HPD04/30/2026(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
HPD11/17/2025§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
HPD06/05/2025(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
ECB09/25/2024FAILURE TO COMPLY WITH COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #39105860Y, FILE A CERTIFICATE OF CORRECTION$1K due
ECB02/12/2024WORK WITHOUT A PERMIT. ATOI OBSERVED OUTDOOR METAL STRUCTURE WITH ROOF ATTACHED TO BUILDING FACADE WITH L- BRACKETS AND SCREW'S AT EXP 3/ REAR YARD. STRUCTURE APPROXIMATELY 20' X 12' X 8' ALL WORK COMPLETED ATO$6K due
ECB02/15/2022FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35577208M ISSUED ON 6/6/2021 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REMEDY:COMPLY WITH COMMI$10K due
DOB01/19/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB12/22/2021W/O A PERMIT. NOTED: AT REAR YARD - METAL STRUCTURE/STORAGE ERECTED APPRX 20' X 12' X 10' WITH METAL POSTS, METAL ROOF & ATTACHED TO BUILDING.
ECB10/22/2021OCCUPANCY CONTRARY TO THAT ALLOWED BT C/O OR DOB RECORDS.ATOI NOTED 1FL ARRANGED AS&OCCUPIED AS BAITUL ISLAM MASJID/COMMUNITY CENTER.I CARD REG#216105 STATES BLDG TO BE OCCUPIED AS 3CLASSA DWELLINGS NO OCCUPIED$25K due
DOB09/01/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB06/04/2021OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERT OF OCCUPANCY OR BLDG DEPT RECORDS. NOTE: DURING INSPECTION OBSERVE FROM EXP#4/RIGHT YARD. THE1ST FL IS CONVERTED & OCCUPIED ENTIRELY AS A MOSQUE. REMEDY: DISCONTIN$25K due
DOB09/02/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/02/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB02/05/2020W/O A PERMIT. NOTED: AT 1ST FLOOR - PARTITION WALLS, PLUMBING & ELECTRICAL REMOVED TO CHANGE LAYOUT OF FLOOR CREATING A PLACE OF ASSENBLY. WATER & WASTE LINES INSTALLED FOR ADDL'T 2 PC BTHRM & SHOWER., OBTAIN P$12K due
DOB02/05/2020W/O A PERMIT. NOTED: AT REAR YARD (EXPOSURE 4); GARAGE DOOR REMOVED & REPLACED WITH CMU WALL, DOOR & WINDOW. ALSO, A METAL STRUCTURE APPRX. 20' X 12' X 8' ERECTED WITH METAL POSTS & ELECTRICAL WIRING FOR LIGHTS.
ECB02/05/2020CONTRARY TO DOB/OFFICIAL RECORDS - 1ST FLOOR HAS BEEN CONVERTED & OCCUPIED ENTIRELY AS A MOSQUE., DISCONTINUE ILLEGAL OCCUPANCY OR AMEND C OF O$12K due
ECB11/28/2018WORK W/O A PERMIT, NOTED: AT 1ST FLOOR REAR REMOVED GARAGE DOORS AND REPLACE WITH MASONRY WALL WINDOWS WITH BAR AND ACCESS DOOR. RMDY: OBTAIN PERMIT.$6K due
ECB08/14/2018WORK WITHOUT A PERMIT.WORK NOTED AT REAR YARD OBSERVED METAL STRUCTURE/STORAGE.APPROXIMATELY 20'LONG X 12' X 8' H 100% OF WORK COMPLETED WITOUT PERMIT.REM:OBTAIN ALL PERMITS.$6K due
ECB06/07/2018WORK WITHOUT A PERMIT.NOTED:SHED ERECTED IN REAR YARD OF METAL/ALUMINUM COVERING WITH WOOD FRAME JOISTS POSTS,SHED MEASHING APPROXIMATELY 25FEET LENGTH 8X18 FEET WIDTH TO 1ST STORY CEILING LEVEL(APPROX 10 FT)WO$6K due
DOB05/03/2017FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/03/2017FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB10/30/2017FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIO # 35173300P ISSUED ON 01/30/17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O A PERMIT. REMOVAL OF PARTITION, VERTICAL,Nothing owed — awaiting certificate of correction
ECB09/06/2017FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIO # 35143300P ISSUED ON 01/30/17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O PERMIT. NOTED: CUTTED 1ST FL REMOVAL OF PNothing owed — awaiting certificate of correction
ECB07/27/2017FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35143300P ISSUED ON 1-30-17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF C.Nothing owed — awaiting certificate of correction
ECB05/19/2017FAILURE TO COMPLY WITH COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35143300P ISSUED ON 01/30/17 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102.01.GUT RENO.REM:COMPLY WITH COMMNothing owed — awaiting certificate of correction
ECB03/31/2017FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35173300P ISSUED ON 1-30-17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. NO PEERMIT ON FILE FOR GUT RENOVATION. REMEDY: COMPLY W/COMM'S ONothing owed — awaiting certificate of correction
ECB01/30/2017WORK W/O A PERMIT. WORK NOTED: GUTTED 1ST STY,REMOVEAL OF PARTIONS,ELECTRICAL & PLUMBING. CONSTRUCTED PARTITION W/DOOR OPENING SUB-DIVIDING 2ND STY & GUTTEN FRONT OF 2ND STY. REMEDY: OBTAIN PERMIT.Nothing owed — awaiting certificate of correction
ECB01/30/2017OCCUPANCY CONTRARY TO THAT ALLOWED BY BLDG DEPT RECORDS. LEGAL USE-DWELLING. CURRENT USE-ENTIRE 1ST STY CONVERTED TO MOSQUE & 2ND STY HAS BEEN SUB-DIVIDED & FRONT OF 2ND STY CONVERTED TO MOSQUE(NOTE REFUSED ACCNothing owed — awaiting certificate of correction
ECB01/24/2017FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35213531X ISSUED ON 11-29-17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 01. WORK W/O PERMIT. REMEDY: COMPLY W/COMM'S ORDER AND/OR FILE A C OF CNothing owed — awaiting certificate of correction
ECB11/29/2016WORK W/O A PERMIT. NOTED: AT REAR YARD OF PREMISES INSTALLED AN AWNING CONVERING ENTIRE REAR YARD. METAL AWNING ERECTED COVERING ENTIRE YARD APPROX DIMENSIONS ARE 20FT X 25FT X 1 STY HIGH. AWNING IS LOCATED ONNothing owed — awaiting certificate of correction