← Back
Four families
2106 77 STREET
BROOKLYN · BIN 3161629
💬 Discuss this project
1924Year Built
2Stories
C3Building Class
R5Zoning
3,680 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Four families · Owner of record: 2106 Z & W LLC · 2,800 sf lot · 1.31 FAR built · Flood zone X
Locations of Work
ElectricalPlumbingCivil
Floor 22p · 2 filings · 20 docs
Floor 11p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2106 Z & W LLC1707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/22/2023$1.8M—Private party → 2106 Z & W LLC$476/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC CONSULTING ENGINEERS401/26/2024
JIAN ENGINEERING PLLC109/29/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRK CREATIVE1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GENESIS NYC CONSTRUCTIONGeneral Contractor603/21/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC CONSULTING ENGINEERS,4083401/26/2024
JIAN ENGINEERING PLLC7397109/29/2023
Building Lifecycle
All (53)Filed (5)Permit Issued (3)Signed Off (3)Violation (17)Inspection (4)Special Inspection (21)
06/06/2025
Violation issued (HPD, closed)
A
11/26/2024
Violation issued (HPD, closed)
I
04/08/2024
Violation issued (HPD, closed)
A
03/11/2024
Signed off — Alteration
FILE STRUCTURAL APPLICATION IN CONJUNCTION WITH JOB B00933348-I1,NO CHANGE OF USE,EGRESS OR OCCUPANCY
B00938413-I1
03/07/2024
Signed off — Alteration
FILING THIS APPLICATION FOR EXISTING 4 FAMILY DWELLING UNITS,ON CELLAR,1ST FL,2ND FL, TO INSTALL NEW PLUMING FIXTURES AS PER PLAN,GENERAL CONSTRUCTION WILL FILED ON SEPARATE APPLICATION.NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00933418-I1
03/04/2024
Signed off — Alteration
INTERIOR RENOVATION FOR EXISTING 4 FAMILY DWELLING UNITS,ON CELLAR,1ST FL,2ND FL,NEW PARTITION WALL AS PER PLAN.PLUMBING WORK WILL BE FILING SEPARATE APPLICATION ,STRUCTURAL PLAN WILL BE FILED SEPARATE APPLICATION. NO CHANGE IN USE ,EGRESS OR OCCUPANCY
B00933348-I1
02/23/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/20/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
JAN PEREZ
01/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
JAN PEREZ
01/29/2024
Special inspection requirement — Lighting in dwelling units
JAN PEREZ
01/29/2024
Special inspection requirement — Energy Code Compliance Inspections
JAN PEREZ
01/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAN PEREZ
01/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAN PEREZ
01/29/2024
Special inspection requirement — Energy Code Compliance Inspections
JAN PEREZ
01/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JAN PEREZ
01/26/2024
Filed — Alteration
FILING THIS APPLICATION FOR EXISTING 4 FAMILY DWELLING UNITS,ON CELLAR,1ST FL,2ND FL, TO INSTALL NEW PLUMING FIXTURES AS PER PLAN,GENERAL CONSTRUCTION WILL FILED ON SEPARATE APPLICATION.NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00933418-P1
01/26/2024
Filed — Alteration
INTERIOR RENOVATION FOR EXISTING 4 FAMILY DWELLING UNITS,ON CELLAR,1ST FL,2ND FL,NEW PARTITION WALL AS PER PLAN.PLUMBING WORK WILL BE FILING SEPARATE APPLICATION ,STRUCTURAL PLAN WILL BE FILED SEPARATE APPLICATION. NO CHANGE IN USE ,EGRESS OR OCCUPANCY
B00933348-P1
01/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAN PEREZ
01/24/2024
Special inspection requirement — Energy Code Compliance Inspections
JAN PEREZ
01/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
JAN PEREZ
01/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JAN PEREZ
01/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
JAN PEREZ
01/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAN PEREZ
01/24/2024
Special inspection requirement — Energy Code Compliance Inspections
JAN PEREZ
01/24/2024
Special inspection requirement — Lighting in dwelling units
JAN PEREZ
01/04/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/04/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/04/2023
Permit issued — Structural
B00938413-I1-ST
09/29/2023
Filed — Alteration
FILE STRUCTURAL APPLICATION IN CONJUNCTION WITH JOB B00933348-I1,NO CHANGE OF USE,EGRESS OR OCCUPANCY
B00938413-I1
09/28/2023
Permit issued — Plumbing
B00933418-I1-PL
09/27/2023
Special inspection requirement — Structural Steel - Details
JIAN DENG
09/27/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
09/27/2023
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
09/27/2023
Special inspection requirement — Structural Steel - High Strength Bolting
JIAN DENG
09/26/2023
Permit issued — General Construction
B00933348-I1-GC
09/22/2023
Special inspection requirement — Final
JIAN DENG
09/21/2023
Filed — Alteration
FILING THIS APPLICATION FOR EXISTING 4 FAMILY DWELLING UNITS,ON CELLAR,1ST FL,2ND FL, TO INSTALL NEW PLUMING FIXTURES AS PER PLAN,GENERAL CONSTRUCTION WILL FILED ON SEPARATE APPLICATION.NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00933418-I1
09/21/2023
Filed — Alteration
INTERIOR RENOVATION FOR EXISTING 4 FAMILY DWELLING UNITS,ON CELLAR,1ST FL,2ND FL,NEW PARTITION WALL AS PER PLAN.PLUMBING WORK WILL BE FILING SEPARATE APPLICATION ,STRUCTURAL PLAN WILL BE FILED SEPARATE APPLICATION. NO CHANGE IN USE ,EGRESS OR OCCUPANCY
B00933348-I1
04/06/2021
Violation issued (HPD, closed)
A
07/25/2020
Violation issued (HPD, closed)
C
07/25/2020
Violation issued (HPD, closed)
A
07/25/2020
Violation issued (HPD, closed)
A
07/25/2020
Violation issued (HPD, closed)
A
07/25/2020
Violation issued (HPD, closed)
C
07/25/2020
Violation issued (HPD, closed)
A
07/25/2020
Violation issued (HPD, closed)
B
07/25/2020
Violation issued (HPD, closed)
B
07/25/2020
Violation issued (HPD, closed)
A
07/25/2020
Violation issued (HPD, closed)
B
07/25/2020
Violation issued (HPD, closed)
A
06/23/2020
Violation issued (ECB, closed)
Construction
08/18/1986
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offGENESIS NYC CONSTRUCTION10/04/2023
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC09/28/2023
DOB NOWGeneral ConstructionSigned-offGENESIS NYC CONSTRUCTION09/26/2023
1 project · most recent 10/03/2023
General Wiring
FiledStatusContractorScope
10/03/2023CompleteJ Y ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/23/2024Pass-Final General Construction Non-Directive 14PassView ↗
02/20/2024Fail-Final General Construction Non-Directive 14FailView ↗
01/04/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/04/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
01/29/2024HVAC-R and service water heating equipmentJAN PEREZenergy_progress
01/29/2024HVAC-R and service water heating system controlsJAN PEREZenergy_progress
01/29/2024Lighting in dwelling unitsJAN PEREZenergy_progress
01/29/2024Energy Code Compliance InspectionsJAN PEREZprogress
01/29/2024Fire-Resistant Penetrations and JointsJAN PEREZspecial
01/29/2024Fire-Resistant Penetrations and JointsJAN PEREZspecial
01/29/2024Energy Code Compliance InspectionsJAN PEREZprogress
01/29/2024HVAC-R and service water piping design and insulationJAN PEREZenergy_progress
01/24/2024Fire-Resistant Penetrations and JointsJAN PEREZspecial
01/24/2024Energy Code Compliance InspectionsJAN PEREZprogress
01/24/2024HVAC-R and service water heating equipmentJAN PEREZenergy_progress
01/24/2024HVAC-R and service water piping design and insulationJAN PEREZenergy_progress
01/24/2024HVAC-R and service water heating system controlsJAN PEREZenergy_progress
01/24/2024Fire-Resistant Penetrations and JointsJAN PEREZspecial
01/24/2024Energy Code Compliance InspectionsJAN PEREZprogress
01/24/2024Lighting in dwelling unitsJAN PEREZenergy_progress
09/27/2023Structural Steel - DetailsJIAN DENGspecial
09/27/2023Structural Stability – Alterations of existing buildingsJIAN DENGspecial
09/27/2023Energy Code Compliance InspectionsJIAN DENGprogress
09/27/2023Structural Steel - High Strength BoltingJIAN DENGspecial
09/22/2023FinalJIAN DENGprogress
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026B00933418-P1Request digital key ↗
08/26/2026B00933418-I1Request digital key ↗
08/26/2026B00938413-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026B00938413-I1Open ↗
09/02/2026B00938413-I1Open ↗
09/01/2026B00933418-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026B00938413-I1Open ↗
09/02/2026B00938413-I1Open ↗
09/02/2026B00938413-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026B00933418-I1Open ↗
08/26/2026B00933418-P1Open ↗
08/26/2026B00933348-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026B00933418-I1Open ↗
08/26/2026B00933418-P1Open ↗
08/26/2026B00933348-P1Open ↗
Showing 3 of 5 on file for this type