← Back
BuildNYC
Single or multiple dwelling with stores or offices
211 7TH AVENUE
BROOKLYN · Park Slope · BIN 3025406
💬 Discuss this project
1920Year Built
4Stories
S9Building Class
R6AZoning
9,524 sfGross Floor Area
9Units
Rent Stabilized3 Active Violations 8 likely answered 2 old, status unconfirmed ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: Seventh on Third Realty · 3,150 sf lot · 3.02 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Amaro Spirits & Wine, Avian Cocktail Group6p · 2 filings · 16 docs
CellarAvian Cocktail Group3p · 1 filing · 14 docs
Site & exteriorAmaro Spirits & Wine, Avian Cocktail Group2p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Avian Cocktail Group807/08/2026
7th on Third Realty803/22/2026
209 7th Avenue Realty603/21/2026
Yogurtland303/21/2026
209 Seventh Ave Realty103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Papa K302/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Xpedite203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C & A Clare RenovationsGeneral Contractor307/08/2026
Stat ElectricElectrical203/21/2026
A P Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Christopher V. Papa Architects1663302/04/2025
Building Lifecycle
All (75)Filed (3)Permit Issued (3)Signed Off (1)Violation (58)Inspection (2)Special Inspection (8)
02/17/2026
Violation issued (FDNY_NOV, closed)
09/03/2025
Violation issued (FDNY_NOV, closed)
03/12/2025
Signed off — Alteration
INSTALLATION OF NEW ELECTRIC MINI-SPLIT HEATING AND AIR CONDITIONING SYSTEM FOR EXISTING RETAIL STORE. NO CHANGE IN USE, OCCUPANCY, EGRESS, OR FLOOR AREA.
B01175694-I1
02/27/2025
Permit issued — Mechanical Systems
B01175694-I1-MS
02/04/2025
Filed — Alteration
INSTALLATION OF NEW ELECTRIC MINI-SPLIT HEATING AND AIR CONDITIONING SYSTEM FOR EXISTING RETAIL STORE. NO CHANGE IN USE, OCCUPANCY, EGRESS, OR FLOOR AREA.
B01175694-I1
02/01/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/06/2024
Permit issued — Plumbing
B01079540-S1-PL
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/05/2024
Permit issued — Mechanical Systems
B01079540-I1-GC-CX
07/25/2024
Filed — Alteration
PROPOSED INTERIOR BUILD-OUT OF NEW EATING & DRINKING ESTABLISHMENT AT #213 INCLUDING MINOR PARTITION WORK, INSTALLATION OF MILLWORK, PLUMBING FIXTURES, AND MINI-SPLIT HEATING AND AC UNITS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, FLOOR AREA OR EGRESS
B01079540-S1
07/25/2024
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Papa
07/24/2024
Filed — Alteration
PROPOSED INTERIOR BUILD-OUT OF NEW EATING & DRINKING ESTABLISHMENT AT #213 INCLUDING MINOR PARTITION WORK, INSTALLATION OF MILLWORK, PLUMBING FIXTURES, AND MINI-SPLIT HEATING AND AC UNITS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, FLOOR AREA OR EGRESS
B01079540-I1
07/24/2024
Special inspection requirement — Metering
Christopher Papa
07/15/2024
Special inspection requirement — Ventilation and air distribution system
Christopher Papa
07/15/2024
Special inspection requirement — Lighting controls
Christopher Papa
07/15/2024
Special inspection requirement — Interior lighting power
Christopher Papa
07/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Papa
07/11/2024
Special inspection requirement — Mechanical Systems
Christopher Papa
07/11/2024
Special inspection requirement — Final
Christopher Papa
06/07/2024
Violation issued (ECB, closed)
Construction
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/09/2022
Violation issued (HPD, closed)
I
01/19/2022
Violation issued (HPD, closed)
C
01/19/2022
Violation issued (HPD, open)
C
01/19/2022
Violation issued (HPD, open)
C
01/13/2022
Violation issued (HPD, closed)
A
01/13/2022
Violation issued (HPD, closed)
C
01/13/2022
Violation issued (HPD, closed)
A
01/13/2022
Violation issued (HPD, closed)
A
01/07/2022
Violation issued (HPD, closed)
A
01/07/2022
Violation issued (HPD, closed)
A
01/07/2022
Violation issued (HPD, closed)
B
12/23/2021
Violation issued (HPD, closed)
A
12/23/2021
Violation issued (HPD, closed)
C
12/23/2021
Violation issued (HPD, closed)
C
12/23/2021
Violation issued (HPD, closed)
A
12/23/2021
Violation issued (HPD, closed)
B
04/16/2021
Violation issued (HPD, closed)
I
04/16/2021
Violation issued (HPD, closed)
A
12/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/04/2019
Violation issued (HPD, closed)
I
11/19/2018
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
11/19/2018
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
10/24/2018
Violation issued (HPD, closed)
I
10/16/2015
Violation issued (HPD, closed)
I
07/09/2014
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
10/15/2012
Violation issued (ECB, closed)
Elevators
10/08/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/31/2005
Violation issued (ECB, closed)
Construction
03/01/2005
Violation issued (ECB, closed)
Construction
11/19/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/21/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offC A Clare Renovations02/27/2025
DOB NOWPlumbingPermit IssuedA P Plumbing & Heating12/06/2024
DOB NOWMechanical SystemsSigned-offC A Clare Renovations09/05/2024
BISPLISSUEDCatman Plumbing09/20/2018
BISOTISSUEDVision Contracting NY08/15/2018
BISMHISSUEDCall Metro Electric Associates06/30/2016
BISPLISSUEDTW Plumbing & Heating03/24/2016
BISOTISSUEDPrestige Remodeline03/14/2016
BISOTISSUEDPrestige Remodeline01/22/2016
BISOTISSUEDSquan Construction Services06/05/2015
BISPLISSUEDJ. Caiazzo Plumbing & Heating12/08/2014
BISPLISSUEDJ. Caiazzo Plumbing & Heating12/10/2013
BIS—ISSUEDTru-Art Sign Co05/14/2013
BISOTISSUEDTru-Art Sign Co05/14/2013
BIS—ISSUEDTru-Art Sign Co05/14/2013
BISPLISSUEDJ. Caiazzo Plumbing & Heating11/28/2012
BISEQISSUEDSherri Builders11/07/2012
BISOTISSUEDSherri Builders11/07/2012
BISOTISSUEDLiving Space Design06/26/2012
BISOTISSUEDCostrotta Construction Mang07/18/2007
BISPLISSUEDWilliam G Iafe04/04/2007
BISFPISSUEDAllied Fire Control05/31/2005
BISPLISSUEDWilliam G Iafe05/31/2005
BISPLISSUEDWilliam G Iafe03/31/2005
BISMHISSUEDMidcom Development03/31/2005
BISPLISSUEDJohn Hlad PLG and Heating08/19/1999
BISOTISSUEDBJW LLX07/29/1999
BISBLISSUEDCC Controlled Plumbing Co12/10/1997
1 project · most recent 07/25/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/25/2024Signed-offC & A Clare RenovationsHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MUZ-GGS36NA2 35,200 BTU · Heat Pump Outdoor ×1
1 project · most recent 07/25/2024
Water/Sanitary
FiledStatusContractorScope
07/25/2024Permit IssuedA P Plumbing & HeatingWater/Sanitary
1 project · most recent 07/22/2024
General Wiring
FiledStatusContractorScope
07/22/2024CompleteTMF Electrical ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/01/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
07/25/2024Tenant Protection Plan ComplianceChristopher Papaspecial
07/24/2024MeteringChristopher Papaenergy_progress
07/15/2024Ventilation and air distribution systemChristopher Papaenergy_progress
07/15/2024Lighting controlsChristopher Papaenergy_progress
07/15/2024Interior lighting powerChristopher Papaenergy_progress
07/15/2024Tenant Protection Plan ComplianceChristopher Papaspecial
07/11/2024Mechanical SystemsChristopher Papaspecial
07/11/2024FinalChristopher Papaprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Amaro Spirits & WineRetailFloor 1
Project B01175694 Alteration · LOC Issued · 02/04/2025
Avian Cocktail GroupRestaurant / Food ServiceCellar, Floor 1
Project B01079540 Alteration · Permit Entire · 07/24/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 161 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026B01079540-S1Request digital key ↗
08/24/2026B01079540-I1Request digital key ↗
08/23/2026B01175694-I1Request digital key ↗
▸Applications & Permits31
▸BISPLAN / WORK APPROVAL APPLICATION16
05/11/2018321742780Open ↗
04/16/2018321742780Open ↗
03/16/2016321319006Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION15
09/24/2018321742780Open ↗
07/05/2016321319006Open ↗
04/13/2016321319006Open ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications41
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
04/16/2018321742780Open ↗
04/19/2016321113371Open ↗
03/16/2016321319006Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
03/16/2016321319006Open ↗
01/20/2016321298751Open ↗
02/13/2013320690668Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
02/13/2013320690668Open ↗
02/13/2013320690659Open ↗
02/13/2013320690677Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B01079540-I1Open ↗
09/01/2026B01079540-I1Open ↗
09/01/2026B01079540-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026B01175694-I1Open ↗
08/13/2026B01079540-I1Open ↗
08/13/2026B01079540-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B01079540-I1Open ↗
09/01/2026B01079540-I1Open ↗
08/27/2026B01079540-S1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/16/2016321319006Open ↗
01/20/2016321298751Open ↗
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
04/16/2018321742780Open ↗
03/16/2016321319006Open ↗
01/20/2016321298751Open ↗
Showing 3 of 7 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
05/06/2019321742780Open ↗
11/02/2018321742780Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
01/30/2013320561334Open ↗
12/11/2012320561334Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/13/2015321113371Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/01/2022321742780Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
04/01/2022321742780Open ↗
▸BISSCHEDULE B - PLUMBING1
10/18/2012320561334Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
05/14/2018321742780Open ↗
▸BISSTREET TREE CHECKLIST1
06/14/2012320493051Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
04/16/2018321742780Open ↗
03/16/2016321319006Open ↗
01/20/2016321298751Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B01079540-S1Open ↗
08/13/2026B01079540-I1Open ↗
▸BISTHIS IS NOT AN ASBESTOS PROJECT1
06/14/2012320493051Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
05/30/2018321742780Open ↗
04/16/2018321742780Open ↗
07/01/2016321319006Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
05/03/2022321742780Open ↗
05/03/2022321742780Open ↗
04/01/2022321742780Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
05/03/2022321742780Open ↗
04/01/2022321742780Open ↗
04/19/2016321113371Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections1
12/27/2013320690677Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
05/03/2022321742780Open ↗
05/03/2022321742780Open ↗
04/01/2022321742780Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST5
12/27/2013320690668Open ↗
12/27/2013320690677Open ↗
12/27/2013320690659Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
04/27/2015321113371Open ↗
02/13/2013320690668Open ↗
02/13/2013320690659Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/13/2013320690677Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT16
05/03/2022321742780Open ↗
04/01/2022321742780Open ↗
05/30/2018321742780Open ↗
Showing 3 of 16 on file for this type
▸Filing & Intake Forms12
▸BISEFILING COVER SHEET9
04/16/2018321742780Open ↗
03/16/2016321319006Open ↗
01/20/2016321298751Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION3
02/25/2019321742780Open ↗
03/05/2015320561334Open ↗
02/02/2015320561334Open ↗