← Back
BuildNYC
Two stories - detached, small or mid-size
211-19 RICHLAND AVENUE
QUEENS · BIN 4163988
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R2AZoning
1,100 sfGross Floor Area
1Units
1 Active Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 5,040 sf lot · 0.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
AtticUnder Construction7p · 1 filing · 20 docs
Floor 2Under Construction8p · 1 filing · 20 docs
Floor 1Temporary construction fenceUnder Construction9p · 2 filings · 20 docs
CellarFoundation underpinning for building alterationUnder Construction21p · 2 filings · 20 docs
Site & exteriorFoundation underpinning for building alterationUnder Construction18p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Haym S. Gross, Architect503/17/2026
Sal V. Tartaglione Architect105/01/2025
Urban Associates111/25/2024
Anthony Tsirantonakis112/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Carner Associates1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EJ Homes 45General Contractor509/22/2026
Fresh Meadows HomeGeneral Contractor104/09/2026
EJ Homes 45Scaffold109/23/2026
Fresh Meadows HomeScaffold104/09/2026
Fresh Meadows Homespecialty_contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rike Tech Associates2965605/15/2025
AA Building & Inspection1519211/25/2024
Building Lifecycle
09/22/2026
Permit renewed — Construction Fence
Renewed with changes
Q01351463-I1-FN
09/21/2026
Permit issued — Earth Work
Q00937533-I1-FO-EA
09/18/2026
At inspection of a 2-story building, no active construction work was observed; however, a construction fence was in place. Department records…
ECB violation · closed
09/18/2026
At inspection of a 2-story building, no active construction work was observed; however, debris and combustible materials, including two propane…
ECB violation · open
09/15/2026
Permit issued — Foundation
Q00937533-S2-FO
64 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedEJ Homes 4509/22/2026
DOB NOWEarth WorkPermit IssuedEJ Homes 4509/21/2026
DOB NOWFoundationPermit IssuedEJ Homes 4509/15/2026
DOB NOWSupport of ExcavationPermit IssuedEJ Homes 4509/10/2026
DOB NOWMechanical SystemsPermit IssuedEJ Homes 4507/31/2026
DOB NOWGeneral ConstructionPermit IssuedEJ Homes 4507/27/2026
DOB NOWFoundationPermit IssuedFresh Meadows Home04/03/2026
DOB NOWConstruction FencePermit IssuedFresh Meadows Home03/18/2026
DOB NOWMechanical SystemsPermit IssuedFresh Meadows Home03/16/2026
1 project · most recent 05/15/2025
Heating and Air Conditioning Systems
FiledStatusContractorScope
05/15/2025Permit IssuedEJ Homes 45Heating and Air Conditioning Systems
1 project · most recent 05/15/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/15/2025——Gas, Storm, Water/Sanitary
1 project · most recent 12/22/2025
General Wiring
FiledStatusContractorScope
12/22/2025Permit IssuedG. G. ElectricGeneral Wiring
2 projects · most recent 05/15/2025
Wood
FiledStatusContractorScope
05/15/2025Permit IssuedEJ Homes 45Wood
11/25/2024Permit IssuedEJ Homes 45—
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
08/02/2025HVAC-R and service water heating system controlsSal Tartaglioneenergy_progress
08/02/2025Fire-Resistant Penetrations and JointsSYED RIZVIspecial
08/02/2025Maintenance informationSal Tartaglioneenergy_progress
08/02/2025HVAC-R and service water heating equipmentSal Tartaglioneenergy_progress
08/02/2025HVAC-R and service water piping design and insulationSal Tartaglioneenergy_progress
07/01/2025Permanent certificateSal Tartaglioneenergy_progress
05/15/2025HVAC-R and service water heating equipmentSal Tartaglioneenergy_progress
05/15/2025HVAC-R and service water piping design and insulationSal Tartaglioneenergy_progress
05/15/2025HVAC-R and service water heating system controlsSal Tartaglioneenergy_progress
05/15/2025Ventilation and air distribution systemSal Tartaglioneenergy_progress
05/15/2025Maintenance informationSal Tartaglioneenergy_progress
05/08/2025Mechanical SystemsSYED RIZVIspecial
05/08/2025FinalSal Tartaglioneprogress
04/24/2025Energy Code Compliance InspectionsSal Tartaglioneprogress
02/04/2025MeteringSYED RIZVIenergy_progress
01/27/2025FireplacesSYED RIZVIenergy_progress
11/26/2024Concrete - Cast-In-PlaceSYED RIZVIspecial
11/26/2024Post-installed AnchorsSYED RIZVIspecial
11/26/2024Footing and FoundationSYED RIZVIprogress
11/26/2024Structural Stability – Alterations of existing buildingsSYED RIZVIspecial
11/26/2024Subsurface Conditions – Fill Placement & In-Place Density—special
11/26/2024Subgrade InspectionsSYED RIZVIspecial
11/26/2024FinalHAYM GROSSprogress
11/25/2024Excavations - Sheeting, Shoring, and BracingSYED RIZVIspecial
11/25/2024Concrete - Cast-In-Place—special
Latest 25 of 62.
82 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account