← Back
BuildNYC
Walk-up apt, over six families with stores
2119 AMSTERDAM AVENUE
MANHATTAN · BIN 1062644
💬 Discuss this project
1901Year Built
5Stories
C7Building Class
R7-2Zoning
9,880 sfGross Floor Area
15Units
Rent Stabilized66 Active Violations 65 unresolved · 1 paperwork only 5 likely answered 1 old, status unconfirmed ▸
Walk-up apt, over six families with stores · Owner of record: RG3 Realty · 2,500 sf lot · 3.95 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 11 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Pulssar Realty1103/21/2026
2119 Amsterdam703/21/2026
51 Hamilton PL Realty407/08/2026
Cassano Realty303/21/2026
RG3 Realty203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/26/2018$4.8M—PULSSAR REALTY, LLC → 51 HAMILTON PLACE REALTY INC$485/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nce Consulting Engineers101/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Conapac Services Dba103/21/2026
Conapac Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Abj PropertiesGeneral Contractor203/21/2026
Carlitos ContractingScaffold207/08/2026
Calary Gas HeatingPlumbing203/21/2026
AMC Plumbing, Heating & CLNGPlumbing203/22/2026
F T MechanicalPlumbing103/21/2026
Cel Tech ElectricGeneral Contractor103/21/2026
Euda Construction DesGeneral Contractor103/21/2026
Odyssia Global CommercialGeneral Contractor103/21/2026
MSS Golden Eagle ConstructionGeneral Contractor210/16/2014
Building Lifecycle
08/10/2026
At time of inspection observed interior stair case 3RD floor to roof level in state of disrepair condition includes steps and landing slop /leaning…
ECB violation · open
04/29/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
01/31/2026
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER TEMPERATURE EXCEEDING THE MAXIMUM ALLOWABLE TEMPERATURE OF 130F AT ALL…
HPD violation · open
01/06/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND WEST WALL IN THE KITCHEN LOCATED AT APT 2E,…
HPD violation · open
01/06/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT…
HPD violation · open
194 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Carlitos Contracting—
DOB NOW—Carlitos Contracting—
BIS—AMC Plumbing, Heating & CLNG—
BIS—Euda Construction—
BIS—Aura Plumbing—
BIS—Odyssia Global Commercial—
BIS—Cel Tech Electric—
BIS—MSS Golden Eagle Construction—
BIS—MSS Golden Eagle Construction—
BIS—Abj Properties—
BIS—Abj Properties—
BIS—Calary Gas Heating—
BIS—Calary Gas Heating—
Nothing on file for this building.
Nothing on file for this building.
139 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account