← Back
BuildNYC
Two family frame
211 RENSSELAER AVENUE
STATEN ISLAND · BIN 5125338
💬 Discuss this project
1997Year Built
2Stories
B2Building Class
R3XZoning
—Gross Floor Area
2Units
0 Active Violations
Two family frame · 0.63 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofProposed Photovoltaic Power SystemUnder Construction1 filing · 5 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Green River Environmental Engineering110/05/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSSGeneral Contractor110/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Green River Environmental7841110/05/2026
Building Lifecycle
10/06/2026
Permit issued — Solar
S01468637-I1-SL
10/05/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
S01468637-I1
10/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
10/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
10/01/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
10 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedNYSS10/06/2026
BIS—ISSUEDAmerican Streamline Construction02/20/1997
BIS—ISSUEDAmerican Streamline Construction10/01/1996
1 project · most recent 10/05/2026
FiledStatusContractorScope
10/05/2026Permit IssuedNY Solar Electrical—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/01/2026Fire-Resistant Penetrations and JointsROBERT MASONEspecial
10/01/2026Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
10/01/2026Energy Code Compliance InspectionsROBERT MASONEprogress
10/01/2026FinalROBERT MASONEprogress
10/01/2026Air barrier - visual inspectionROBERT MASONEenergy_progress
5 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account