/22/2019123745215Open ↗
10/29/2019123745215Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION33
12/12/2018123056780Open ↗
09/06/2018123522964Open ↗
08/03/2018123499712Open ↗
Showing 3 of 33 on file for this type
▸BISINTENT TO REVOKE APPROVAL/PERMIT1
06/11/2019122946223Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE DESIGN CERTIFICATION1
10/23/2015140420033Open ↗
▸Seals & Professional Certifications65
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
01/07/2020123745215Open ↗
10/29/2019123745215Open ↗
09/18/2019123745215Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
09/06/2018123522964Open ↗
07/30/2018123499712Open ↗
04/18/2018123454902Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
09/06/2018123522964Open ↗
08/09/2018123499712Open ↗
04/18/2018123454902Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026M01120847-S1Open ↗
08/17/2026M01120847-P3Open ↗
08/17/2026M01120847-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
05/23/2017140638558Open ↗
09/28/2016140556217Open ↗
08/24/2016140539139Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
05/23/2017140638558Open ↗
09/28/2016140556217Open ↗
08/24/2016140539139Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026M00229904-I1Open ↗
09/01/2026M01120847-S1Open ↗
09/01/2026M01120847-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026M00229904-I1Open ↗
09/01/2026M01120847-S1Open ↗
08/24/2026M00213799-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment26
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE15
11/26/2018122946223Open ↗
11/13/2018123522964Open ↗
09/06/2018123522964Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
08/09/2018123499712Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection16
▸BISTenant Protection Plan and Notes13
01/07/2020123745215Open ↗
09/18/2019123745215Open ↗
09/06/2018123522964Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00229904-I1Open ↗
08/13/2026M00213799-I1Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos15
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
09/18/2019123745215Open ↗
09/06/2018123522964Open ↗
12/29/2016122946269Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M00213799-I1Open ↗
08/13/2026M00229904-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/17/2026M01120847-S1Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
01/07/2020123745215Open ↗
09/18/2019123745215Open ↗
06/11/2019122946223Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
09/28/2016140556217Open ↗
04/05/2016140478855Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/05/2016140478855Open ↗
Showing 1 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/24/2016140539139Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/23/2017140638558Open ↗
09/28/2016140556217Open ↗
08/24/2016140539139Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs13
▸BISLETTERS - SUPPORTING DOCUMENTATION4
09/18/2019123745215Open ↗
11/17/2016122891102Open ↗
10/21/2016140420033Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
12/12/2018123056780Open ↗
01/27/2017140556217Open ↗
08/01/2016122664777Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT18
09/18/2019123745215Open ↗
09/06/2018123522964Open ↗
08/09/2018123499712Open ↗
Showing 3 of 18 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
09/06/2018123522964Open ↗
12/27/2016122946223Open ↗
Showing 2 of 3 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
07/07/2017140638558Open ↗
▸Filing & Intake Forms32
▸BISEFILING COVER SHEET11
09/18/2019123745215Open ↗
09/06/2018123522964Open ↗
07/30/2018123499712Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION11
09/15/2020123745215Open ↗
06/11/2019122946223Open ↗
07/23/2018122946269Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
05/23/2017140638558Open ↗
09/28/2016140556217Open ↗
08/24/2016140539139Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM5
01/06/2020123745215Open ↗
10/29/2019123745215Open ↗
11/13/2018123522964Open ↗
Showing 3 of 5 on file for this type
▸Other Documents9
▸DOB NOWGeotechnical Peer Review Report (BC 1818)4
08/17/2026M01120847-I1Open ↗
08/17/2026M01120847-S1Open ↗
08/13/2026M01120847-P2Open ↗
Showing 3 of 4 on file for this type
▸BISHPD: CONH PILOT1
01/07/2020123745215Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
10/23/2015140420033Open ↗
▸BISSupporting Document: Fee Deferment1
11/17/2016122891102Open ↗
▸DOB NOWDHCR Document1
08/13/2026M00213799-I1Open ↗