← Back
BuildNYC
Two family frame
2117 BLACKROCK AVENUE
BRONX · Castle Hill-Unionport · BIN 2026410
💬 Discuss this project
1901Year Built
2Stories
B2Building Class
R5Zoning
1,986 sfGross Floor Area
2Units
Rent Stabilized0 Active Violations
Two family frame · Owner of record: 2117 Blackrock Realty · 7,725 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
Structural
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 21 filing · 14 docs
Floor 11 filing · 14 docs
Cellar1 filing · 14 docs
Filed — no permit issuedShoring and excavation4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Forest Associates803/21/2026
2117 Blackrock Realty403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Adnan Engineering111/10/2021
Gino O. Longo, Architect308/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Gino O Longo Architect203/21/2026
Building Lifecycle
11/10/2021
Filed — Alteration
X00625476-I1
11/09/2021
Special inspection requirement — Post-installed Anchors
11/09/2021
Special inspection requirement — Helical Piles Foundation (BB # 2014-020)
11/03/2021
Special inspection requirement — Duct leakage testing, insulation and design
09/07/2021
Objection raised — Inspections
43 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 08/13/2021
Fence
FiledStatusContractorScope
08/13/2021——Fence
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
11/09/2021Post-installed Anchors—special
11/09/2021Helical Piles Foundation (BB # 2014-020)—special
11/03/2021Duct leakage testing, insulation and design—energy_progress
08/13/2021HVAC-R and service water heating equipment—energy_progress
08/13/2021HVAC-R and service water piping design and insulation—energy_progress
08/13/2021Maintenance information—energy_progress
08/13/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
08/13/2021Energy Code Compliance Inspections—progress
08/13/2021HVAC-R and service water heating system controls—energy_progress
07/07/2021Fire-Resistance Rated Construction—progress
07/07/2021Structural Wood Frame—progress
07/07/2021Fenestration and door U-factor and product ratings—energy_progress
07/07/2021Interior lighting power—energy_progress
07/07/2021Heating Systems—special
07/07/2021Air barrier — testing —energy_progress
07/07/2021Insulation placement and R values—energy_progress
07/07/2021Permanent certificate—energy_progress
07/07/2021Maintenance information—energy_progress
07/07/2021Protection of exposed foundation insulation—energy_progress
07/07/2021Air barrier - visual inspection—energy_progress
07/07/2021Ventilation and air distribution system—energy_progress
07/07/2021Metering—energy_progress
07/07/2021Shutoff dampers—energy_progress
07/07/2021Fenestration air leakage—energy_progress
07/07/2021Fenestration areas—energy_progress
Latest 25 of 36.
21 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account