← Back
Two stories - detached, small or mid-size
212-05 29 AVENUE
QUEENS · Bayside · BIN 4623672
💬 Discuss this project
2021Year Built
2Stories
A1Building Class
R2AZoning
3,878 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 7,501 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Cellar1p · 1 filing · 19 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/28/2020$950K—Private party → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYNERGIC DESIGN ARCHITECTS104/30/2024
MEHDI GHAZI, P.E., P.C.405/31/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IBUILD CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW HENGDA CONSTRUCTIONGeneral Contractor603/21/2026
ACCORD POWER INCGeneral Contractor103/21/2026
WASOFF PLBG & UTILITY COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGIC DESIGN LLC8561104/30/2024
MEHDI GHAZI, P.E. P.C.7129205/30/2021
Building Lifecycle
All (33)Filed (5)Permit Issued (4)Signed Off (4)Inspection (1)Special Inspection (19)
07/01/2025
Signed off — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00332181-I1
09/11/2024
Signed off — Alteration
Installation of 11.89 kw soalr energy system on roof. No change of occupancy, use or egress.
Q01041618-I1
05/06/2024
Permit issued — Solar
Q01041618-I1-SL
04/30/2024
Filed — Alteration
Installation of 11.89 kw soalr energy system on roof. No change of occupancy, use or egress.
Q01041618-I1
04/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
04/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
04/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
04/25/2024
Special inspection requirement — Final
Malathi Ananthakrishnan
04/25/2024
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
03/12/2024
Signed off — Alteration
Q00735035-I1
10/26/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/20/2023
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00384038-I1
10/13/2023
Permit issued — Curb Cut
Q00735035-I1-CC
05/31/2023
Filed — Alteration
Q00735035-I1
08/18/2022
Permit issued — Plumbing
Q00332181-I1-PL
04/15/2022
Permit issued — Construction Fence
Q00384038-I1-FN
07/12/2021
Special inspection requirement — HVAC and service water heating equipment
MEHDI GHAZI
07/12/2021
Special inspection requirement — HVAC and service water heating system controls
MEHDI GHAZI
07/12/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MEHDI GHAZI
07/12/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
MEHDI GHAZI
07/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
07/12/2021
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
07/12/2021
Special inspection requirement — HVAC insulation and sealing
MEHDI GHAZI
05/30/2021
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00332181-P1
05/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
05/30/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MEHDI GHAZI
05/30/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
MEHDI GHAZI
05/30/2021
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
05/30/2021
Special inspection requirement — HVAC and service water heating equipment
MEHDI GHAZI
05/30/2021
Special inspection requirement — HVAC and service water heating system controls
MEHDI GHAZI
05/30/2021
Special inspection requirement — HVAC insulation and sealing
MEHDI GHAZI
02/13/2021
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00332181-I1
11/10/2020
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00384038-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offACCORD POWER INC05/06/2024
DOB NOWCurb CutSigned-offNEW HENGDA CONSTRUCTION10/13/2023
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO08/18/2022
DOB NOWConstruction FenceSigned-offNEW HENGDA CONSTRUCTION04/15/2022
BIS—ISSUEDL&L CONSTRUCTION DEVELOP03/04/2026
BIS—ISSUEDNEW HENGDA CONSTRUCTION04/11/2023
BIS—ISSUEDNEW HENGDA CONSTRUCTION04/14/2022
BIS—ISSUEDNEW HENGDA CONSTRUCTION04/14/2021
BIS—ISSUEDNEW HENGDA CONSTRUCTION02/03/2021
BIS—ISSUEDJIA WEI CONSTRUCTION INC12/30/2020
2 projects · most recent 05/06/2024
General Wiring Lighting
FiledStatusContractorScope
05/06/2024CompletePOWER SURGE ELECTRIC, INC—
05/02/2023CompleteHI-RITE ELECTRIC CORPGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/26/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
04/25/2024Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
04/25/2024Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
04/25/2024Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
04/25/2024FinalMalathi Ananthakrishnanprogress
04/25/2024Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
07/12/2021HVAC and service water heating equipment MEHDI GHAZIenergy_progress
07/12/2021HVAC and service water heating system controls MEHDI GHAZIenergy_progress
07/12/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMEHDI GHAZIspecial
07/12/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesMEHDI GHAZIspecial
07/12/2021Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
07/12/2021Energy Code Compliance InspectionsMEHDI GHAZIprogress
07/12/2021HVAC insulation and sealing MEHDI GHAZIenergy_progress
05/30/2021Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
05/30/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMEHDI GHAZIspecial
05/30/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesMEHDI GHAZIspecial
05/30/2021Energy Code Compliance InspectionsMEHDI GHAZIprogress
05/30/2021HVAC and service water heating equipment MEHDI GHAZIenergy_progress
05/30/2021HVAC and service water heating system controls MEHDI GHAZIenergy_progress
05/30/2021HVAC insulation and sealing MEHDI GHAZIenergy_progress
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing2
08/27/2026Q00332181-I1Request digital key ↗
08/15/2026Q00332181-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/24/2026Q00735035-I1Request digital key ↗
08/22/2026Q01041618-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00384038-I1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION7
09/16/2025440629189Open ↗
11/09/2023440629198Open ↗
06/05/2023440629189Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION3
02/04/2021440629189Open ↗
02/04/2021440629189Open ↗
02/03/2021440629189Open ↗
▸BISBPP - Street Opening DOT Permit - BPP - Street Opening2
12/20/2023440629198Open ↗
11/20/2023440629198Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/31/2021440629189Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM2
01/25/2021440629189Open ↗
11/05/2020440629189Open ↗
▸BISVERIFY TAX LOT1
04/11/2024440629189Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/11/2024440629189Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature11
09/23/2026Q01041618-I1Open ↗
09/23/2026Q01041618-I1Open ↗
09/23/2026Q01041618-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026Q01041618-I1Open ↗
09/23/2026Q01041618-I1Open ↗
08/28/2026Q00332181-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026Q00735035-I1Open ↗
08/13/2026Q00332181-P1Open ↗
08/13/2026Q00332181-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
09/30/2020440629189Open ↗
09/22/2020440629198Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/30/2020440629189Open ↗
09/22/2020440629198Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/04/2021440629189Open ↗
▸Trade Schedules & Equipment6
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
07/23/2025440629189Open ↗
11/05/2020440629189Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
04/11/2024440629189Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
04/11/2024440629189Open ↗
▸BISDEP STORMWATER/SEWER CERTIFICATION (HCP/SCP)1
11/05/2020440629189Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/29/2024440629189Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREES SITE PLAN1
04/12/2024440629189Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
04/11/2024440629189Open ↗
▸BISSTREET TREE CHECKLIST1
09/30/2020440629189Open ↗
▸BISSTREET TREE SIGNOFF1
07/23/2025440629189Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/08/2023440629189Open ↗
09/30/2020440629189Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
04/11/2024440629189Open ↗
▸BISINTERIOR LIGHTING POWER1
04/11/2024440629189Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
04/11/2024440629189Open ↗
▸BISFENESTRATION AREAS1
04/11/2024440629189Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
04/11/2024440629189Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/11/2024440629189Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/11/2024440629189Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/11/2024440629189Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/04/2021440629189Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00332181-I1Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY5
06/08/2023440629189Open ↗
11/05/2020440629189Open ↗
09/30/2020440629189Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF1
04/11/2024440629189Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
04/11/2024440629189Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
04/22/2024440629189Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
04/11/2024440629189Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
07/30/2024440629189Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/11/2024440629189Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/11/2024440629189Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
04/11/2024440629189Open ↗
▸BISMASONRY1
04/11/2024440629189Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
04/11/2024440629189Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
04/11/2024440629189Open ↗
▸BISSOIL REPORT1
09/30/2020440629189Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
04/11/2024440629189Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE2
06/05/2023440629189Open ↗
09/30/2020440629189Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01041618-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
12/20/2023440629198Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION8
12/01/2025440629189Open ↗
09/29/2025440629189Open ↗
09/29/2025440629189Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/30/2020440629189Open ↗
09/22/2020440629198Open ↗
▸BISBOROUGH INTAKE FORM1
02/04/2021440629189Open ↗
▸Other Documents16
▸BISBPP - SUPPORTING DOCUMENTATION5
12/20/2023440629198Open ↗
11/20/2023440629198Open ↗
11/20/2023440629198Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM2
04/11/2024440629189Open ↗
09/30/2020440629189Open ↗
▸BISCHIMNEYS AND VENTS1
04/11/2024440629189Open ↗
▸BISELECTRIC VEHICLE SERVICE EQUIPMENT REQUIREMENTS1
04/11/2024440629189Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
09/30/2020440629189Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
09/28/2020440629198Open ↗
▸BISMAINTENANCE INFORMATION1
04/11/2024440629189Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
04/11/2024440629189Open ↗
▸BISPERMANENT CERTIFICATE1
04/11/2024440629189Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
11/20/2023440629198Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM1
04/11/2024440629189Open ↗