← Back
BuildNYC
Elevator apt, luxury type
The Verdesian
211 NORTH END AVENUE · BIN 1086547
💬 Discuss this project
2004Year Built
24Stories
D8Building Class
BPCZoning
283,905 sfGross Floor Area
256Units
LL97 CoveredRent Stabilized1 Active Violation 0 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator apt, luxury type · Owner of record: Citizens Icon Holdings · 14,451 sf lot · 19.65 FAR built · Flood zone X500
Locations of Work
StructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAlbanese Development CORP11p · 1 filing · 19 docs
BulkheadAlbanese Development CORP8p · 1 filing · 19 docs
Floor 1Heavy duty sidewalk shed installation5p · 1 filing · 3 docs
Site & exteriorProposed Heavy Duty Sidewalk Shed6p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
North End Associates3603/21/2026
Batter Park City Authority403/21/2026
Citizens Icon Holdings103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RLM Engineering312/03/2025
Ashraf206/10/2025
Mje Professional Services104/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR Expediting Design203/21/2026
Skyline Access103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dual Fuel Plumbing & HeatingPlumbing307/08/2026
Emcor Services NY/NJGeneral Contractor204/09/2026
Celtic Systems Co NYScaffold107/08/2026
Phoenix Sutton STRScaffold104/09/2026
Sun MechanicalPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service843312/03/2025
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 10, sub-cycle A)
The filing window opened 02/21/2025. 1 Cycle 10 filing on record, latest 03/11/2025, status Swarmp
09/24/2026
Elevator Category 1 inspection report filed
07/01/2026
5/l/10 car cease use class 1, car door restrictor defective repair
ECB violation · open
03/23/2026
Signed off — Alteration
Replacing existing two gas fired absorption chillers on the roof, temporary installation of chiller, new heat exchanger and removal of microturbine with related piping as per plans filed herewith.
M01220914-S1
03/05/2026
Signed off — Alteration
Replacing existing two gas fired absorption chillers on the roof, temporary installation of chiller, new heat exchanger and removal of microturbine with related piping as per plans filed herewith.
M01220914-I1
97 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offEmcor Services NY/NJ09/29/2025
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating06/25/2025
DOB NOWMechanical SystemsSigned-offEmcor Services NY/NJ06/17/2025
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR06/03/2025
DOB NOWSidewalk ShedSigned-offCeltic Systems Co NY04/25/2025
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration02/13/2025
BISEQISSUEDStar-Cel Waterproofing04/20/2016
BISEQISSUEDEverest Scaffolding02/16/2016
BISPLISSUEDLiberty Mechanical04/10/2006
BISOTISSUEDTurner Construction Company01/11/2006
BISMHISSUEDTurner Construction Company01/11/2006
BISSPISSUEDFirst Women's Fire Systems CR12/22/2005
BISSDISSUEDFirst Women's Fire Systems CR12/19/2005
BISBLISSUEDA.L. Eastman11/28/2005
BIS—ISSUEDTurner Construction Company11/16/2005
BISFSISSUEDAL East Man11/04/2005
BISOTISSUEDTurner Construction Company07/26/2005
BISMHISSUEDTurner Construction Company07/26/2005
BISEQISSUEDAtlantic Heydt05/31/2005
BISEQISSUEDAtlantic Heydt02/04/2005
BISEQISSUEDUnited Hoisting01/28/2005
BIS—ISSUEDTurner Construction Company01/11/2005
BISEQISSUEDTurner Construction Company12/29/2004
BISSPISSUEDFirst Women's Fire Systems CR11/03/2004
BISPLISSUEDLiberty Mechanical07/12/2004
BISEQISSUEDTurner Construction Company04/12/2004
BISOTISSUEDTurner Construction Company04/12/2004
BISPLISSUEDRichards Plumbing & Heating01/23/2004
BISOTISSUEDLoduca Associates01/20/2004
2 projects · most recent 05/31/2025
FiledStatusContractorScope
05/31/2025CompleteRichard Neu—
06/03/2024CompleteTriza Electrical—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
12/03/2025Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
12/03/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
05/05/2025Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
05/05/2025Mechanical SystemsJOHN MCMONAGLEspecial
05/05/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
05/05/2025FinalJOHN MCMONAGLEprogress
05/05/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
05/05/2025HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
05/05/2025HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
05/05/2025HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
05/05/2025Maintenance informationJOHN MCMONAGLEenergy_progress
05/05/2025Heating SystemsJOHN MCMONAGLEspecial
60 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account