← Back
BuildNYC
Two family brick
211 WYCKOFF STREET
BROOKLYN · BIN 3005959
💬 Discuss this project
1870Year Built
2Stories
B1Building Class
R6BZoning
2,005 sfGross Floor Area
2Units
Two family brick · 1,667 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Olsen + Seiden townhouse renovation7p · 2 filings · 20 docs
CellarOlsen + Seiden townhouse renovation16p · 2 filings · 20 docs
BasementOlsen + Seiden townhouse renovation4p · 2 filings · 20 docs
Sub-BasementOlsen + Seiden townhouse renovation13p · 3 filings · 20 docs
Site & exteriorOlsen + Seiden townhouse renovation7p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Angie Hunsaker Architect605/07/2024
David Keane P.E205/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Big Orange Expediting1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
V & Roger ConstructionGeneral Contractor1007/08/2026
Aranda Plumbing & HeatingPlumbing207/08/2026
Brookyln SolarworksElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
David Keane PE2835501/18/2024
Alan Margolin & Associates423205/18/2023
Ivan Design Engineering6983205/18/2023
Building Lifecycle
02/26/2025
Signed off — Alteration
REPLACEMENT OF AN EXISTING SINGLE STORY ADDITION LOCATED AT THE REAR OF THE EXISTING MAIN BUILDING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B08005328-I1
01/30/2025
Signed off — Alteration
JOB FILED TO SHOW RECONFIGURATION OF EXISTING BASEMENT LEVEL KITCHEN, BATHROOM, DINING ROOM, RENOVATE EXISTING BASEMENT LEVEL REAR YARD ADDITION WALL, FLOOR ANDROOF FRAMING AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B08003181-I1
01/30/2025
Signed off — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B08003194-I1
12/09/2024
Signed off — Alteration
JOB FILED TO SHOW RECONFIGURATION OF EXISTING BASEMENT LEVEL KITCHEN, BATHROOM, DINING ROOM, RENOVATE EXISTING BASEMENT LEVEL REAR YARD ADDITION WALL, FLOOR ANDROOF FRAMING AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B08003181-S1
09/17/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
49 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offV & Roger Construction05/13/2024
DOB NOWPlumbingSigned-offAranda Plumbing & Heating01/04/2024
DOB NOWGeneral ConstructionSigned-offV & Roger Construction07/10/2023
DOB NOWStructuralSigned-offV & Roger Construction05/23/2023
DOB NOWPlumbingSigned-offAranda Plumbing & Heating04/11/2023
DOB NOWGeneral ConstructionSigned-offV & Roger Construction03/22/2023
BISOTISSUEDBrooklyn Solarworks10/15/2020
2 projects · most recent 07/27/2023
General Wiring
FiledStatusContractorScope
07/27/2023CompleteReal Power ElectricGeneral Wiring
10/23/2020CompleteBrookyln Solarworks—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/17/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/07/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
02/05/2024Structural Stability – Alterations of existing buildingsDAVID KEANEspecial
02/05/2024FinalANGIE HUNSAKERprogress
01/11/2024Structural Stability – Alterations of existing buildingsDAVID KEANEspecial
01/11/2024FinalANGIE HUNSAKERprogress
05/26/2023FinalDAVID KEANEprogress
05/26/2023Structural Steel - WeldingIvan Lukspecial
05/26/2023Footing and FoundationDAVID KEANEprogress
05/26/2023Structural Wood FrameDAVID KEANEprogress
05/26/2023Structural Stability – Alterations of existing buildingsDAVID KEANEspecial
05/26/2023Concrete - Cast-In-PlaceDAVID KEANEspecial
05/26/2023Structural Steel - High Strength BoltingDAVID KEANEspecial
05/26/2023Subgrade InspectionsYoung Suhspecial
05/26/2023Subsurface Investigations (Borings/Test Pits)Gregory Pillorispecial
05/26/2023Structural Cold-Formed SteelDAVID KEANEspecial
05/26/2023MasonryDAVID KEANEspecial
05/26/2023Post-installed AnchorsDAVID KEANEspecial
05/26/2023Structural Steel - DetailsDAVID KEANEspecial
05/13/2023Post-installed AnchorsDAVID KEANEspecial
05/13/2023FinalNathaniel Berganprogress
05/13/2023Structural Stability – Alterations of existing buildingsDAVID KEANEspecial
74 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account