← Back
BROOKLYN
211 MCGUINNESS BOULEVARD
BROOKLYN · BIN 3379800
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
1,545 Open Violations ▸FISP: No Report FiledFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 4 filings · 9 docs
Floor 2Under Construction5p · 2 filings · 11 docs
Floor 146p · 14 filings · 20 docs
Cellar2p · 1 filing · 3 docs
2 jobs · most recent 01/02/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/02/2025Permit IssuedDVE CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PEFY-P18NMAU-E 20,000 BTU · Vrf Indoor ×2
PUMY-P60NKMU3 66,000 BTU · Vrf Outdoor ×2
PEFY-P24NMAU-E4 27,000 BTU · Vrf Indoor ×1
PEFY-P54NMHU-E2 60,000 BTU · Vrf Indoor ×1
01/25/2024Permit IssuedAK PREMIER CONTRACTINGHeating and Air Conditioning Systems
Heat / Cool
Lg ARNU243M1A4 27,300 BTU · Vrf Indoor ×2
ARUM048GSS5 54,000 BTU · Vrf Outdoor ×1
2 jobs · most recent 12/26/2024
FiledStatusContractorScope
12/26/2024Permit IssuedRRP PLUMBING CORP—
06/14/2022——69 heads
3 jobs · most recent 01/13/2026
Water/Sanitary
FiledStatusContractorScope
01/13/2026Signed-offVERTEX P & H CORPWater/Sanitary
12/26/2024Permit IssuedRRP PLUMBING CORPWater/Sanitary
09/03/2020Signed-offCAPE PLUMBING INCWater/Sanitary
11 jobs · most recent 08/01/2026
General Wiring
FiledStatusContractorScope
08/01/2026Permit IssuedRICHARD NEU—
11/24/2025CompleteGOODALL ELECTRIC CORP—
05/14/2024Permit IssuedOMD ELECTRICAL CORPGeneral Wiring
05/04/2022CompleteRJ ELECTRICAL CONTRACTORSGeneral Wiring
04/11/2022Permit IssuedCONTACT PLUS ELEC'L CORPGeneral Wiring
06/11/2021CompleteUNITED ELEC'L CONT'G CORPGeneral Wiring
05/20/2020CompleteASTER ELECTRIC, INCGeneral Wiring
03/24/2020CompleteEASTERN ELEC'L TECHNOLOGIGeneral Wiring
05/13/2019CompleteTOP SHELF ELECTRIC CORPGeneral Wiring
10/17/2018CompleteTOP SHELF ELECTRIC CORP—
08/06/2018CompleteTOP SHELF ELECTRIC CORP205 meters, 3 new_meters
1 job · most recent 08/01/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/01/2026Permit IssuedPLATINUM SERVICES NY LLCScaffold, Sidewalk Shed
1 job · most recent 07/09/2026
FiledStatusContractorScope
07/09/2026Permit IssuedSTRUCTUAL PRESV SYSTEM—
Building Lifecycle
All (300)Filed (46)Permit Issued (47)Signed Off (26)Violation (49)Inspection (24)Objection (78)Special Inspection (30)
08/05/2026
Permit issued — General Construction
B01366762-I1-GC
08/03/2026
Permit issued — Supported Scaffold
B01437869-I1-SF
08/03/2026
Permit issued — Supported Scaffold
B01437869-I1-SH
08/03/2026
Violation issued (HPD, open)
B
08/03/2026
Violation issued (HPD, open)
B
08/03/2026
Violation issued (HPD, open)
B
08/01/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. SIDEWALK SHED AND PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01437869-I1
07/24/2026
Violation issued (HPD, open)
A
07/24/2026
Violation issued (HPD, open)
A
07/24/2026
Violation issued (HPD, open)
A
07/23/2026
Permit issued — Suspended Scaffold
B01426961-I1-SC
07/09/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
B01426961-I1
06/17/2026
Signed off — Alteration
B01297421-I1
06/03/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/01/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/29/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/28/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/26/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/21/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/01/2026
Permit issued — Mechanical Systems
B01153360-I1-MS
05/01/2026
Permit issued — General Construction
B01156717-I1-GC
04/17/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/01/2026
Objection resolved — Addressed
04/01/2026
Objection resolved — Addressed
03/30/2026
Permit issued — Mechanical Systems
B01292873-I1-MS
03/30/2026
Permit issued — General Construction
B01292872-I1-GC
03/30/2026
Objection raised — Scope
03/30/2026
Objection raised — Structural
03/23/2026
Filed — Alteration
HEREBY FILING FACADES REPAIRS AS PER PLANS FILED HEREWITH.
B01366762-I1
03/23/2026
Violation issued (HPD, closed)
C
03/09/2026
Permit issued — Plumbing
B01153415-I1-PL
03/06/2026
Permit issued — General Construction
B01156717-I1-GC
03/06/2026
Permit issued — Sprinklers
B01153416-I1-EW-SP
03/03/2026
Special inspection requirement — Final
Andrew Houston
03/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
Andrew Houston
03/03/2026
Special inspection requirement — Masonry
Andrew Houston
02/06/2026
Objection raised — Cost
02/06/2026
Objection resolved — Addressed
01/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
XIU CHEN
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
01/13/2026
Filed — Alteration
INTERIOR ALTERATION WITHIN EXISTING TENANT SPACE ON 1ST FLOOR IN EXISTING BUILDING: INSTALL NEW PLUMBING FIXTURES PER NEW LAYOUT. INSTALL NEW SECONDARY BACK FLOW PREVENTER FOR MEDICAL OFFICE. NO CHANGE TO OCCUPANCY, GROUP AND USE.
B01292874-P1
01/09/2026
Permit issued — Sprinklers
B01292875-I1-EW-SP
01/08/2026
Objection resolved — Addressed
12/16/2025
Special inspection requirement — Lighting controls
PING MAN HO
12/11/2025
Permit issued — Plumbing
B01292874-I1-PL
11/03/2025
Permit issued — Mechanical Systems
B01292873-I1-MS
11/03/2025
Permit issued — General Construction
B01292872-I1-GC
10/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/20/2025
Permit issued — Suspended Scaffold
B01297421-I1-SC
10/15/2025
Filed — Alteration
B01297421-I1
10/08/2025
Violation issued (FDNY_NOV, closed)
10/08/2025
Violation issued (FDNY_NOV, closed)
10/08/2025
Violation issued (FDNY_NOV, closed)
10/07/2025
Filed — Alteration
B01292873-I1
10/05/2025
Filed — Alteration
INTERIOR ALTERATION WITHIN EXISTING TENANT SPACE ON 1ST FLOOR IN EXISTING BUILDING: INSTALL NEW PLUMBING FIXTURES PER NEW LAYOUT. INSTALL NEW SECONDARY BACK FLOW PREVENTER FOR MEDICAL OFFICE. NO CHANGE TO OCCUPANCY, GROUP AND USE.
B01292874-I1
10/05/2025
Filed — Alteration
B01292875-I1
Latest 60 of 300 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STELLAR MANAGEMENT9309/13/2026
PLATINUM SERVICES NY208/04/2026
ROCK GROUP NY803/21/2026
MCGUINNESS DEVELOPMENT LLC903/21/2026
MCGUINNESS REALTY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.4003/21/2026
TAG TEAM GROUP403/21/2026
LOUIS STRIAR203/21/2026
G DESIGN DRAFTING1803/21/2026
GENE KAUFMAN ARCHITECT103/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
ATELIER NEW YORK ARCHITECTURE303/21/2026
RIGHT WAY SERVICES NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IDDC LLCGeneral Contractor907/08/2026
BRITT REALTY LLCGeneral Contractor907/08/2026
BEACON CONSTRUCTION SERVGeneral Contractor704/09/2026
DVE CONSTRUCTION INCGeneral Contractor607/08/2026
AK PREMIER CONTRACTINGGeneral Contractor303/21/2026
THE HARVEY GROUP LLCGeneral Contractor303/21/2026
PROTO P & H SERVICES CORPPlumbing307/08/2026
VERTEX P & H CORPPlumbing307/08/2026
A & F FIRE PROTECTION COFire Protection207/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor208/04/2026
RRP PLUMBING CORPPlumbing207/08/2026
TRUE NORTH MECHANICAL LLCPlumbing107/08/2026
CONTACT PLUS ELEC'L CORPElectrical103/22/2026
CITY SIGNSScaffold107/08/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
EXPERT FIRE SPRINKLER,LLCFire Protection107/08/2026
RRP PLUMBING CORPFire Protection107/08/2026
WHITESTONE PLUMBING CORPFire Protection107/08/2026
CONCEPT AIR CONDITIONINGGeneral Contractor107/08/2026
STRUCTURAL PRESERV SYSTEMGeneral Contractor108/06/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
CAPE PLUMBING INCPlumbing107/08/2026
LG ELITE PLUMBING INCPlumbing107/08/2026
MEJ PLUMBING LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NYC FACADE ARCHITECTURE9035103/23/2026
XC ENGINEERING PC9405801/13/2026
RAYMOND HO ARCHITECT, PLL1654105/23/2025
SY ENGINEERING PLLC5149101/06/2025
ARCHITECTURAL ENGINEERING6111101/25/2024
ATELIER NY ARCHITECTURE2438301/25/2024
RYAN SPECIAL ENGINEERING2018106/14/2022
LU NING ARCHITECTURE, PLL1155405/26/2022
PSI AGENCY INC.254711/04/2021
QUALITY TESTING, LLC7344609/14/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURAL PRESERV SYSTEM08/05/2026
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC08/03/2026
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC08/03/2026
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTUAL PRESV SYSTEM07/23/2026
DOB NOWMechanical SystemsPermit IssuedDVE CONSTRUCTION INC05/01/2026
DOB NOWGeneral ConstructionPermit IssuedDVE CONSTRUCTION INC05/01/2026
DOB NOWMechanical SystemsPermit IssuedBEACON CONSTRUCTION SERV03/30/2026
DOB NOWGeneral ConstructionSigned-offBEACON CONSTRUCTION SERV03/30/2026
DOB NOWPlumbingPermit IssuedRRP PLUMBING CORP03/09/2026
DOB NOWGeneral ConstructionPermit IssuedDVE CONSTRUCTION INC03/06/2026
DOB NOWSprinklersPermit IssuedRALPH W. LANDOLFI JR.03/06/2026
DOB NOWSprinklersPermit IssuedAMERICAN STANDARD PLUMBIN01/09/2026
DOB NOWPlumbingSigned-offVERTEX P & H CORP12/11/2025
DOB NOWMechanical SystemsPermit IssuedBEACON CONSTRUCTION SERV11/03/2025
DOB NOWGeneral ConstructionSigned-offBEACON CONSTRUCTION SERV11/03/2025
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM10/20/2025
DOB NOWMechanical SystemsPermit IssuedAK PREMIER CONTRACTORS03/18/2025
DOB NOWMechanical SystemsPermit IssuedDVE CONSTRUCTION INC03/07/2025
DOB NOWPlumbingPermit IssuedRRP PLUMBING CORP03/06/2025
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC05/14/2024
DOB NOWGeneral ConstructionPermit IssuedTHE HARVEY GROUP LLC11/09/2023
DOB NOWMechanical SystemsSigned-offCONCEPT AIR CONDITIONING04/26/2023
DOB NOWSprinklersSigned-offTEMPERINI MECHANICAL INC03/09/2022
DOB NOWPlumbingSigned-offLG ELITE PLUMBING INC02/11/2022
DOB NOWGeneral ConstructionSigned-offBEACON CONSTRUCTION SERV01/20/2022
DOB NOWPlumbingSigned-offKAY PLUMBING INC11/17/2021
DOB NOWGeneral ConstructionSigned-offBRITT REALTY LLC11/12/2021
DOB NOWMechanical SystemsSigned-offBRITT REALTY LLC11/10/2021
DOB NOWMechanical SystemsSigned-offIDDC LLC09/10/2021
DOB NOWGeneral ConstructionSigned-offIDDC LLC09/08/2021
DOB NOWGeneral ConstructionSigned-offIDDC LLC08/26/2021
DOB NOWMechanical SystemsSigned-offIDDC LLC06/04/2021
DOB NOWPlumbingSigned-offTRUE NORTH MECHANICAL LLC05/14/2021
DOB NOWGeneral ConstructionSigned-offIDDC LLC03/25/2021
DOB NOWSprinklersSigned-offEXPERT FIRE SPRINKLER,LLC09/10/2020
DOB NOWPlumbingSigned-offCAPE PLUMBING INC08/30/2020
DOB NOWSignSigned-offELMER DAWSON06/29/2020
DOB NOWMechanical SystemsSigned-offBRITT REALTY LLC03/30/2020
DOB NOWPlumbingSigned-offPROTO P & H SERVICES CORP03/26/2020
DOB NOWConstruction FenceSigned-offBRITT REALTY LLC03/18/2020
+ 57 more permits on file
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
06/03/2026Pass-Final PL - UndergroundPassView ↗
06/01/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/29/2026Pass-Final PL - UndergroundPassView ↗
05/28/2026Pass-Final General Construction Non-Directive 14PassView ↗
05/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/21/2026Pass-Final PL - UndergroundPassView ↗
04/17/2026Pass-Final PL - UndergroundPassView ↗
04/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/17/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/17/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
05/17/2022Pass-Final General Construction Non-Directive 14PassView ↗
05/16/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/10/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/03/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/01/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/01/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/19/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
03/03/2026FinalAndrew Houstonprogress
03/03/2026MasonryAndrew Houstonspecial
03/03/2026Tenant Protection Plan ComplianceAndrew Houstonspecial
01/22/2026Fire-Resistant Penetrations and JointsXIU CHENspecial
01/22/2026Tenant Protection Plan ComplianceXIU CHENspecial
12/16/2025Lighting controlsPING MAN HOenergy_progress
05/19/2025Tenant Protection Plan Compliance—special
05/15/2025Interior lighting powerPING MAN HOenergy_progress
05/12/2025Fire-Resistant Penetrations and JointsPING MAN HOspecial
12/17/2024Tenant Protection Plan ComplianceXIU CHENspecial
12/17/2024Energy Code Compliance InspectionsXIU CHENprogress
12/17/2024Tenant Protection Plan ComplianceXIU CHENspecial
12/17/2024Fire-Resistant Penetrations and JointsXIU CHENspecial
12/17/2024Lighting controlsSUNGBOM YIenergy_progress
12/17/2024Interior lighting powerSUNGBOM YIenergy_progress
12/17/2024Energy Code Compliance InspectionsSUNGBOM YIprogress
12/17/2024Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
12/17/2024Fire-Resistant Penetrations and JointsXIU CHENspecial
12/17/2024Heating SystemsXIU CHENspecial
12/17/2024HVAC-R and service water piping design and insulationXIU CHENenergy_progress
12/17/2024HVAC-R and service water heating equipmentXIU CHENenergy_progress
12/17/2024Maintenance informationXIU CHENenergy_progress
12/17/2024Duct leakage testing, insulation and designXIU CHENenergy_progress
12/17/2024HVAC-R and service water heating system controlsXIU CHENenergy_progress
12/17/2024Shutoff dampersXIU CHENenergy_progress
Latest 25 of 71.
▾Documents — 845 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch30
09/01/2026B00512932-I1Request digital key ↗
09/01/2026B00512050-I1Request digital key ↗
09/01/2026B00574641-I1Request digital key ↗
Showing 3 of 30 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00236584-I1Request digital key ↗
09/02/2026B00265210-I1Request digital key ↗
09/02/2026B00322646-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/02/2026B00243983-I1Request digital key ↗
09/02/2026B00265182-I1Request digital key ↗
09/02/2026B00299343-S3Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/02/2026B00236512-I1Request digital key ↗
09/02/2026B00264577-I1Request digital key ↗
09/02/2026B00322699-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00275776-I1Request digital key ↗
09/02/2026B00327829-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00469151-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/02/2026B00348282-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
09/02/2026B00183312-I1Request digital key ↗
▸Applications & Permits141
▸BISPLAN / WORK APPROVAL APPLICATION84
01/28/2021320627256Open ↗
01/26/2021320627256Open ↗
01/22/2021320627256Open ↗
Showing 3 of 84 on file for this type
▸BISWORK PERMIT APPLICATION41
07/21/2020340731989Open ↗
11/19/2019322004889Open ↗
10/16/2019321998950Open ↗
Showing 3 of 41 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISBPP-15 - Application for waiver of Builders pavement requirements2
12/06/2019320627256Open ↗
Showing 1 of 2 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUEST FOR CERTIFICATE OF OCCUPANCY WITH OPEN APPLICATION(S)1
03/05/2021320627256Open ↗
▸Zoning, Tax Lot & Property Records14
▸BISZONING DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
02/24/2021320627256Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
01/13/2021320627256Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/13/2021320627256Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01224135-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 21
08/13/2026B01153360-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 31
08/13/2026B01153360-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 11
08/13/2026B01153360-I1Open ↗
▸Seals & Professional Certifications177
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION44
12/18/2020320627256Open ↗
12/18/2020320627256Open ↗
11/19/2019322004889Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature44
09/01/2026B00469151-I1Open ↗
09/01/2026B00512932-I1Open ↗
09/01/2026B00512050-I1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/01/2026B00611744-P1Open ↗
09/01/2026B00611744-P1Open ↗
09/01/2026B00611744-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/01/2026B00611744-P1Open ↗
09/01/2026B00611744-I1Open ↗
09/01/2026B00578976-S1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
07/20/2020340731989Open ↗
11/19/2019322004889Open ↗
10/15/2019321998950Open ↗
Showing 3 of 13 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION11
07/20/2020340731989Open ↗
Showing 1 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY11
07/20/2020340731989Open ↗
Showing 1 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/19/2019322004889Open ↗
10/15/2019321998950Open ↗
▸Trade Schedules & Equipment51
▸BISSCHEDULE B - PLUMBING17
06/22/2020340207181Open ↗
03/31/2020320627256Open ↗
03/17/2020320627256Open ↗
Showing 3 of 17 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT15
04/07/2021320627256Open ↗
12/23/2020320627256Open ↗
03/05/2020320627256Open ↗
Showing 3 of 15 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS4
04/07/2021320627256Open ↗
04/07/2021320627256Open ↗
12/23/2020320627256Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection17
▸DOB NOWTenant Protection Plan9
08/13/2026B00322646-I1Open ↗
08/13/2026B00236584-I1Open ↗
08/13/2026B00265182-I1Open ↗
Showing 3 of 9 on file for this type
▸BISSTREET TREE CHECKLIST5
07/21/2021320627256Open ↗
02/11/2021320627256Open ↗
Showing 2 of 5 on file for this type
▸BISTenant Protection Plan and Notes2
11/19/2019322004889Open ↗
10/15/2019321998950Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B01224135-I1Open ↗
▸Environmental & Asbestos19
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISOER NNO FOR TCO1
01/14/2021320627256Open ↗
▸Energy Compliance35
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY13
01/28/2021321998950Open ↗
01/28/2021321998950Open ↗
01/12/2021320627256Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
11/19/2019322004889Open ↗
11/19/2019322004889Open ↗
10/15/2019321998950Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.8
08/13/2026B00622854-I1Open ↗
08/13/2026B00611726-I1Open ↗
08/13/2026B00512050-I1Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
01/15/2021321998950Open ↗
12/15/2020340731989Open ↗
10/09/2020322004889Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports65
▸BISTECHNICAL REPORT: RESPONSIBILITY40
02/01/2021320627256Open ↗
01/28/2021321998950Open ↗
01/28/2021321998950Open ↗
Showing 3 of 40 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSOIL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs100
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST35
02/12/2021320627256Open ↗
01/28/2021321998950Open ↗
12/28/2020320627256Open ↗
Showing 3 of 35 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE30
01/28/2021320627256Open ↗
01/26/2021320627256Open ↗
01/22/2021320627256Open ↗
Showing 3 of 30 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION28
09/04/2020340207181Open ↗
11/14/2019320627256Open ↗
11/14/2019320627256Open ↗
Showing 3 of 28 on file for this type
▸BISFA LETTER OF DEFECT : FD-FALD5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT17
01/15/2021321998950Open ↗
12/15/2020340731989Open ↗
10/09/2020322004889Open ↗
Showing 3 of 17 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸Filing & Intake Forms118
▸BISADDITIONAL INFORMATION63
02/01/2021320627256Open ↗
02/01/2021320627256Open ↗
01/14/2021320627256Open ↗
Showing 3 of 63 on file for this type
▸BISBOROUGH INTAKE FORM31
02/27/2020320627256Open ↗
01/10/2020340207519Open ↗
01/10/2020340581365Open ↗
Showing 3 of 31 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET16
07/20/2020340731989Open ↗
Showing 1 of 16 on file for this type
▸BISEFILING COVER SHEET7
11/19/2019322004889Open ↗
10/15/2019321998950Open ↗
Showing 2 of 7 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents18
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
07/21/2021320627256Open ↗
02/24/2021320627256Open ↗
07/24/2020320627256Open ↗
Showing 3 of 10 on file for this type
▸BISTCO - Supporting Documents3
07/16/2021320627256Open ↗
02/12/2021320627256Open ↗
01/08/2021320627256Open ↗
▸BISHPD: INCLUSIONARY HOUSING ELIG. CERT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENVIRONMENTAL "E" DEP NOTICE OF SATISFACTION1
10/16/2019321998950Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProperty Ownership Certification1
08/13/2026B01224135-I1Open ↗
▸DOB NOWIRA Certification1
08/13/2026B01297421-I1Open ↗