211 CANAL STREET
STATEN ISLAND · Tompkinsville-Stapleton-Clifton-Fox Hills · BIN 5141769
💬 Discuss this project
2004Year Built
2Stories
P5Building Class
R6BZoning
6,400 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Community center · Owner of record: 211 CANAL ST. REALTY LLC · 9,000 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingFire Protection
Roof13p · 3 filings · 20 docs
Floor 213p · 3 filings · 20 docs
Floor 118p · 4 filings · 20 docs
Cellar14p · 3 filings · 20 docs
Site & exterior3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MARSAL OF NY CONTRACTING INC2103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KDV DESIGNS ARCHITECTS LLC209/26/2023
EP ENGINEERING LLC804/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.1603/21/2026
TBC & ASSOC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAMMOTH INCGeneral Contractor703/22/2026
JPI PLUMBING & HEATING INPlumbing307/08/2026
JMG CONSULTANTS INCElectrical103/21/2026
JPI PLUMBING & HEATING INFire Protection107/08/2026
MASTER FIRE MECH CORPGeneral Contractor107/08/2026
JPI PLUMBING HEATING INPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NS ENGINEERING & CONSULTI3652209/26/2023
EP INSPECTIONS AND COMMIS7079804/20/2023
Building Lifecycle
All (69)Filed (10)Permit Issued (6)Signed Off (4)Violation (7)Inspection (8)Objection (4)Special Inspection (30)
09/18/2024
Violation issued (FDNY_NOV, closed)
02/13/2024
Signed off — Alteration
Install (1) New Rooftop HVAC Unit Related Ductwork as per Amended submitted plans as filed under DOB alteration application #520397605. Existing Rooftop Units and related ductwork are to now remain unchanged.
S00400891-I1
10/12/2023
Signed off — Alteration
FILING TO INSTALL NEW COMMERCIAL KITCHEN COOKING VENTILATION SYSTEM. INSTALLING NEW S/S HOOD WITH NEW EXHAUST/MUA DUCTS AND NEW EXHAUST/MUA FANS. NO OTHER WORK TO BE DONE TO BE UNDER THIS FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S08023710-I1
09/26/2023
Filed — Alteration
FILING TO INSTALL NEW COMMERCIAL KITCHEN COOKING VENTILATION SYSTEM. INSTALLING NEW S/S HOOD WITH NEW EXHAUST/MUA DUCTS AND NEW EXHAUST/MUA FANS. NO OTHER WORK TO BE DONE TO BE UNDER THIS FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S08023710-P1
09/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARI MOTWANI
09/26/2023
Special inspection requirement — Maintenance information
NARI MOTWANI
09/26/2023
Special inspection requirement — Electrical motors and elevators
NARI MOTWANI
09/26/2023
Special inspection requirement — Duct leakage testing, insulation and design
NARI MOTWANI
09/26/2023
Special inspection requirement — Final
DAVIDSON CHRISTMAS
09/26/2023
Special inspection requirement — Energy Code Compliance Inspections
DAVIDSON CHRISTMAS
09/26/2023
Special inspection requirement — Mechanical Systems
NARI MOTWANI
09/25/2023
Special inspection requirement — Electrical motors and elevators
NARI MOTWANI
09/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARI MOTWANI
09/25/2023
Special inspection requirement — Mechanical Systems
NARI MOTWANI
09/25/2023
Special inspection requirement — Energy Code Compliance Inspections
DAVIDSON CHRISTMAS
09/25/2023
Special inspection requirement — Final
DAVIDSON CHRISTMAS
09/25/2023
Special inspection requirement — Duct leakage testing, insulation and design
NARI MOTWANI
09/25/2023
Special inspection requirement — Maintenance information
NARI MOTWANI
09/16/2023
Violation issued (FDNY_NOV, closed)
09/12/2023
Violation issued (FDNY_NOV, closed)
07/05/2023
Violation issued (FDNY_NOV, closed)
05/02/2023
Special inspection requirement — HVAC and service water heating system controls
Christopher Burgess
05/02/2023
Special inspection requirement — HVAC and service water heating equipment
Christopher Burgess
05/02/2023
Special inspection requirement — Mechanical Systems
Christopher Burgess
05/02/2023
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
05/02/2023
Special inspection requirement — Final
Christopher Burgess
05/02/2023
Special inspection requirement — Maintenance information
Christopher Burgess
05/02/2023
Special inspection requirement — HVAC insulation and sealing
Christopher Burgess
05/02/2023
Special inspection requirement — Shutoff dampers
Christopher Burgess
04/20/2023
Filed — Alteration
Install (1) New Rooftop HVAC Unit Related Ductwork as per Amended submitted plans as filed under DOB alteration application #520397605. Existing Rooftop Units and related ductwork are to now remain unchanged.
S00400891-P2
03/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
03/27/2023
Special inspection requirement — Mechanical Systems
Christopher Burgess
03/27/2023
Special inspection requirement — Shutoff dampers
Christopher Burgess
03/27/2023
Special inspection requirement — HVAC insulation and sealing
Christopher Burgess
03/27/2023
Special inspection requirement — HVAC and service water heating system controls
Christopher Burgess
03/27/2023
Special inspection requirement — HVAC and service water heating equipment
Christopher Burgess
03/27/2023
Special inspection requirement — Maintenance information
Christopher Burgess
03/27/2023
Special inspection requirement — Final
Christopher Burgess
02/15/2023
Signed off — Alteration
Install plumbing fixtures and New Gas Fired Rooftop HVAC Unit as per submitted plans as filed under DOB alteration application #520397605
S00400829-I1
02/14/2023
Signed off — Alteration
Perform Sprinkler System Modifications to Existing Sprinkler System as per submitted plans as filed under DOB alteration application #520397605
S00400904-I1
02/07/2023
Permit issued — Mechanical Systems
S00400891-I1-MS
02/03/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/15/2022
Permit issued — Mechanical Systems
S08023710-I1-MS
11/08/2022
Filed — Alteration
FILING TO INSTALL NEW COMMERCIAL KITCHEN COOKING VENTILATION SYSTEM. INSTALLING NEW S/S HOOD WITH NEW EXHAUST/MUA DUCTS AND NEW EXHAUST/MUA FANS. NO OTHER WORK TO BE DONE TO BE UNDER THIS FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S08023710-I1
11/03/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/15/2022
Objection resolved — Addressed
09/03/2022
Permit issued — Plumbing
S00400829-I1-PL
08/31/2022
Objection raised — Scope
08/19/2022
Filed — Alteration
Install plumbing fixtures and New Gas Fired Rooftop HVAC Unit as per submitted plans as filed under DOB alteration application #520397605
S00400829-P3
08/17/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/11/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/27/2022
Filed — Alteration
Install plumbing fixtures and New Gas Fired Rooftop HVAC Unit as per submitted plans as filed under DOB alteration application #520397605
S00400829-P2
07/20/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/31/2022
Filed — Alteration
Install plumbing fixtures and New Gas Fired Rooftop HVAC Unit as per submitted plans as filed under DOB alteration application #520397605
S00400829-P1
03/15/2022
Filed — Alteration
Install (1) New Rooftop HVAC Unit Related Ductwork as per Amended submitted plans as filed under DOB alteration application #520397605. Existing Rooftop Units and related ductwork are to now remain unchanged.
S00400891-P1
02/09/2022
Permit issued — Mechanical Systems
S00400891-I1-MS
02/08/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/24/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/03/2021
Permit issued — Sprinklers
S00400904-I1-EW-SP
09/20/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMAMMOTH INC02/07/2023
DOB NOWMechanical SystemsSigned-offMASTER FIRE MECH CORP11/15/2022
DOB NOWPlumbingSigned-offJPI PLUMBING & HEATING IN09/03/2022
DOB NOWMechanical SystemsSigned-offMAMMOTH INC02/09/2022
DOB NOWSprinklersSigned-offJPI PLUMBING & HEATING IN12/03/2021
DOB NOWPlumbingSigned-offJPI PLUMBING & HEATING IN08/18/2021
BISPLISSUEDWEST SHORE CONSULTING INC02/03/2005
BISFPISSUEDACTIVE FIRE EXTINGUISHER CO.,INC11/10/2004
BISPLISSUEDWEST SHORE CONSULTING INC03/16/2004
BISEQISSUEDLOFFRENO DEVELOP AND CONS01/27/2004
BIS—ISSUEDLOFFRENO DEVELOP AND CONS01/27/2004
1 project · most recent 07/01/2021
General Wiring
FiledStatusContractorScope
07/01/2021CompleteJ.P.E. ELEC'L CONTR'S INCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/03/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/03/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/17/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/11/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/20/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/08/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/20/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
09/26/2023Fire-Resistant Penetrations and JointsNARI MOTWANIspecial
09/26/2023Maintenance informationNARI MOTWANIenergy_progress
09/26/2023Electrical motors and elevatorsNARI MOTWANIenergy_progress
09/26/2023Duct leakage testing, insulation and designNARI MOTWANIenergy_progress
09/26/2023FinalDAVIDSON CHRISTMASprogress
09/26/2023Energy Code Compliance InspectionsDAVIDSON CHRISTMASprogress
09/26/2023Mechanical SystemsNARI MOTWANIspecial
09/25/2023Electrical motors and elevatorsNARI MOTWANIenergy_progress
09/25/2023Fire-Resistant Penetrations and JointsNARI MOTWANIspecial
09/25/2023Mechanical SystemsNARI MOTWANIspecial
09/25/2023Energy Code Compliance InspectionsDAVIDSON CHRISTMASprogress
09/25/2023FinalDAVIDSON CHRISTMASprogress
09/25/2023Duct leakage testing, insulation and designNARI MOTWANIenergy_progress
09/25/2023Maintenance informationNARI MOTWANIenergy_progress
05/02/2023HVAC and service water heating system controls Christopher Burgessenergy_progress
05/02/2023HVAC and service water heating equipment Christopher Burgessenergy_progress
05/02/2023Mechanical SystemsChristopher Burgessspecial
05/02/2023Energy Code Compliance InspectionsChristopher Burgessprogress
05/02/2023FinalChristopher Burgessprogress
05/02/2023Maintenance informationChristopher Burgessenergy_progress
05/02/2023HVAC insulation and sealing Christopher Burgessenergy_progress
05/02/2023Shutoff dampersChristopher Burgessenergy_progress
03/27/2023Energy Code Compliance InspectionsChristopher Burgessprogress
03/27/2023Mechanical SystemsChristopher Burgessspecial
03/27/2023Shutoff dampersChristopher Burgessenergy_progress
Latest 25 of 38.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch - Plumbing4
08/24/2026S00400829-P2Request digital key ↗
08/24/2026S00400829-P1Request digital key ↗
08/24/2026S00400829-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/23/2026S00400891-I1Request digital key ↗
08/23/2026S00400891-P2Request digital key ↗
08/23/2026S00400891-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/23/2026S08023710-I1Request digital key ↗
08/23/2026S08023710-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/15/2026S00400904-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION8
03/26/2024520397605Open ↗
03/22/2024520397605Open ↗
04/12/2022520397605Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/22/2022520397605Open ↗
▸BISWORK PERMIT APPLICATION1
04/16/2021520397605Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
02/15/2023520397605Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/14/2023520397605Open ↗
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature19
08/30/2026S00400891-I1Open ↗
08/30/2026S00400891-I1Open ↗
08/30/2026S00400891-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/24/2026S00400829-I1Open ↗
08/24/2026S00400829-P3Open ↗
08/24/2026S00400829-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/30/2026S00400891-I1Open ↗
08/28/2026S08023710-P1Open ↗
08/28/2026S08023710-P1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/25/2020520397605Open ↗
▸Trade Schedules & Equipment1
▸BISSPRINKLER (SP) SIGNOFF1
02/17/2023520397605Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
08/19/2020520397605Open ↗
▸Environmental & Asbestos8
▸DOB NOWOER: Notice to Proceed6
08/13/2026S00400904-I1Open ↗
08/13/2026S00400829-P1Open ↗
08/13/2026S00400829-I1Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE1
02/05/2021520397605Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026S08023710-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/03/2023520397605Open ↗
12/14/2020520397605Open ↗
▸BISLIGHTING CONTROLS1
02/14/2023520397605Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/03/2023520397605Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/25/2020520397605Open ↗
▸BISINTERIOR LIGHTING POWER1
02/14/2023520397605Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00400829-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00400891-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/03/2023520397605Open ↗
12/14/2020520397605Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/14/2023520397605Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/14/2023520397605Open ↗
▸Approvals, Objections & Sign-offs8
▸BISSCHEDULE A - OCCUPANCY / USE5
03/26/2024520397605Open ↗
03/22/2024520397605Open ↗
12/16/2020520397605Open ↗
Showing 3 of 5 on file for this type
▸BISFIRE SUPPRESSION SYSTEM (FP) SIGNOFF2
02/14/2023520397605Open ↗
02/14/2023520397605Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/25/2020520397605Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
02/25/2020520397605Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/03/2023520397605Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION5
02/17/2023520397605Open ↗
07/18/2022520397605Open ↗
12/17/2020520397605Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET1
02/25/2020520397605Open ↗
▸Other Documents2
▸BISTCO - Supporting Documents1
02/17/2023520397605Open ↗
▸BISPLOT DIAGRAM1
03/04/2020520397605Open ↗