← Back
BuildNYC
Walk-up apt, over six families with stores
211 WEST 231ST STREET
BRONX · BIN 2112573
💬 Discuss this project
1927Year Built
6Stories
C7Building Class
R6Zoning
122,640 sfGross Floor Area
100Units
LL97 CoveredRent Stabilized117 Active Violations 1 old, status unconfirmed ▸
Walk-up apt, over six families with stores · Owner of record: 224 Realties · 22,248 sf lot · 5.51 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarReplace boiler and gas/oil burner4p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
224 Realties103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company201/13/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Supreme ElectricElectrical203/21/2026
Bonhomme GerbertElectrical103/21/2026
Bell Fuel OilPlumbing106/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851201/13/2026
Building Lifecycle
All (18)Filed (2)Permit Issued (2)Signed Off (2)Violation (6)Special Inspection (6)
07/31/2026
Signed off — Alteration
REPLACE BOILER AND GAS/OIL BURNER AND CHANGE GRADE OF FUE OIL FROM #4 TO #2.
X01343141-S1
07/31/2026
Signed off — Alteration
REPLACE BOILER AND GAS/OIL BURNER AND CHANGE GRADE OF FUE OIL FROM #4 TO #2.
X01343141-I1
01/29/2026
Permit issued — Plumbing
X01343141-S1-PL
01/28/2026
Permit issued — Boiler Equipment
X01343141-I1-BE
01/13/2026
Filed — Alteration
REPLACE BOILER AND GAS/OIL BURNER AND CHANGE GRADE OF FUE OIL FROM #4 TO #2.
X01343141-S1
01/13/2026
Filed — Alteration
REPLACE BOILER AND GAS/OIL BURNER AND CHANGE GRADE OF FUE OIL FROM #4 TO #2.
X01343141-I1
01/07/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
01/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
01/07/2026
Special inspection requirement — Maintenance information
LOUIS ARENA
01/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
01/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
01/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
05/31/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/15/2001
Violation issued (ECB, closed)
Plumbing
06/15/2001
Violation issued (ECB, closed)
Plumbing
06/15/2001
Violation issued (ECB, closed)
Plumbing
11/09/1992
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offApproved Energy01/29/2026
DOB NOWBoiler EquipmentSigned-offApproved Oil Co of Brooklyn01/28/2026
1 project · most recent 01/13/2026
Gas
FiledStatusContractorScope
01/13/2026Signed-offBell Fuel OilGas
1 project · most recent 01/13/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
01/13/2026Signed-offBell Fuel OilTenant Protection Plan 72 Hour
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
01/07/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
01/07/2026Tenant Protection Plan ComplianceLOUIS ARENAspecial
01/07/2026Maintenance informationLOUIS ARENAenergy_progress
01/07/2026HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
01/07/2026HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
01/07/2026HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026X01343141-S1Request digital key ↗
08/17/2026X01343141-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026X01343141-S1Open ↗
08/13/2026X01343141-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026X01343141-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026X01343141-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026X01343141-S1Open ↗
08/13/2026X01343141-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/17/2026X01343141-I1Open ↗