Two family frame
211-09 45 DRIVE
QUEENS · BIN 4623552
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3AZoning
1,954 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · Owner of record: ABSSV GROUP INC. · 2,760 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DHC CONTRACTING203/22/2026
ABSSV GROUP203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALPHA HOME DESIGN LLC204/16/2024
FANG ARCHITECT308/09/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DHC CONTRACTING INCGeneral Contractor603/21/2026
TRI STATE PLBG & HTG INCPlumbing307/08/2026
360 PRESTIGE CONTRACTINGGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513204/16/2024
TRIANGLE INSPECTION & TES7495204/16/2024
Building Lifecycle
All (45)Filed (5)Permit Issued (7)Signed Off (3)Violation (4)Inspection (6)Special Inspection (20)
01/21/2025
Signed off — Alteration
NEW INSTALLATION OF PLUMBING WORK IN CONJUNCTION WITH NB JOB #440666389.
Q00505575-I1
01/21/2025
Signed off — Alteration
Q00568196-I1
07/24/2024
Signed off — Alteration
INSTALL 10' LONG NEW CURB CUT FOR A 2-STORY 2-FAMILY BUILDING. FILED IN CONJUNCTION WITH NB JOB #440666389.
Q00567354-I1
07/23/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/17/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
07/16/2024
Permit issued — Curb Cut
Q00567354-I1-CC
04/17/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
04/17/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DEZHANG FANG
04/17/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
04/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
04/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
04/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
04/17/2024
Special inspection requirement — Maintenance information
DEZHANG FANG
04/16/2024
Filed — Alteration
NEW INSTALLATION OF PLUMBING WORK IN CONJUNCTION WITH NB JOB #440666389.
Q00505575-P3
04/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
04/15/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DEZHANG FANG
04/15/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
04/15/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
04/15/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DEZHANG FANG
04/15/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
04/15/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
04/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
04/15/2024
Special inspection requirement — Maintenance information
DEZHANG FANG
04/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
11/28/2023
Permit issued — Plumbing
Q00505575-I1-PL
05/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/11/2023
Permit issued — Construction Fence
Q00568196-I1-FN
05/01/2023
Violation issued (ECB, closed)
Construction
03/02/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/01/2022
Permit issued — Construction Fence
Q00568196-I1-FN
08/31/2022
Violation issued (ECB, closed)
Construction
07/20/2022
Permit issued — Plumbing
Q00505575-I1-PL
01/27/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/27/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/04/2022
Permit issued — Plumbing
Q00505575-I1-PL
08/12/2021
Permit issued — Construction Fence
Q00568196-I1-FN
08/09/2021
Filed — Alteration
NEW INSTALLATION OF PLUMBING WORK IN CONJUNCTION WITH NB JOB #440666389.
Q00505575-P1
08/02/2021
Filed — Alteration
INSTALL 10' LONG NEW CURB CUT FOR A 2-STORY 2-FAMILY BUILDING. FILED IN CONJUNCTION WITH NB JOB #440666389.
Q00567354-I1
07/30/2021
Filed — Alteration
Q00568196-I1
06/24/2021
Filed — Alteration
NEW INSTALLATION OF PLUMBING WORK IN CONJUNCTION WITH NB JOB #440666389.
Q00505575-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-off360 PRESTIGE CONTRACTING07/16/2024
DOB NOWPlumbingSigned-offDW PLUMBING INC11/28/2023
DOB NOWConstruction FenceSigned-off360 PRESTIGE CONTRACTING05/11/2023
DOB NOWConstruction FenceSigned-offALEXANDER CHAN09/01/2022
DOB NOWPlumbingSigned-offDW PLUMBING INC07/20/2022
DOB NOWPlumbingSigned-offDW PLUMBING INC01/04/2022
DOB NOWConstruction FenceSigned-offALEXANDER CHAN08/12/2021
BIS—ISSUED360 PRESTIGE CONTRACTING05/02/2024
BIS—ISSUED360 PRESTIGE CONTRACTING05/19/2023
BIS—ISSUEDDHC CONTRACTING INC11/17/2022
BIS—ISSUEDDHC CONTRACTING INC08/01/2022
BIS—ISSUEDDHC CONTRACTING INC09/10/2021
BIS—ISSUEDDHC CONTRACTING INC09/08/2021
2 projects · most recent 05/31/2024
General Wiring
FiledStatusContractorScope
05/31/2024CompleteE D ELECTRICAL INCGeneral Wiring
02/22/2024CancelledCOMBINED ELECL CONTNG INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/23/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
07/17/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
03/02/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/27/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
04/17/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
04/17/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDEZHANG FANGspecial
04/17/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
04/17/2024Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
04/17/2024HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
04/17/2024HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
04/17/2024HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
04/17/2024Maintenance informationDEZHANG FANGenergy_progress
04/15/2024Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
04/15/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDEZHANG FANGspecial
04/15/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
04/15/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
04/15/2024Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
04/15/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDEZHANG FANGspecial
04/15/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
04/15/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
04/15/2024HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
04/15/2024HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
04/15/2024Maintenance informationDEZHANG FANGenergy_progress
04/15/2024HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026Q00568196-I1Request digital key ↗
08/27/2026Q00567354-I1Request digital key ↗
08/27/2026Q00505575-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION8
08/09/2024440666389Open ↗
08/08/2024440666389Open ↗
07/24/2024440666389Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION4
08/17/2023440666389Open ↗
09/17/2021440666389Open ↗
09/17/2021440666389Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/13/2024440666389Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
03/23/2021440666389Open ↗
▸BISVERIFY TAX LOT1
01/23/2025440666389Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/23/2025440666389Open ↗
▸BISZONING DIAGRAM1
09/02/2021440666389Open ↗
▸Seals & Professional Certifications15
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q00505575-I1Open ↗
09/01/2026Q00505575-I1Open ↗
09/01/2026Q00505575-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00568196-I1Open ↗
08/27/2026Q00567354-I1Open ↗
08/27/2026Q00505575-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026Q00505575-P3Open ↗
09/01/2026Q00505575-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/23/2021440666389Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/17/2021440666389Open ↗
▸Trade Schedules & Equipment3
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
07/29/2021440666389Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
07/29/2021440666389Open ↗
▸BISHEATING SYSTEMS1
01/23/2025440666389Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREES SITE PLAN1
01/23/2025440666389Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
01/23/2025440666389Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
09/17/2021440666389Open ↗
▸BISSTREET TREE CHECKLIST1
03/23/2021440666389Open ↗
▸BISSTREET TREE SIGNOFF1
08/06/2025440666389Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/03/2021440666389Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/23/2025440666389Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/17/2021440666389Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00505575-I1Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/02/2021440666389Open ↗
08/03/2021440666389Open ↗
08/03/2021440666389Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSOIL REPORT3
08/13/2026Q00505575-I1Open ↗
08/13/2026Q00505575-P3Open ↗
08/13/2026Q00505575-P1Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
06/07/2022440666389Open ↗
09/17/2021440666389Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
01/23/2025440666389Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
01/23/2025440666389Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/23/2025440666389Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/23/2025440666389Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/23/2025440666389Open ↗
▸BISMASONRY1
01/23/2025440666389Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
01/23/2025440666389Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
01/23/2025440666389Open ↗
▸BISSOIL REPORT1
03/23/2021440666389Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
09/17/2021440666389Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/03/2021440666389Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00505575-I1Open ↗
▸Approvals, Objections & Sign-offs10
▸BISSCHEDULE A - OCCUPANCY / USE6
08/09/2024440666389Open ↗
08/08/2024440666389Open ↗
08/26/2021440666389Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/29/2021440666389Open ↗
07/29/2021440666389Open ↗
07/29/2021440666389Open ↗
▸BISSUPERSEDING LETTER1
08/17/2023440666389Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
08/12/2024440666389Open ↗
08/03/2021440666389Open ↗
▸BISBOROUGH INTAKE FORM1
09/17/2021440666389Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/23/2021440666389Open ↗
▸Other Documents4
▸BISSUSTAINABLE ROOF ZONE FORM1
09/02/2021440666389Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
01/23/2025440666389Open ↗
▸BISPLOT DIAGRAM1
07/29/2021440666389Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
01/23/2025440666389Open ↗