← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
211 ELIZABETH STREET
MANHATTAN · SoHo-Little Italy-Hudson Square · BIN 1084914
💬 Discuss this project
2007Year Built
7Stories
RMBuilding Class
C6-2Zoning
24,106 sfGross Floor Area
16Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 211 ELIZABETH STREET CONDOMINIUM · 5,264 sf lot · 4.58 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof10p · 2 filings · 20 docs
Floor 41p · 2 filings · 6 docs
Floor 3
Floor 2
Floor 14p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
POFI CONSTRUCTION1107/08/2026
BROWN HARRIS STEVENS2407/08/2026
KINTO USA INC503/22/2026
ALLEN PLAZA ASSOC.103/22/2026
ALLEN PLAZA ASSOCIATION103/22/2026
16 PRINCE DEVELOPMENT2703/22/2026
MAJOR ELEVATOR CORP.103/22/2026
16 PRINCE DEVELP. LLC103/22/2026
RYDER CONSTRUCTION403/22/2026
VINCE403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CH BUILDING CONSULTANTS203/21/2026
HIERARCH-E803/21/2026
BERTOLINI ARCHITECTURAL WORKS DPC203/21/2026
HOWARD L ZIMMERMAN ARCHITECTS203/21/2026
BODNAR ARCHITECTURE P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor1007/08/2026
TACONIC BUILDERS INCGeneral Contractor407/08/2026
POFI CONSTRUCTION CORPGeneral Contractor404/08/2026
VERA FORMA LLCGeneral Contractor303/21/2026
CRYSTAL COMFORT INCGeneral Contractor203/21/2026
SKINNER PLUMBING & HEATINGPlumbing107/08/2026
GREGORY PAPANTONIOUElectrical103/21/2026
SEA-DAR ENTERPRISES, INCGeneral Contractor107/08/2026
ARCON PLBG SOLUTIONSPlumbing107/08/2026
CESAR REYESElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ATLAS ATC ENGINEERING INC8011106/18/2024
HOWARD L ZIMMERMAN ARCHIT1712104/29/2024
IP CONCRETE TESTING AND I6252108/22/2023
PETER CHIANG ARCHITECT5872107/30/2021
Building Lifecycle
All (115)Filed (16)Permit Issued (19)Signed Off (7)Facade (FISP) (9)Violation (50)Inspection (3)Objection (6)Special Inspection (5)
07/27/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01071156-I1
06/23/2026
Permit issued — Sidewalk Shed
M01071156-I1-SH
06/02/2026
Signed off — Alteration
Suspended scaffold installation as per plans filed herewith.
M01048130-S1
04/08/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/17/2025
Violation issued (HPD, closed)
I
11/10/2025
Filed — Alteration
Suspended scaffold installation as per plans filed herewith.
M01048130-P3
11/03/2025
Filed — Alteration
Suspended scaffold installation as per plans filed herewith.
M01048130-P2
10/21/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY MECHANICAL EQUIPMENT PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M01202483-I1
10/21/2025
Signed off — Alteration
M01106177-I1
09/02/2025
Permit issued — Supported Scaffold
M01106177-I1-SF
08/01/2025
Permit issued — Suspended Scaffold
M01048130-S1-SC
07/25/2025
Permit issued — General Construction
M01048130-I1-GC
06/23/2025
Permit issued — Sidewalk Shed
M01071156-I1-SH
06/13/2025
Violation issued (HPD, closed)
A
03/31/2025
Filed — Alteration
INSTALLATION OF TEMPORARY MECHANICAL EQUIPMENT PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M01202483-I1
03/31/2025
Permit issued — Protection and Mechanical Methods
M01202483-I1-PMM
03/27/2025
Filed — Alteration
Installation of a heavy duty pipe scaffold.
M01199006-I1
03/27/2025
Permit issued — Supported Scaffold
M01199006-I1-SF
03/24/2025
Filed — Alteration
Suspended scaffold installation as per plans filed herewith.
M01048130-P1
03/06/2025
Signed off — Alteration
M01040950-I1
09/11/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01071156-P1
09/06/2024
Permit issued — Supported Scaffold
M01106177-I1-SF
09/05/2024
Filed — Alteration
M01106177-I1
09/05/2024
Permit issued — Mechanical Systems
M01040950-I1-MS
08/21/2024
Filed — Alteration
Suspended scaffold installation as per plans filed herewith.
M01048130-S1
08/21/2024
Permit issued — Suspended Scaffold
M01048130-S1-SC
08/01/2024
Permit issued — General Construction
M01048130-I1-GC
07/02/2024
Objection resolved — Addressed
07/02/2024
Objection resolved — Addressed
07/01/2024
Objection raised — Scope
07/01/2024
Objection raised — Scope
06/26/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01071156-I1
06/26/2024
Permit issued — Sidewalk Shed
M01071156-I1-SH
06/18/2024
Filed — Alteration
Suspended scaffold installation as per plans filed herewith.
M01048130-I1
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/30/2024
Signed off — Alteration
Removal and Relocation of minor Interior Partitions in Penthouse A. No change in Occupancy use or Egress.
M00921357-I1
04/30/2024
Permit issued — General Construction
M00921357-I1-GC
04/29/2024
Filed — Alteration
M01040950-I1
04/29/2024
Signed off — Alteration
Replacement of Existing Fixtures on Existing Line. No change in occupancy use or egress.
M00921773-I1
04/08/2024
Cycle 9 facade report signed — SWARMP
01/31/2024
Permit issued — General Construction
M00921357-I1-GC
01/26/2024
Cycle 9 facade report submitted
12/19/2023
Cycle 9 facade inspection completed
11/30/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/22/2023
Permit issued — Plumbing
M00921773-I1-PL
11/15/2023
Violation issued (HPD, closed)
I
09/25/2023
Permit issued — General Construction
M00921357-I1-GC
09/12/2023
Objection resolved — Addressed
09/06/2023
Objection raised — Scope
09/05/2023
Permit issued — General Construction
M00918603-I1-GC
08/28/2023
Filed — Alteration
Removal and Relocation of minor Interior Partitions in Penthouse A. No change in Occupancy use or Egress.
M00921357-I1
08/28/2023
Filed — Alteration
Replacement of Existing Fixtures on Existing Line. No change in occupancy use or egress.
M00921773-I1
08/22/2023
Filed — Alteration
INTERIOR RENOVATION OF AN EXISTING RETAIL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00918603-I1
08/18/2023
Special inspection requirement — Energy Code Compliance Inspections
Barry Berg
08/18/2023
Special inspection requirement — Final
Barry Berg
08/18/2023
Special inspection requirement — Lighting in dwelling units
Barry Berg
01/25/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/03/2021
Permit issued — Plumbing
M00630479-I1-PL
11/15/2021
Filed — Alteration
M00630479-I1
08/03/2021
Permit issued — General Construction
M00567807-I1-GC
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC06/23/2026
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC09/02/2025
DOB NOWSuspended ScaffoldSigned-offPOFI CONSTRUCTION CORP08/01/2025
DOB NOWGeneral ConstructionPermit IssuedPOFI CONSTRUCTION CORP07/25/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC06/23/2025
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC03/31/2025
DOB NOWSupported ScaffoldPermit IssuedPOFI CONSTRUCTION CORP03/27/2025
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC09/06/2024
DOB NOWMechanical SystemsSigned-offCRYSTAL COMFORT09/05/2024
DOB NOWSuspended ScaffoldSigned-offPOFI CONSTRUCTION CORP08/21/2024
DOB NOWGeneral ConstructionPermit IssuedPOFI CONSTRUCTION CORP08/01/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC06/26/2024
DOB NOWGeneral ConstructionSigned-offTACONIC BUILDERS INC04/30/2024
DOB NOWGeneral ConstructionSigned-offTACONIC BUILDERS INC01/31/2024
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS11/22/2023
DOB NOWGeneral ConstructionSigned-offTACONIC BUILDERS INC09/25/2023
DOB NOWGeneral ConstructionPermit IssuedVERA FORMA LLC09/05/2023
DOB NOWPlumbingPermit IssuedSKINNER PLUMBING & HEATIN12/03/2021
DOB NOWGeneral ConstructionPermit IssuedSEA-DAR ENTERPRISES, INC08/03/2021
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR08/08/2019
BISMHISSUEDCHARLES RUSSO INC06/03/2019
BISOTISSUEDCHARLES RUSSO INC06/03/2019
BISOTISSUEDEDRAS GROUP CORP07/20/2016
BISOTISSUEDEDRAS GROUP CORP02/29/2016
BISOTISSUEDEDRAS GROUP CORP09/14/2015
BISEQISSUEDROCK GROUP NY CORP09/01/2015
BISOTISSUEDTWIN RESOURCES INC11/05/2014
BISPLISSUEDORBIT PLBG & HTG INC05/07/2014
BISOTISSUEDM.N.C. GENERAL CONTR CORP05/01/2014
BIS—ISSUEDL.S. SIGN CO., INC11/25/2013
BISEQISSUEDREPUBLIC SCAFFOLD CORP06/20/2012
BISOTISSUEDMOND DESIGN ASSOCIATES IN04/20/2012
BISSPISSUEDCAPITOL FIRE SPKL CO,INC03/19/2012
BISOTISSUEDMOND DESIGN ASSOCIATES IN02/27/2012
BISOTISSUEDHALSTED S WELLES ASSOC.IN01/10/2012
BIS—ISSUEDRYDER CONSTRUCTION INC01/28/2010
BISEQISSUEDRYDER CONSTRUCTION INC01/27/2010
BIS—ISSUEDL.S. SIGN CO., INC08/26/2009
BIS—ISSUEDL.S. SIGN CO., INC08/21/2009
BIS—ISSUEDL.S. SIGN CO., INC08/21/2009
+ 29 more permits on file
7 projects · most recent 12/22/2024
General Wiring
FiledStatusContractorScope
12/22/2024CompleteC R ELECTRIC INCGeneral Wiring
07/01/2024Permit IssuedBOROWIDE ELECT'L CONTR'S—
07/11/2023CompleteJTE ELECTRICAL SERVICESGeneral Wiring
10/16/2020CompleteANTONIO CERIELLO ELEC INC—
12/26/2019CompleteTHREETECH ELECTRIC, INCGeneral Wiring
07/31/2019CompleteDAVEN ELECTRIC CORP—
06/05/2019CompleteAUR0RA ELECL CONTG INCGeneral Wiring
2 projects · most recent 03/27/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/27/2025Permit IssuedPOFI CONSTRUCTION CORPScaffold
09/11/2024Signed-offANDAMIO SCAFFOLDING LLCSidewalk Shed
1 project · most recent 11/10/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
11/10/2025Signed-offPOFI CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/08/2026Fail-Final General Construction Non-Directive 14FailView ↗
11/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/18/2023Energy Code Compliance InspectionsBarry Bergprogress
08/18/2023FinalBarry Bergprogress
08/18/2023Lighting in dwelling unitsBarry Bergenergy_progress
07/30/2021Fire-Resistant Penetrations and JointsPeter Chiangspecial
07/30/2021FinalPeter Chiangprogress
▾Documents — 350 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
09/03/2026M00567807-I1Request digital key ↗
09/03/2026M00630479-I1Request digital key ↗
08/29/2026M00918603-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits74
▸BISPLAN / WORK APPROVAL APPLICATION41
02/10/2020121808945Open ↗
12/16/2019121808945Open ↗
12/11/2019140880321Open ↗
Showing 3 of 41 on file for this type
▸BISWORK PERMIT APPLICATION31
12/11/2019140880321Open ↗
08/09/2019123870560Open ↗
06/03/2019123870560Open ↗
Showing 3 of 31 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1132
02/10/2020121808945Open ↗
12/16/2019121808945Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISRESTRICTION: EASEMENT AGREEMENT1
05/25/2017123018224Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
05/25/2017123018224Open ↗
▸Seals & Professional Certifications80
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION35
05/30/2019123870560Open ↗
05/30/2019123870560Open ↗
05/01/2019122158850Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/03/2026M00630479-I1Open ↗
08/29/2026M00921357-I1Open ↗
08/27/2026M01040950-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
11/29/2013121808945Open ↗
06/21/2012121117077Open ↗
10/06/2010110473728Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
06/21/2012121117077Open ↗
Showing 1 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/11/2019140880321Open ↗
08/31/2015140386892Open ↗
11/29/2013121808945Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026M00567807-I1Open ↗
08/26/2026M00921357-I1Open ↗
08/26/2026M00921357-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/11/2019140880321Open ↗
08/31/2015140386892Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/11/2019140880321Open ↗
08/31/2015140386892Open ↗
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISApplicant / Owner Signature1
04/14/2014140179072Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026M00567807-I1Open ↗
▸Trade Schedules & Equipment19
▸BISSELF-CERT PLUMBING NOTICE5
07/30/2014140179072Open ↗
06/18/2014140179072Open ↗
04/26/2012120985416Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
10/23/2019123870560Open ↗
04/09/2019123870560Open ↗
07/25/2017121291477Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING4
04/14/2014140179072Open ↗
05/07/2012120985416Open ↗
03/05/2012120985416Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
04/21/2011110313599Open ↗
03/24/2011110313599Open ↗
Showing 2 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes3
04/09/2019123870560Open ↗
07/25/2017121291477Open ↗
02/15/2017123018224Open ↗
▸BISSTREET TREE CHECKLIST1
05/25/2017123018224Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/25/2017123018224Open ↗
▸Environmental & Asbestos20
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)5
03/05/2012120985416Open ↗
03/05/2012120985416Open ↗
03/05/2012120985416Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026M00921357-I1Open ↗
08/27/2026M01040950-I1Open ↗
08/13/2026M00921773-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
05/01/2019122158850Open ↗
05/01/2019122158850Open ↗
04/30/2019140179072Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
05/01/2019122158850Open ↗
04/30/2019140179072Open ↗
07/28/2017122216477Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
05/01/2014140179072Open ↗
04/14/2014140179072Open ↗
11/03/2011120760863Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/21/2021140880321Open ↗
12/11/2019140880321Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/11/2019140880321Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/21/2021140880321Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
07/27/2021123870560Open ↗
07/27/2021123870560Open ↗
07/27/2021123870560Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs30
▸BISADMINISTRATIVE OBJECTIONS14
06/21/2012121117077Open ↗
03/05/2012120985416Open ↗
08/03/2011120760863Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
07/27/2021123870560Open ↗
04/21/2021140880321Open ↗
05/01/2019122158850Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/24/2009120003209Open ↗
Showing 1 of 2 on file for this type
▸BISLANDMARKS APPROVAL1
05/07/2019123870560Open ↗
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT28
07/27/2021123870560Open ↗
12/11/2019140880321Open ↗
05/01/2019122158850Open ↗
Showing 3 of 28 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/21/2021140880321Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
07/03/2017122216477Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
02/29/2012120985416Open ↗
▸Filing & Intake Forms34
▸BISEFILING COVER SHEET16
04/09/2019123870560Open ↗
04/09/2019123870560Open ↗
07/25/2017121291477Open ↗
Showing 3 of 16 on file for this type
▸BISBOROUGH INTAKE FORM8
02/10/2020121808945Open ↗
12/16/2019121808945Open ↗
10/23/2019123870560Open ↗
Showing 3 of 8 on file for this type
▸BISeFiling Job Application Cover Sheet6
12/11/2019140880321Open ↗
08/31/2015140386892Open ↗
04/14/2014140179072Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION4
08/04/2017121291477Open ↗
09/29/2014140179072Open ↗
09/12/2014140179072Open ↗
Showing 3 of 4 on file for this type
▸Other Documents12
▸DOB NOWCalculations4
08/13/2026M01048130-P1Open ↗
08/13/2026M01048130-S1Open ↗
08/13/2026M01048130-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications4
08/13/2026M01048130-S1Open ↗
08/13/2026M01048130-P2Open ↗
08/13/2026M01048130-P3Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
05/25/2017123018224Open ↗
Showing 1 of 3 on file for this type
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
08/31/2015140386892Open ↗