← Back
BuildNYC
Two family converted from one family
211-17 HOLLIS AVENUE
QUEENS · Queens Village · BIN 4233768
💬 Discuss this project
1920Year Built
2.75Stories
B3Building Class
R2Zoning
1,982 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family converted from one family · 3,885 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic3p · 4 filings · 20 docs
Floor 23p · 4 filings · 20 docs
Floor 13p · 4 filings · 20 docs
Cellar5p · 4 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Askon Architects610/13/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mamc Consulting RepsGeneral Contractor209/29/2026
Wreck It NYC 11General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Askon Architect3596510/13/2026
Building Lifecycle
10/13/2026
Filed — Alteration
One time Temporary Seasonal use of house and exterior structure between the dates of 9/25/2026 and 11/02/2026.
Q01461823-P2
10/09/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Akeeb Shekoni
10/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
10/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
Akeeb Shekoni
38 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMamc Consulting Reps09/28/2026
DOB NOWGeneral ConstructionSigned-offMamc Consulting Reps10/06/2025
DOB NOWGeneral ConstructionSigned-offWreck It NYC 1110/24/2024
1 project · most recent 10/01/2026
General Wiring
FiledStatusContractorScope
10/01/2026CompleteCole ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/09/2026Fail-Final General Construction Non-Directive 14FailView ↗
10/18/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/17/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
10/09/2026Structural Stability – Alterations of existing buildingsAkeeb Shekonispecial
10/09/2026Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
10/09/2026Fire-Resistance Rated ConstructionAkeeb Shekoniprogress
10/05/2026Structural Stability – Alterations of existing buildingsAkeeb Shekonispecial
10/05/2026Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
10/05/2026Fire-Resistance Rated ConstructionAkeeb Shekoniprogress
10/02/2025Fire-Resistance Rated ConstructionAkeeb Shekoniprogress
10/02/2025Structural Stability – Alterations of existing buildingsAkeeb Shekonispecial
10/01/2025Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
10/16/2024Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
10/16/2024Fire-Resistance Rated ConstructionAkeeb Shekoniprogress
10/16/2024FinalHANSA PERSAUDprogress
10/16/2024Structural Stability – Alterations of existing buildingsAkeeb Shekonispecial
20 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account