← Back
BuildNYC
Walk-up cooperative
211 WEST 10TH STREET
MANHATTAN · West Village · BIN 1011223
💬 Discuss this project
1920Year Built
6Stories
C6Building Class
C1-6Zoning
18,126 sfGross Floor Area
24Units
Rent Stabilized0 Active Violations
Walk-up cooperative · Owner of record: W 10 St Holding · 4,349 sf lot · 4.17 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 5 docs
Floor 6Unit 6D1 filing · 5 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorPowers Bridging Sidewalk Shed Installation4p · 1 filing · 2 docs
Filed — no permit issuedScrape and paint cornice3p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
West Tenth Street HDFC1008/28/2026
211 West 10 St203/21/2026
W 10 St Holding103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
David Chagnon Architectural Design208/24/2026
Paul Perdek, Prof. Engineering104/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Preemptive Solutions & Consulting203/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Powers Bridging & ScaffoldingScaffold203/21/2026
Optimal ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
McDonough Engineering Pra9377108/24/2026
Building Lifecycle
All (24)Filed (3)Permit Issued (1)Violation (9)Objection (4)Special Inspection (7)
09/01/2026
Objection resolved — Addressed
09/01/2026
Objection resolved — Addressed
08/26/2026
Objection raised — Other
08/26/2026
Objection raised — Scope
08/24/2026
Filed — Alteration
PROPOSED INSTALLATION OF SPLIT-SYSTEM HVAC SYSTEM (AIR HANDLER AND ROOF CONDENSING UNIT). NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS
M01446669-I1
08/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/20/2026
Special inspection requirement — Heating Systems
08/17/2026
Special inspection requirement — Final
08/17/2026
Special inspection requirement — Mechanical Systems
11/15/2023
Violation issued (HPD, closed)
I
06/27/2022
Filed — Alteration
M00723089-I1
04/23/2022
Permit issued — Sidewalk Shed
M00722777-I1-SH
04/22/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00722777-I1
02/16/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
I
04/01/2021
Violation issued (HPD, closed)
A
03/09/2015
Violation issued (HPD, closed)
A
03/15/2010
Violation issued (ECB, closed)
Boilers
01/27/2010
Violation issued (ECB, closed)
Boilers
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPowers Bridging & Scaffol04/23/2022
BISOTISSUEDML12/08/2020
BISOTISSUEDML10/09/2020
BISPLISSUEDWynne Plumbing & Heating01/21/2016
BISPLISSUEDWF Plumbing and Heating10/26/2015
BISPLISSUEDSpeedway Plumbing05/28/2014
BISOTISSUEDTC Browne & Co05/02/2014
BISPLISSUEDWF Plumbing and Heating04/02/2014
BISOTISSUEDAmerican Quality Construction02/20/2014
BISOTISSUEDN/A09/20/2012
BISOTISSUEDIns Dynamics08/02/2012
BISOTISSUEDBasonas Construction07/20/2012
BISOTISSUEDAmerican Quality Construction07/26/2011
BISPLISSUEDAbr Plumbing & Heating Contracting06/07/2011
BISOTISSUEDAmerican Quality Construction06/03/2011
BISFBISSUEDEnvironmental Pro Mechanical12/24/2009
BISEQISSUEDYork Scaffold Equipment12/02/1997
BISEQISSUEDAmerican Scaffold10/25/1996
BISPLISSUEDNew York Standard Mechanical10/21/1996
BISOTISSUEDFPC Construction10/04/1996
1 project · most recent 08/24/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/24/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MLZ-KP18NA, MLZ-KP09NA, ML2-KP06NA 27,422 BTU · Fan Coil Indoor ×3
Mitsubishi Electric Trane HVAC US: City Multi VRF outdoor Unit MXZ-4d30NL, indoor. (1)MLZ-KX18NL CLG CASSETTE, (1)MLZ-KX09NL CLG CASSETTE AND MLZ-KX06NL CEILING CASSETTE. 28,400 BTU ×1
2 projects · most recent 10/07/2026
HVAC Wiring
FiledStatusContractorScope
10/07/2026Permit IssuedV-Tech ElectricalHVAC Wiring
04/29/2022CompleteOptimal Electric—
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
08/21/2026HVAC-R and service water heating system controls—energy_progress
08/21/2026HVAC-R and service water piping design and insulation—energy_progress
08/21/2026Fire-Resistant Penetrations and Joints—special
08/21/2026HVAC-R and service water heating equipment—energy_progress
08/20/2026Heating Systems—special
08/17/2026Final—progress
08/17/2026Mechanical Systems—special
▾Documents — 151 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/02/2026M00722777-I1Request digital key ↗
09/02/2026M00723089-I1Request digital key ↗
08/25/2026M01446669-I1Request digital key ↗
▸Applications & Permits29
▸BISWORK PERMIT APPLICATION15
10/09/2020140952725Open ↗
01/28/2016121144644Open ↗
11/10/2015121075415Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
09/24/2025120674378Open ↗
09/17/2020140952725Open ↗
04/28/2014121983666Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWLPC Approval/Permit3
09/10/2026M01446669-I1Open ↗
08/25/2026M01446669-I1Open ↗
08/13/2026M00723089-I1Open ↗
▸Seals & Professional Certifications22
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
04/25/2016121144644Open ↗
05/03/2014121983666Open ↗
04/28/2014121983666Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/02/2026M00723089-I1Open ↗
08/25/2026M01446669-I1Open ↗
08/13/2026M00722777-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/17/2020140952725Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/24/2009120230552Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/24/2009120230552Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/17/2020140952725Open ↗
▸Trade Schedules & Equipment11
▸BISSELF-CERT PLUMBING NOTICE5
11/27/2015121075415Open ↗
11/26/2014121983666Open ↗
06/30/2014121983666Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING4
07/10/2012121144644Open ↗
05/14/2012121075415Open ↗
04/11/2012121029751Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
12/24/2009120230552Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/28/2014121983666Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
09/17/2020140952725Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
09/17/2020140952725Open ↗
04/28/2014121983666Open ↗
07/10/2012121144644Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
05/14/2012121075415Open ↗
04/29/2011120674378Open ↗
12/24/2009120230552Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
07/25/2012121029751Open ↗
07/25/2012121029751Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/25/2026M01446669-I1Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
04/25/2016121144644Open ↗
10/01/2015121075415Open ↗
04/28/2014121983666Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
05/14/2012121075415Open ↗
06/08/2011120674378Open ↗
04/29/2011120674378Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
04/25/2016121144644Open ↗
10/01/2015121075415Open ↗
02/02/2015121983666Open ↗
▸BISTR8: Energy Code Progress Inspections2
08/30/2012121144644Open ↗
06/09/2011120674378Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/16/2025120674378Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/16/2025120674378Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
09/16/2025120674378Open ↗
04/16/2021140952725Open ↗
04/16/2021140952725Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs28
▸BISLANDMARKS APPROVAL10
10/02/2020140952725Open ↗
04/25/2016121144644Open ↗
10/01/2015121075415Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
09/24/2025120674378Open ↗
04/16/2021140952725Open ↗
04/25/2016121144644Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
07/10/2012121144644Open ↗
06/21/2012121119084Open ↗
05/14/2012121075415Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/02/2015121983666Open ↗
09/21/2012121144644Open ↗
09/21/2012121144644Open ↗
▸BISLANDMARKS SIGNOFF1
09/24/2025120674378Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT11
09/17/2020140952725Open ↗
04/25/2016121144644Open ↗
10/01/2015121075415Open ↗
Showing 3 of 11 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
05/06/2014121983666Open ↗
09/21/2012121144644Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
09/16/2025120674378Open ↗
04/16/2021140952725Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET7
04/28/2014121983666Open ↗
07/10/2012121144644Open ↗
06/21/2012121119084Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
09/17/2020140952725Open ↗
▸Other Documents2
▸BISSupporting Document: Fee Exempt1
09/21/2012121144644Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
04/11/2012121029751Open ↗