← Back
Elevator apt, luxury type
211 NORTH END AVENUE
MANHATTAN · BIN 1086547
💬 Discuss this project
2004Year Built
24Stories
D8Building Class
BPCZoning
283,905 sfGross Floor Area
256Units
LL97 CoveredRent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator apt, luxury type · Owner of record: CITIZENS ICON HOLDINGS, LLC · 14,451 sf lot · 19.65 FAR built · Flood zone X500
Locations of Work
MechanicalPlumbing
Bulkhead8p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CELTIC SYSTEMS CO NY407/08/2026
ALBANESE DEVELOPMENT1004/09/2026
C O ROSE ASSOCIATES503/22/2026
CITIZENS ICON HOLDINGS, LLC103/22/2026
TO THE OWNER OF103/22/2026
TURNER CONSTRUCTION CO103/22/2026
TURNER CONSTN CO103/22/2026
NORTH END ASSOCIATES3403/21/2026
NORTH END AVE ASSOCIATES203/21/2026
BATTER PARK CITY AUTHORITY403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RLM ENGINEERING PLLC312/03/2025
ASHRAF CORP206/10/2025
MJE PROFESSIONAL SERVICES104/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN203/21/2026
SKYLINE ACCESS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DUAL FUEL PLUBING & HTINGPlumbing307/08/2026
EMCOR SERVICES NY/NJ INCGeneral Contractor204/09/2026
CELTIC SYSTEMS CO NY INCGeneral Contractor107/08/2026
PHOENIX SUTTON STR INCGeneral Contractor104/09/2026
SUN MECHANICAL CORPPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE843312/03/2025
Building Lifecycle
All (90)Filed (7)Permit Issued (6)Signed Off (4)Facade (FISP) (12)Violation (45)Inspection (4)Special Inspection (12)
07/01/2026
Violation issued (ECB, open)
Elevators
03/23/2026
Signed off — Alteration
Replacing existing two gas fired absorption chillers on the roof, temporary installation of chiller, new heat exchanger and removal of microturbine with related piping as per plans filed herewith.
M01220914-S1
03/05/2026
Signed off — Alteration
Replacing existing two gas fired absorption chillers on the roof, temporary installation of chiller, new heat exchanger and removal of microturbine with related piping as per plans filed herewith.
M01220914-I1
12/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/03/2025
Filed — Alteration
Replacing existing two gas fired absorption chillers on the roof, temporary installation of chiller, new heat exchanger and removal of microturbine with related piping as per plans filed herewith.
M01220914-P1
12/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOHN MCMONAGLE
12/03/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
11/13/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01233690-I1
10/31/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/06/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/29/2025
Permit issued — Mechanical Systems
M01220914-I1-MS
06/25/2025
Permit issued — Plumbing
M01220914-S1-PL
06/17/2025
Permit issued — Mechanical Systems
M01220914-I1-MS
06/10/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01233690-P1
06/03/2025
Permit issued — Sidewalk Shed
M01233690-I1-SH
06/02/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01214410-I1
05/30/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01233690-I1
05/15/2025
Filed — Alteration
Replacing existing two gas fired absorption chillers on the roof, temporary installation of chiller, new heat exchanger and removal of microturbine with related piping as per plans filed herewith.
M01220914-S1
05/15/2025
Filed — Alteration
Replacing existing two gas fired absorption chillers on the roof, temporary installation of chiller, new heat exchanger and removal of microturbine with related piping as per plans filed herewith.
M01220914-I1
05/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
05/05/2025
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
05/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOHN MCMONAGLE
05/05/2025
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
05/05/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
05/05/2025
Special inspection requirement — Final
JOHN MCMONAGLE
05/05/2025
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
05/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
05/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
05/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
04/25/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01214410-I1
04/25/2025
Permit issued — Sidewalk Shed
M01214410-I1-SH
03/28/2025
Cycle 10 facade report signed — SAFE
03/11/2025
Cycle 10 facade report submitted
02/13/2025
Permit issued — Suspended Scaffold
M01126749-I1-SC
02/05/2025
Cycle 10 facade inspection completed
10/29/2024
Filed — Alteration
M01126749-I1
02/10/2022
Cycle 9 facade report submitted
01/29/2022
Cycle 9 facade report signed — SWARMP
12/13/2021
Cycle 9 facade inspection completed
03/07/2021
Violation issued (HPD, closed)
B
03/07/2021
Violation issued (HPD, closed)
A
03/07/2021
Violation issued (HPD, closed)
B
03/07/2021
Violation issued (HPD, closed)
B
03/07/2021
Violation issued (HPD, closed)
A
03/07/2021
Violation issued (HPD, closed)
A
03/07/2021
Violation issued (HPD, closed)
A
03/07/2021
Violation issued (HPD, closed)
A
03/07/2021
Violation issued (HPD, closed)
A
03/07/2021
Violation issued (HPD, closed)
A
03/07/2021
Violation issued (HPD, closed)
B
02/10/2021
Violation issued (HPD, closed)
B
11/10/2020
Violation issued (HPD, closed)
A
11/10/2020
Violation issued (HPD, closed)
A
11/10/2020
Violation issued (HPD, closed)
A
11/10/2020
Violation issued (HPD, closed)
B
11/10/2020
Violation issued (HPD, closed)
B
11/01/2018
Violation issued (HPD, closed)
B
11/01/2018
Violation issued (HPD, closed)
A
11/01/2018
Violation issued (HPD, closed)
A
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offEMCOR SERVICES NY/NJ INC09/29/2025
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING06/25/2025
DOB NOWMechanical SystemsSigned-offEMCOR SERVICES NY/NJ INC06/17/2025
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC06/03/2025
DOB NOWSidewalk ShedSigned-offCELTIC SYSTEMS CO NY INC04/25/2025
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC02/13/2025
BISEQISSUEDSTAR-CEL WATERPROOFING04/20/2016
BISEQISSUEDEVEREST SCAFFOLDING INC02/16/2016
BISPLISSUEDLIBERTY MECHANICAL CONT04/10/2006
BISOTISSUEDTURNER CONSTRUCTION COMPANY01/11/2006
BISMHISSUEDTURNER CONSTRUCTION COMPANY01/11/2006
BISSPISSUEDFIRST WOMEN'S FIRE SYS CR12/22/2005
BISSDISSUEDFIRST WOMEN'S FIRE SYS CR12/19/2005
BISBLISSUEDA.L. EASTMAN CO11/28/2005
BIS—ISSUEDTURNER CONSTRUCTION COMPANY11/16/2005
BISFSISSUEDAL EAST MAN CO11/04/2005
BISOTISSUEDTURNER CONSTRUCTION COMPANY07/26/2005
BISMHISSUEDTURNER CONSTRUCTION COMPANY07/26/2005
BISEQISSUEDATLANTIC HEYDT CORP.05/31/2005
BISEQISSUEDATLANTIC HEYDT CORP02/04/2005
BISEQISSUEDUNITED HOISTING CORP01/28/2005
BIS—ISSUEDTURNER CONSTRUCTION COMPANY01/11/2005
BISEQISSUEDTURNER CONSTRUCTION COMPANY12/29/2004
BISSPISSUEDFIRST WOMEN'S FIRE SYS CR11/03/2004
BISPLISSUEDLIBERTY MECHANICAL CONT07/12/2004
BISEQISSUEDTURNER CONSTRUCTION COMPANY04/12/2004
BISOTISSUEDTURNER CONSTRUCTION COMPANY04/12/2004
BISPLISSUEDRICHARDS PLBG & HTG CO,INC01/23/2004
BISOTISSUEDLODUCA ASSOCIATES INC01/20/2004
2 projects · most recent 05/31/2025
FiledStatusContractorScope
05/31/2025CompleteRICHARD NEU—
06/03/2024CompleteTRIZA ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
12/03/2025Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
12/03/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
05/05/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
05/05/2025Heating SystemsJOHN MCMONAGLEspecial
05/05/2025Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
05/05/2025Mechanical SystemsJOHN MCMONAGLEspecial
05/05/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
05/05/2025FinalJOHN MCMONAGLEprogress
05/05/2025Maintenance informationJOHN MCMONAGLEenergy_progress
05/05/2025HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
05/05/2025HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
05/05/2025HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026M01126749-I1Request digital key ↗
08/24/2026M01214410-I1Request digital key ↗
08/23/2026M01220914-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION5
11/29/2019123902704Open ↗
05/13/2019123902704Open ↗
04/15/2016140483448Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION2
04/15/2016140483448Open ↗
02/15/2016140459082Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature7
08/27/2026M01220914-S1Open ↗
08/25/2026M01220914-I1Open ↗
08/25/2026M01220914-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026M01214410-I1Open ↗
08/23/2026M01220914-I1Open ↗
08/23/2026M01220914-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/27/2026M01220914-S1Open ↗
08/25/2026M01220914-I1Open ↗
08/25/2026M01220914-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
04/15/2016140483448Open ↗
02/15/2016140459082Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/17/2017140459082Open ↗
03/29/2017140459082Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/15/2016140483448Open ↗
02/15/2016140459082Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/15/2016140483448Open ↗
02/15/2016140459082Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
02/16/2016140459082Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
12/01/2008110415863Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M01220914-S1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/15/2016140483448Open ↗
02/15/2016140459082Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
04/15/2016140483448Open ↗
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026M01214410-I1Open ↗
08/13/2026M01233690-I1Open ↗
08/13/2026M01233690-P1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/10/2009110415863Open ↗
12/01/2008110415863Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/17/2017140459082Open ↗
03/29/2017140459082Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/01/2008110415863Open ↗
▸Cost, Insurance & Ownership1
▸BISDEPT OF FINANCE VERIFICATION1
05/13/2019123902704Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET2
04/15/2016140483448Open ↗
02/15/2016140459082Open ↗
▸BISBOROUGH INTAKE FORM1
11/29/2019123902704Open ↗
▸BISEFILING COVER SHEET1
05/13/2019123902704Open ↗
▸Other Documents1
▸DOB NOWIRA Certification1
08/13/2026M01126749-I1Open ↗