← Back
BuildNYC
Elevator apt, semi-fireproof without stores
2105 CRUGER AVENUE
BRONX · BIN 2048792
💬 Discuss this project
1939Year Built
6Stories
D1Building Class
R7-1Zoning
46,212 sfGross Floor Area
49Units
LL97 CoveredRent Stabilized96 Active Violations ▸FISP: UNSAFE
Elevator apt, semi-fireproof without stores · Owner of record: Emerald 2105 Cruger · 10,000 sf lot · 4.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSuspended scaffold for facade inspection and repairUnder Construction1p · 1 filing · 3 docs
CellarProposed AlterationUnder Construction2p · 1 filing · 4 docs
Site & exteriorHeavy duty sidewalk shed installationUnder Construction19p · 3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CM 1571 Undercliff Ave107/08/2026
Emerald 2105 Cruger103/22/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Garfinkel Architect105/20/2026
Rigid Structural Design108/21/2025
Aaxd105/01/2025
Arquitectura Varela102/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Apex Group NYScaffold508/12/2026
Canido Basonas Construction ServiceScaffold303/21/2026
Canido Basonas Construction ServiceGeneral Contractor204/09/2026
A.R.P. Electrical Cont'gElectrical103/21/2026
G.B. & SonPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Shahrish Shuvo Engineering8524105/20/2026
IP Concrete Testing and I6252105/01/2025
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 10, sub-cycle B)
The filing window opened 02/21/2026. 1 Cycle 10 filing on record, latest 02/21/2025, status Unsafe
11/09/2026
Permit expired, never signed off — Sidewalk Shed
The city's record still shows this permit as issued, with no sign-off on its filing
X01183900-I1-SH
08/31/2026
Boiler inspection report filed
Initial · no defects · Accepted
08/26/2026
Elevator Category 1 inspection report filed
08/21/2026
Permit expired, never signed off — Supported Scaffold
The city's record still shows this permit as issued, with no sign-off on its filing
X01268490-I1-SF
224 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedApex Group NY08/11/2026
DOB NOWPlumbingPermit IssuedG.B. & Son06/08/2026
DOB NOWSidewalk ShedPermit IssuedApex Group NY05/15/2026
DOB NOWSidewalk ShedPermit IssuedApex Group NY02/17/2026
DOB NOWSuspended ScaffoldPermit IssuedCanido Basonas Construction02/12/2026
DOB NOWSidewalk ShedPermit IssuedApex Group NY01/27/2026
DOB NOWGeneral ConstructionPermit IssuedCanido Basonas Construction Service11/17/2025
DOB NOWSupported ScaffoldPermit IssuedCanido Basonas Construction Service08/21/2025
DOB NOWSuspended ScaffoldPermit IssuedCanido Basonas Construction08/21/2025
DOB NOWGeneral ConstructionPermit IssuedCanido Basonas Construction Service08/07/2025
DOB NOWSidewalk ShedPermit IssuedApex Group NY02/21/2025
BISOTISSUEDSajid Construction05/28/2009
BISOTISSUEDSajid Construction11/17/2008
BISEQISSUEDSpring Scafolding11/16/1998
BISEQISSUEDSpring Scafolding06/26/1998
1 project · most recent 05/20/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
05/20/2026Permit IssuedG.B. & SonGas, Plumbing-Sprinkler, Water/Sanitary
1 project · most recent 02/21/2025
FiledStatusContractorScope
02/21/2025Permit IssuedRichard Neu—
2 projects · most recent 08/21/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/21/2025Permit IssuedCanido Basonas Construction ServiceScaffold
02/21/2025Permit IssuedApex Group NYSidewalk Shed
1 project · most recent 08/20/2025
Suspended Scaffold
FiledStatusContractorScope
08/20/2025Permit IssuedCanido Basonas ConstructionSuspended Scaffold
1 project · most recent 08/20/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
08/20/2025Permit IssuedCanido Basonas ConstructionSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
05/13/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
05/13/2026Sprinkler SystemsShahrish Shuvospecial
05/13/2026Tenant Protection Plan ComplianceShahrish Shuvospecial
05/13/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
04/24/2025Tenant Protection Plan ComplianceINDARDEO PARBHUNATHspecial
04/24/2025FinalDAMIR RAHMANprogress
04/24/2025MasonryINDARDEO PARBHUNATHspecial
34 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account