← Back
Walk-up apt, over six families with stores
211 AVENUE A
MANHATTAN · BIN 1006022
💬 Discuss this project
1900Year Built
6Stories
C7Building Class
C1-6AZoning
23,984 sfGross Floor Area
38Units
Rent Stabilized66 Open Violations 63 unresolved · 3 paperwork only ▸FISP: UNSAFE
Walk-up apt, over six families with stores · Owner of record: VILLAGE JV 211 AVENUE A LLC · 5,171 sf lot · 4.64 FAR built · Flood zone X
Locations of Work
ArchitectureCivilGeneral
Roof3p · 4 filings · 13 docs
Bulkhead1p · 1 filing · 2 docs
Floor 34p · 1 filing · 16 docs
Floor 26p · 1 filing · 12 docs
Floor 1
2 jobs · most recent 05/25/2022
Water/Sanitary Gas
FiledStatusContractorScope
05/25/2022Signed-offSTELLMAR PLBG & MECH.CORPGas, Water/Sanitary
09/01/2021Signed-offLUVER PLBG & HTG INCWater/Sanitary
4 jobs · most recent 04/17/2025
General Wiring
FiledStatusContractorScope
04/17/2025CompleteLAURA ELEC'L LIGHTING &—
07/18/2023CompleteCRESCO ELECTRICAL CORPGeneral Wiring
05/26/2021Permit IssuedV. VASS ELECTRIC CORP—
03/20/2018CompleteAPPO ELECTRICAL CONTRS INGeneral Wiring
1 job · most recent 06/07/2026
Masonry
FiledStatusContractorScope
06/07/2026——Masonry
1 job · most recent 06/01/2021
Sidewalk Shed
FiledStatusContractorScope
06/01/2021Permit IssuedGWT ENTERPRISES INCSidewalk Shed
1 job · most recent 01/21/2025
FiledStatusContractorScope
01/21/2025Permit IssuedSKYLINE ACCESS LLC—
Building Lifecycle
All (151)Filed (15)Permit Issued (17)Signed Off (2)Facade (FISP) (3)Violation (60)Inspection (10)Objection (14)Special Inspection (30)
08/06/2026
Filed — Alteration
AT&T - Relocation of existing antenna sectors with removal and installation of RRH units on roof. Removal, installation, and retrofit of cabinets on platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
M01330394-I1
06/07/2026
Filed — Alteration
Facade repairs as per plans. No change to use, occupancy, or egress.
M01401178-I1
05/12/2026
Special inspection requirement — Masonry
Hamidreza Saghari
05/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Hamidreza Saghari
05/12/2026
Special inspection requirement — Final
Leon Geoxavier
05/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
Hamidreza Saghari
05/05/2026
Violation issued (ECB, open)
Construction
03/19/2026
Cycle 10 facade report submitted
03/17/2026
Cycle 10 facade inspection completed
03/17/2026
Cycle 10 facade report signed — UNSAFE
02/03/2026
Violation issued (HPD, closed)
C
02/03/2026
Violation issued (HPD, closed)
C
01/30/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/02/2026
Permit issued — Sidewalk Shed
M00529433-I1-SH
11/19/2025
Permit issued — Sidewalk Shed
M00529433-I1-SH
10/07/2025
Violation issued (HPD, open)
C
10/07/2025
Violation issued (HPD, open)
C
08/13/2025
Violation issued (ECB, closed)
Construction
08/13/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/12/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
06/06/2025
Violation issued (HPD, open)
C
06/06/2025
Violation issued (HPD, open)
C
05/15/2025
Violation issued (ECB, open)
Local Law
04/03/2025
Violation issued (HPD, open)
C
04/03/2025
Violation issued (HPD, open)
C
03/26/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/27/2025
Permit issued — Suspended Scaffold
M01169351-I1-SC
01/21/2025
Filed — Alteration
IRA to assist with Condition Assessment.
M01169351-I1
01/08/2025
Permit issued — Sidewalk Shed
M00529433-I1-SH
12/08/2024
Violation issued (HPD, open)
B
12/08/2024
Violation issued (HPD, open)
B
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/09/2024
Permit issued — Sidewalk Shed
M00529433-I1-SH
08/14/2023
Violation issued (HPD, open)
B
08/14/2023
Violation issued (HPD, open)
B
08/14/2023
Violation issued (HPD, open)
B
08/14/2023
Violation issued (HPD, open)
B
08/14/2023
Violation issued (HPD, open)
B
08/14/2023
Violation issued (HPD, open)
B
08/14/2023
Violation issued (HPD, open)
B
07/16/2023
Violation issued (HPD, open)
C
07/16/2023
Violation issued (HPD, open)
C
07/16/2023
Violation issued (HPD, open)
B
06/17/2023
Violation issued (HPD, closed)
C
06/17/2023
Violation issued (HPD, open)
C
06/17/2023
Violation issued (HPD, open)
C
06/05/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/02/2023
Permit issued — Sidewalk Shed
M00529433-I1-SH
12/28/2022
Violation issued (HPD, closed)
B
12/28/2022
Violation issued (HPD, closed)
B
07/05/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/14/2022
Objection resolved — Addressed
06/14/2022
Objection resolved — Addressed
06/14/2022
Special inspection requirement — Energy Code Compliance Inspections
Balser Richard
06/14/2022
Special inspection requirement — Final
Balser Richard
06/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Balser Richard
06/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Balser Richard
06/14/2022
Special inspection requirement — Lighting in dwelling units
Balser Richard
06/14/2022
Special inspection requirement — Interior lighting power
Balser Richard
Latest 60 of 151 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LIVINGSTON MANAGEMENT SERVICES609/12/2026
WESTMINSTER MANAGEMENT1607/08/2026
504 EAST 12 STREET703/22/2026
AT&T MOBILITY703/22/2026
VILLAGE JV 211 AVENUE A2003/22/2026
VILLAGE JU211 AVE AVE ALL103/22/2026
OWNER OF 211 AVE A103/22/2026
211 AVENUE OWNER LLC2603/22/2026
JK2 WESTMINSTER303/21/2026
ARCHON ASSOCIATESC O MERLON MGMT303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KMB DESIGN GROUP, LLC108/06/2026
SAGHARI PC106/07/2026
NONE405/25/2022
ASIF JAMIL, RA409/01/2021
ASHRAF CORP106/01/2021
DEWBERRY ENGINEERS INC108/28/2020
NORTHEAST TOWER SURVEYING, INC.111/30/2018
TECTONIC ENGINEERING102/15/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SKYLINE ACCESS103/21/2026
MUNICIPAL BUILDING CONSULTANTS803/21/2026
CCM CONSULTING GROUP, INC.303/21/2026
Rigid Structural Design, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GWT ENTERPRISES INCGeneral Contractor507/08/2026
MARTE CONSTRUCTION INCGeneral Contractor303/21/2026
NETCOM SERVICES INCGeneral Contractor303/21/2026
D.G CONTRACTORS, INCGeneral Contractor303/21/2026
SAC WIRELESS,LLCGeneral Contractor303/21/2026
MANHATTAN D ENTERPRISESGeneral Contractor307/08/2026
LUVER PLBG & HTG INCPlumbing207/08/2026
IRONBO, INCGeneral Contractor203/21/2026
SCHUMAN, SElectrical103/21/2026
OVERLAND CONTRACTING INCGeneral Contractor107/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor104/09/2026
CARNEY, THOMASElectrical103/21/2026
STELLMAR PLBG & MECH.CORPPlumbing107/08/2026
CRESCO ELECTRICAL CORPElectrical103/22/2026
D'ANNUNZIO MICHAELElectrical103/21/2026
INTERBORO SIGN & MAINT INElectrical103/21/2026
MICHAEL D'ANNUNZIOElectrical103/21/2026
NOLAN, CORYElectrical103/21/2026
NY BLDG.VIOLATION CONSULTElectrical103/21/2026
PERRY, BENJAMINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KMB DESIGN GROUP, LLC513108/06/2026
NY RESTORATION TECHNOLOGY6187106/07/2026
RICHARD H. BALSER ENGINEE3028405/25/2022
ASIF JAMIL R.A.7506209/01/2021
R MARSAC CONSULTING LLC329108/28/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedGWT ENTERPRISES INC01/02/2026
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC11/19/2025
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC01/27/2025
DOB NOWSidewalk ShedPermit IssuedGWT ENTERPRISES INC01/08/2025
DOB NOWSidewalk ShedPermit IssuedGWT ENTERPRISES INC01/09/2024
DOB NOWSidewalk ShedPermit IssuedMANHATTAN D ENTERPRISES06/02/2023
DOB NOWSidewalk ShedPermit IssuedMANHATTAN D ENTERPRISES06/02/2022
DOB NOWPlumbingSigned-offSTELLMAR PLBG & MECH.CORP05/19/2022
DOB NOWGeneral ConstructionPermit IssuedD.G CONTRACTORS, INC03/31/2022
DOB NOWPlumbingSigned-offLUVER PLBG & HTG INC12/03/2021
DOB NOWPlumbingSigned-offLUVER PLBG & HTG INC07/26/2021
DOB NOWGeneral ConstructionPermit IssuedMARTE CONSTRUCTION INC06/25/2021
DOB NOWSidewalk ShedPermit IssuedMANHATTAN D ENTERPRISES06/04/2021
DOB NOWAntennaSigned-offOVERLAND CONTRACTING INC09/30/2020
DOB NOWAntennaPermit IssuedIRONBO07/15/2019
DOB NOWAntennaPermit IssuedSAC WIRELESS,LLC02/27/2019
DOB NOWAntennaSigned-offNETCOM SERVICES INC04/30/2018
BISFPISSUEDFIRE COMMAND CO, INC12/06/2018
BISPLISSUEDKATAN P & H INC03/13/2018
BISOTISSUEDEA REFINISHING INC12/28/2017
BISPLISSUEDSPARTAKUS PLBG & HTG INC04/20/2015
BISOTISSUEDALTZ GROUP INC04/08/2015
BISOTISSUEDMD. ASHRAF ALI04/23/2013
BISPLISSUEDDEMAR PLUMBING CORP10/17/2012
BISPLISSUEDDEMAR PLUMBING CORP10/05/2012
BIS—ISSUEDMETROPOLITAN SIGN&RIG COR01/31/2012
BISPLISSUEDNEW AMSTERDAM PLBG & HTG11/15/2011
BISOTISSUEDFIRST STANDARD CONSTR INC09/07/2011
BISOTISSUEDODYSSIA GLOBAL COMM. CORP01/24/2011
BISOTISSUEDODYSSIA GLOBAL COMM. CORP11/30/2010
BISOTISSUEDFIRST STANDARD CONSTR INC09/23/2010
BISOTISSUEDFIRST STANDARD CONSTR INC08/06/2010
BISOTISSUEDSQUAN CONSTRUCTION SERVIC06/14/2010
BISPLISSUEDDEMAR PLUMBING CORP02/22/2010
BISOTISSUEDFIRST STANDARD CONSTR INC02/16/2010
BISOTISSUEDFIRST STANDARD CONSTR INC11/06/2009
BISOTISSUEDW5 GROUP LLC08/18/2008
BISMHISSUEDJ HERNANEZ CONTRACTING CORP04/24/2008
BISMHISSUEDALL TECHNICAL ART10/12/2007
BISEQISSUEDM.I.A CONTRACTING INC03/30/2005
+ 13 more permits on file
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/12/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
03/26/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/05/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/04/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/04/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/22/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/20/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
05/12/2026MasonryHamidreza Sagharispecial
05/12/2026Structural Stability – Alterations of existing buildingsHamidreza Sagharispecial
05/12/2026FinalLeon Geoxavierprogress
05/12/2026Tenant Protection Plan ComplianceHamidreza Sagharispecial
06/14/2022Energy Code Compliance InspectionsBalser Richardprogress
06/14/2022FinalBalser Richardprogress
06/14/2022Fire-Resistant Penetrations and JointsBalser Richardspecial
06/14/2022Fire-Resistant Penetrations and JointsBalser Richardspecial
06/14/2022Lighting in dwelling unitsBalser Richardenergy_progress
06/14/2022Interior lighting powerBalser Richardenergy_progress
06/14/2022Lighting controlsBalser Richardenergy_progress
05/12/2022Lighting controlsBalser Richardenergy_progress
05/12/2022Fire-Resistant Penetrations and JointsBalser Richardspecial
05/12/2022Energy Code Compliance InspectionsBalser Richardprogress
05/12/2022FinalBalser Richardprogress
05/12/2022Fire-Resistant Penetrations and JointsBalser Richardspecial
05/12/2022Interior lighting powerBalser Richardenergy_progress
05/12/2022Lighting in dwelling unitsBalser Richardenergy_progress
09/07/2021Fire-Resistant Penetrations and Jointsasif jamilspecial
08/30/2021Fire-Resistant Penetrations and Jointsasif jamilspecial
07/01/2021Interior lighting powerasif jamilenergy_progress
07/01/2021Finalasif jamilprogress
07/01/2021Lighting in dwelling unitsasif jamilenergy_progress
07/01/2021Energy Code Compliance Inspectionsasif jamilprogress
07/01/2021Lighting controlsasif jamilenergy_progress
Latest 25 of 30.
▾Documents — 295 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch14
09/06/2026M00014826-I1Request digital key ↗
09/03/2026M00529433-I1Request digital key ↗
09/03/2026M00492731-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
09/04/2026M00376597-I1Request digital key ↗
▸Applications & Permits66
▸BISPLAN / WORK APPROVAL APPLICATION40
11/24/2021120483066Open ↗
11/10/2021120429884Open ↗
10/13/2021120429884Open ↗
Showing 3 of 40 on file for this type
▸BISWORK PERMIT APPLICATION26
11/28/2018140817908Open ↗
03/14/2018123256412Open ↗
12/29/2017123256412Open ↗
Showing 3 of 26 on file for this type
▸Seals & Professional Certifications82
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
08/22/2018122360220Open ↗
11/15/2017123256412Open ↗
08/17/2015122477195Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/06/2026M00014826-I1Open ↗
09/06/2026M00083131-I1Open ↗
09/04/2026M00376597-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/18/2026M00691239-I1Open ↗
09/18/2026M00691239-I1Open ↗
08/29/2026M00492731-P1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
08/17/2015122477195Open ↗
04/14/2015122360220Open ↗
04/29/2013121596816Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
04/29/2013121596816Open ↗
10/27/2011120825438Open ↗
09/28/2011120812932Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/18/2026M00691239-I1Open ↗
09/01/2026M00554950-P1Open ↗
08/29/2026M01401178-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/28/2018140817908Open ↗
08/17/2015122477195Open ↗
04/14/2015122360220Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/28/2018140817908Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/28/2018140817908Open ↗
▸Trade Schedules & Equipment21
▸BISSCHEDULE B - PLUMBING9
09/28/2011120812932Open ↗
09/30/2010120483066Open ↗
09/24/2010120429884Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
03/20/2018123256412Open ↗
11/15/2017123256412Open ↗
08/18/2015122360220Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
02/16/2012120812932Open ↗
12/13/2011120812932Open ↗
06/18/2010120266648Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES2
11/28/2018140817908Open ↗
11/15/2017123256412Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00376597-I1Open ↗
▸Environmental & Asbestos30
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'13
10/27/2011120825438Open ↗
09/28/2011120812932Open ↗
09/27/2011120827052Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/06/2026M00014826-I1Open ↗
09/04/2026M00376597-I1Open ↗
09/03/2026M00554950-I1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
11/15/2017123256412Open ↗
08/17/2015122477195Open ↗
04/14/2015122360220Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/15/2017123256412Open ↗
08/17/2015122477195Open ↗
04/14/2015122360220Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
04/25/2012120812932Open ↗
04/17/2012120812932Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/17/2012120812932Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
11/23/2021120429884Open ↗
09/27/2021120200022Open ↗
09/21/2021120266648Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs17
▸BISADMINISTRATIVE OBJECTIONS12
04/29/2013121596816Open ↗
10/27/2011120825438Open ↗
09/28/2011120812932Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
04/17/2012120812932Open ↗
04/09/2012120532361Open ↗
06/20/2011120362632Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/28/2018140817908Open ↗
04/09/2012120532361Open ↗
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT21
11/28/2018140817908Open ↗
12/28/2017123256412Open ↗
11/15/2017123256412Open ↗
Showing 3 of 21 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT6
04/29/2013121596816Open ↗
09/20/2011120812932Open ↗
09/30/2010120483066Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms20
▸BISEFILING COVER SHEET11
11/15/2017123256412Open ↗
08/17/2015122477195Open ↗
04/14/2015122360220Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION5
10/13/2021120429884Open ↗
04/11/2018123256412Open ↗
08/18/2015122360220Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
08/22/2018122360220Open ↗
03/20/2018123256412Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
11/28/2018140817908Open ↗
02/16/2010120266648Open ↗
▸Other Documents2
▸BISDHCR DOCUMENT1
10/13/2021120429884Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01169351-I1Open ↗