2102 UNION STREET
BROOKLYN · BIN 3829447
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscape
Roof1p · 1 filing · 2 docs
Floor 779p · 2 filings · 20 docs
Floor 678p · 1 filing · 20 docs
Floor 571p · 1 filing · 20 docs
Floor 469p · 1 filing · 20 docs
Floor 368p · 1 filing · 20 docs
Floor 276p · 1 filing · 20 docs
Floor 182p · 2 filings · 20 docs
Cellar74p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GLOWSTONE GROUP4209/13/2026
OWNERS REP304/09/2026
BLUE SKY BUILDERS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC3403/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE CONSTR NYC LLCGeneral Contractor1307/25/2026
PRECISION HOIST & SCAFFO*General Contractor307/08/2026
A. M. PLUMBING COMPANYPlumbing307/08/2026
PRIME PIPING & HEATING INFire Protection306/28/2026
M.R. ELEC'L SERVICE LLCElectrical103/22/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
RIGID PLBG CONTRACTORS INFire Protection107/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor104/09/2026
MES CONSTRUCTION CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161608/11/2026
Building Lifecycle
All (118)Filed (27)Permit Issued (2)Signed Off (6)Violation (3)Inspection (1)Objection (46)Special Inspection (30)Tax Incentive (3)
12/20/2026
485-x construction completed
08/25/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW CURB CUT AS PER PLANS
B01268421-S8
08/21/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW CURB CUT AS PER PLANS
B01268421-S5
08/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW CURB CUT AS PER PLANS
B01268421-A7
08/11/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW CURB CUT AS PER PLANS
B01268421-S2
08/11/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Air barrier — testing
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHRIAR QUAYYUM
08/10/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW CURB CUT AS PER PLANS
B01268421-A6
08/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/07/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
08/06/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW CURB CUT AS PER PLANS
B01268421-S1
08/04/2026
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01346097-I1
08/04/2026
Signed off — Alteration
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01347632-I1
07/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
07/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
07/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
07/10/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
07/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
07/08/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW CURB CUT AS PER PLANS
B01268421-A4
06/11/2026
Violation issued (ECB, open)
Construction
06/04/2026
Violation issued (ECB, open)
Unknown
05/29/2026
Permit issued — General Construction
B01268421-I1-GC
05/18/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW CURB CUT AS PER PLANS
B01268421-A1
05/18/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
05/14/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW CURB CUT AS PER PLANS
B01268421-P9
05/05/2026
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01347606-P2
05/01/2026
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01346097-P2
04/13/2026
Filed — Alteration
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01347632-P2
04/13/2026
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01347606-P1
03/23/2026
Filed — Alteration
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01347632-P1
03/23/2026
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01346097-P1
03/23/2026
Objection resolved — Addressed
02/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF NEW CURB CUT AS PER PLANS
B01268421-P8
02/20/2026
Objection raised — Admin
02/18/2026
Objection resolved — Addressed
02/18/2026
Objection resolved — Addressed
02/13/2026
Objection raised — Zoning
02/13/2026
Objection raised — Cost
02/11/2026
Violation issued (ECB, closed)
Construction
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC05/29/2026
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC01/28/2026
1 project · most recent 08/11/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/11/2026Permit IssuedINNOVATIVE CONSTR NYC LLCHeating and Air Conditioning Systems
Heat / Cool
Amana PTH153J35 14,400 BTU · Heat Pump Outdoor ×140
PTH093J35 9,000 BTU · Heat Pump Outdoor ×120
PTH073J35 7,000 CFM · Heat Pump Outdoor ×52
PTH123J35 11,600 BTU · Heat Pump Outdoor ×50
Daikin RZA18AAVJU 20,000 BTU · Condensing Unit ×2
Samsung AC0118DXDCG/AA, AM036FCMDCG/AA 20,000 BTU · Condensing Unit ×2
1 project · most recent 08/11/2026
Sprinkler System
FiledStatusContractorScope
08/11/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 08/11/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/11/2026Signed-offA. M. PLUMBING COMPANYGas, Storm, Water/Sanitary
1 project · most recent 08/11/2026
Concrete
FiledStatusContractorScope
08/11/2026Permit IssuedINNOVATIVE CONSTR NYC LLCConcrete
3 projects · most recent 08/11/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
08/11/2026Permit IssuedINNOVATIVE CONSTR NYC LLCFence
05/05/2026Signed-offPRECISION HOIST & SCAFFO*Scaffold
05/01/2026Signed-offPRECISION HOIST & SCAFFO*Sidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 98
DateRequirementInspectorRole
08/11/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
08/11/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
08/11/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
08/11/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
08/11/2026Air barrier — testing SHAHRIAR QUAYYUMenergy_progress
08/11/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
08/11/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
08/11/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
08/11/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
08/11/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
08/11/2026MeteringSHAHRIAR QUAYYUMenergy_progress
08/11/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
08/11/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
08/11/2026Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
08/11/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
08/11/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
08/11/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
08/11/2026Exterior Insulation and Finish Systems (EIFS)SHAHRIAR QUAYYUMspecial
08/11/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
08/07/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
08/07/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
08/07/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
08/07/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
08/07/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
07/10/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
Latest 25 of 98.
▾Documents — 165 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch33
08/18/2026B01347632-I1Request digital key ↗
08/18/2026B01347632-P1Request digital key ↗
08/18/2026B01347632-P2Request digital key ↗
Showing 3 of 33 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
01/02/2026340919803Open ↗
09/12/2025340919803Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
09/12/2025340919803Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram4
08/17/2026B01268421-A7Open ↗
08/17/2026B01268421-A3Open ↗
08/13/2026B01268421-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/17/2026B01268421-A7Open ↗
08/17/2026B01268421-A3Open ↗
08/13/2026B01268421-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01268421-P1Open ↗
08/13/2026B01268421-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 11
08/17/2026B01268421-A7Open ↗
▸Seals & Professional Certifications72
▸DOB NOWDPL-1: Design Professional Seal & Signature33
08/18/2026B01347632-I1Open ↗
08/18/2026B01347632-P1Open ↗
08/18/2026B01347632-P2Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/23/2026B01268421-S2Open ↗
09/23/2026B01268421-S4Open ↗
09/01/2026B01268421-S5Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/23/2026B01268421-S2Open ↗
09/23/2026B01268421-S2Open ↗
09/01/2026B01268421-S5Open ↗
Showing 3 of 16 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/12/2025340919803Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/17/2026B01268421-A7Open ↗
08/17/2026B01268421-A3Open ↗
08/13/2026B01268421-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/17/2026B01268421-I1—
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
12/12/2025340919803Open ↗
09/12/2025340919803Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/12/2025340919803Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01268421-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/20/2026B01268421-A7Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
08/17/2026B01268421-I1Open ↗
08/17/2026B01268421-S9Open ↗
08/17/2026B01268421-S8Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/17/2026B01268421-S2Open ↗
08/17/2026B01268421-S3Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026B01268421-S6Open ↗
08/13/2026B01268421-S7Open ↗
08/13/2026B01268421-P3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B01268421-S6Open ↗
08/13/2026B01268421-S7Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
01/22/2026340919803Open ↗
12/24/2025340919803Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/12/2025340919803Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/12/2025340919803Open ↗
▸Other Documents17
▸DOB NOWSite Survey: Initial4
08/17/2026B01268421-A7Open ↗
08/17/2026B01268421-A3Open ↗
08/13/2026B01268421-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/17/2026B01268421-A7Open ↗
08/17/2026B01268421-A3Open ↗
08/13/2026B01268421-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/17/2026B01268421-A7Open ↗
08/17/2026B01268421-P1Open ↗
08/17/2026B01268421-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
01/22/2026340919803Open ↗
12/12/2025340919803Open ↗
09/12/2025340919803Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01268421-S6Open ↗
▸DOB NOWFinal Survey1
08/20/2026B01268421-I1Open ↗