← Back
Three families
212 14 STREET
BROOKLYN · BIN 3023649
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
2,430 sfGross Floor Area
3Units
Rent Stabilized9 Open Violations ▸FDNY Report ↗
Three families · 1,800 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 39p · 4 filings · 20 docs
Floor 21p · 1 filing · 15 docs
Floor 14p · 1 filing · 15 docs
Cellar13p · 3 filings · 20 docs
1 job · most recent 09/30/2021
General Wiring
FiledStatusContractorScope
09/30/2021Permit IssuedINTELOGIC ELECTRIC, INC.General Wiring
Building Lifecycle
All (93)Filed (19)Permit Issued (7)Signed Off (7)Violation (13)Inspection (9)Objection (8)Special Inspection (30)
05/01/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
06/06/2025
Violation issued (HPD, open)
A
11/26/2024
Violation issued (HPD, open)
I
04/03/2024
Violation issued (HPD, open)
A
11/20/2023
Violation issued (HPD, open)
I
03/20/2023
Violation issued (HPD, open)
A
12/21/2022
Signed off — Alteration
B00660517-I1
12/09/2022
Signed off — Alteration
B00658489-I1
12/06/2022
Signed off — Alteration
PROPOSE INSTALL TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOBNOW#B00660517. NO CHANGE IN USE,OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00720393-I1
11/25/2022
Filed — Alteration
B00658489-P4
11/25/2022
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
11/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
11/21/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/16/2022
Special inspection requirement — Fenestration air leakage
XIUCHENG LI
11/16/2022
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
11/16/2022
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
11/16/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
XIUCHENG LI
11/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
11/16/2022
Special inspection requirement — Fenestration areas
XIUCHENG LI
11/16/2022
Special inspection requirement — Insulation placement and R values
XIUCHENG LI
11/16/2022
Special inspection requirement — Final
XIUCHENG LI
11/09/2022
Signed off — Alteration
PROPOSE FOUNDATION WORK FILED IN CONJUNCTION WITH GC #B00660517-I1 FOR REAR HORIZONTAL ENLARGEMENT AT 1ST FL ONLY.
B00678226-I1
11/09/2022
Signed off — Alteration
PROPOSE STRUCTURAL WORK IN CONJUNCTION WITH GC #B00660517 FILED FOR REAR HORIZONTAL ENLARGEMENT AT 1ST FL ONLY. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00579767-I1
11/09/2022
Violation issued (HPD, open)
I
11/08/2022
Filed — Alteration
B00660517-P2
11/07/2022
Filed — Alteration
B00658489-P3
11/04/2022
Special inspection requirement — Fenestration areas
XIUCHENG LI
11/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
11/04/2022
Special inspection requirement — Fenestration air leakage
XIUCHENG LI
11/04/2022
Special inspection requirement — Insulation placement and R values
XIUCHENG LI
11/04/2022
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
11/04/2022
Special inspection requirement — Final
XIUCHENG LI
11/04/2022
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
11/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
11/04/2022
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
11/04/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
XIUCHENG LI
10/27/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/27/2022
Signed off — Alteration
PROPOSE PLUMBING WORKS INCLUDING MINOR PARTITION, RELOCATING KITCHEN, NEW WASHER/DRYER ON EXISTING 3RD FL AT EXISTING 3-STORIES W/ CELLAR BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. FILED IN CONJUNCTION WITH GC JOB # B00596264-I1
B00596281-I1
07/26/2022
Signed off — Alteration
PROPOSED MINOR PARTITION, RELOCATED KITCHEN, NEW WASHER / DRYER ON 3RD FLOOR APARTMENT. NO CHANGE IN USE, OCCUPANCY & EGRESS. PLUMBING WORKS FILED UNDER: B00596281
B00596264-I1
07/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
07/13/2022
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
07/06/2022
Objection resolved — Addressed
07/05/2022
Objection raised — Scope
06/13/2022
Filed — Alteration
PROPOSE PLUMBING WORKS INCLUDING MINOR PARTITION, RELOCATING KITCHEN, NEW WASHER/DRYER ON EXISTING 3RD FL AT EXISTING 3-STORIES W/ CELLAR BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. FILED IN CONJUNCTION WITH GC JOB # B00596264-I1
B00596281-P2
06/10/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/08/2022
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
06/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
06/07/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/27/2022
Filed — Alteration
B00658489-P2
05/27/2022
Filed — Alteration
B00660517-P1
05/27/2022
Special inspection requirement — Structural Steel - Welding
XIUCHENG LI
05/27/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
05/27/2022
Special inspection requirement — Structural Steel - Details
XIUCHENG LI
05/27/2022
Special inspection requirement — Final
XIUCHENG LI
05/27/2022
Special inspection requirement — Structural Steel - High Strength Bolting
XIUCHENG LI
05/27/2022
Special inspection requirement — Preliminary
XIUCHENG LI
05/26/2022
Filed — Alteration
PROPOSE FOUNDATION WORK FILED IN CONJUNCTION WITH GC #B00660517-I1 FOR REAR HORIZONTAL ENLARGEMENT AT 1ST FL ONLY.
B00678226-P1
05/26/2022
Filed — Alteration
PROPOSE STRUCTURAL WORK IN CONJUNCTION WITH GC #B00660517 FILED FOR REAR HORIZONTAL ENLARGEMENT AT 1ST FL ONLY. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00579767-P2
Latest 60 of 93 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SITELINE CONSTRUCTION303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/25/2021$2.0M—Private party → Private party$830/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHI F. LAU ARCHITECT, P.C.1411/25/2022
NTD ENGINEERING CONSULTANT LLC505/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING3803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SITELINE CONSTRUCTION INCGeneral Contractor907/08/2026
INTELOGIC ELECTRIC, INC.Electrical103/22/2026
BEST PLUMBING & HVAC INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S70101811/25/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offSITELINE CONSTRUCTION INC04/19/2022
DOB NOWFoundationSigned-offSITELINE CONSTRUCTION INC03/18/2022
DOB NOWStructuralSigned-offSITELINE CONSTRUCTION INC03/17/2022
DOB NOWPlumbingSigned-offBEST PLUMBING & HVAC INC03/11/2022
DOB NOWGeneral ConstructionSigned-offSITELINE CONSTRUCTION INC03/09/2022
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC10/04/2021
DOB NOWGeneral ConstructionSigned-offSITELINE CONSTRUCTION INC09/29/2021
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
11/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/27/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/10/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/30/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/30/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/17/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/17/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
11/25/2022Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
11/25/2022Energy Code Compliance InspectionsXIUCHENG LIprogress
11/16/2022Fire-Resistance Rated ConstructionXIUCHENG LIprogress
11/16/2022Energy Code Compliance InspectionsXIUCHENG LIprogress
11/16/2022Insulation placement and R valuesXIUCHENG LIenergy_progress
11/16/2022FinalXIUCHENG LIprogress
11/16/2022Fenestration and door U-factor and product ratingsXIUCHENG LIenergy_progress
11/16/2022Fenestration areasXIUCHENG LIenergy_progress
11/16/2022Fenestration air leakageXIUCHENG LIenergy_progress
11/16/2022Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
11/04/2022Energy Code Compliance InspectionsXIUCHENG LIprogress
11/04/2022Energy Code Compliance InspectionsXIUCHENG LIprogress
11/04/2022Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
11/04/2022Fenestration areasXIUCHENG LIenergy_progress
11/04/2022Fenestration air leakageXIUCHENG LIenergy_progress
11/04/2022Insulation placement and R valuesXIUCHENG LIenergy_progress
11/04/2022Fenestration and door U-factor and product ratingsXIUCHENG LIenergy_progress
11/04/2022Fire-Resistance Rated ConstructionXIUCHENG LIprogress
11/04/2022Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
11/04/2022FinalXIUCHENG LIprogress
07/13/2022Energy Code Compliance InspectionsXIUCHENG LIprogress
07/13/2022Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
06/08/2022Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
06/08/2022Energy Code Compliance InspectionsXIUCHENG LIprogress
05/27/2022Structural Steel - High Strength BoltingXIUCHENG LIspecial
Latest 25 of 66.
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
09/01/2026B00596281-I1Request digital key ↗
08/31/2026B00660517-I1Request digital key ↗
08/31/2026B00660517-P1Request digital key ↗
Showing 3 of 19 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00660517-P2Open ↗
08/13/2026B00660517-P1Open ↗
08/13/2026B00660517-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00660517-P1Open ↗
08/13/2026B00660517-I1Open ↗
08/13/2026B00660517-P2Open ↗
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/31/2026B00660517-P2Open ↗
08/31/2026B00660517-I1Open ↗
08/31/2026B00660517-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/25/2026B00596281-P1Open ↗
09/21/2026B00579767-P1Open ↗
09/02/2026B00596264-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/25/2026B00596281-P1Open ↗
09/21/2026B00579767-P1Open ↗
09/02/2026B00596264-I1Open ↗
Showing 3 of 15 on file for this type
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
08/31/2026B00660517-P1Open ↗
08/31/2026B00660517-P2Open ↗
08/31/2026B00660517-I1Open ↗
Showing 3 of 18 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00660517-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026B00678226-P1Open ↗
08/13/2026B00678226-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00678226-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00678226-I1Open ↗
▸Other Documents11
▸DOB NOWPlot Diagram5
08/13/2026B00660517-I1Open ↗
08/13/2026B00678226-P1Open ↗
08/13/2026B00678226-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00660517-P2Open ↗
08/13/2026B00660517-P1Open ↗
08/13/2026B00660517-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B00660517-P2Open ↗
08/13/2026B00660517-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00660517-I1Open ↗