← Back
Elevator cooperative
Penn South
212 9 AVENUE · BIN 1078541
💬 Discuss this project
1963Year Built
21Stories
D4Building Class
C2-6Zoning
250,908 sfGross Floor Area
197Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SAFE
Elevator cooperative · Owner of record: MUTUAL REDEVELOPMENT HOUSES INC · 71,700 sf lot · 3.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 3 docs
Floor 74p · 1 filing · 6 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 12p · 1 filing · 15 docs
Cellar2p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRATT CONSTRUCTION707/08/2026
PRAT ENTERPRISES907/08/2026
PRATT CONSTRUCTION&REST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HOWARD L ZIMMERMAN ARCH & ENG DPC703/24/2025
ASHRAF CORP206/22/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HOWARD L ZIMMERMAN ARCHITECTS1003/21/2026
Rigid Structural Design, LLC203/21/2026
HLZAE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRAT ENTERPRISES CORPGeneral Contractor1007/08/2026
KEW FOREST PLBG & HTG INCPlumbing407/08/2026
SYSTEMS 2000 PLBG SVCS LLPlumbing407/08/2026
EMPIRE LIC ELECL CONTRSElectrical103/22/2026
PRATT CONSTRUCTION & RESTGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ ENGINEERING, P.C.4665103/23/2026
HOWARD L ZIMMERMAN ARCHIT1712603/24/2025
Building Lifecycle
All (99)Filed (10)Permit Issued (12)Signed Off (5)Facade (FISP) (15)Violation (39)Inspection (6)Objection (4)Special Inspection (8)
04/29/2026
Violation issued (HPD, closed)
A
03/23/2026
Filed — Alteration
INSTALLATION AND USE OF SUSPENDED SCAFFOLD FOR FACADE RESTORATION/INSPECTION AS PER PLANS SUBMITTED
M01376443-I1
03/23/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
03/23/2026
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
09/03/2025
Violation issued (HPD, closed)
B
09/03/2025
Violation issued (HPD, closed)
B
04/14/2025
Signed off — Alteration
DOMESTIC GAS RE-PIPE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00587834-I1
04/08/2025
Signed off — Alteration
M01079911-I1
04/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jon Colatrella
03/24/2025
Filed — Alteration
DOMESTIC GAS RE-PIPE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00587834-P3
02/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jon Colatrella
01/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/02/2025
Permit issued — Sprinklers
M01079911-I1-EW-SP
11/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2024
Permit issued — Plumbing
M00587834-I1-PL
07/30/2024
Filed — Alteration
M01079911-I1
07/18/2024
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
07/15/2024
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
05/14/2024
Objection raised — Scope
05/14/2024
Objection resolved — Addressed
05/06/2024
Filed — Alteration
INSTALLATION OF BALCONY ENCLOSURE AT UNIT 7B. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01034086-I1
05/06/2024
Special inspection requirement — Final
04/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/11/2024
Special inspection requirement — Post-installed Anchors
11/08/2023
Permit issued — Plumbing
M00587834-I1-PL
10/30/2023
Violation issued (HPD, closed)
C
10/30/2023
Violation issued (HPD, closed)
C
09/07/2023
Permit issued — Plumbing
M00587834-I1-PL
08/26/2023
Violation issued (HPD, closed)
B
02/27/2023
Signed off — Alteration
M00470886-I1
02/08/2023
Objection resolved — Addressed
02/07/2023
Objection raised — Accessibility
02/02/2023
Filed — Alteration
DOMESTIC GAS RE-PIPE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00587834-P2
02/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jon Colatrella
01/18/2023
Cycle 9 facade report submitted
01/10/2023
Cycle 9 facade report signed — SAFE
12/08/2022
Cycle 9 facade inspection completed
11/04/2022
Filed — Alteration
DOMESTIC GAS RE-PIPE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00587834-P1
10/04/2022
Signed off — Alteration
Installation of temporary Supported Scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application
M00537986-I1
09/29/2022
Signed off — Alteration
M00509543-I1
09/09/2022
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
07/11/2022
Violation issued (HPD, closed)
C
07/06/2022
Violation issued (HPD, closed)
C
07/06/2022
Violation issued (HPD, closed)
C
05/23/2022
Permit issued — Plumbing
M00587834-I1-PL
05/03/2022
Filed — Alteration
DOMESTIC GAS RE-PIPE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00587834-I1
03/21/2022
Violation issued (ECB, closed)
Construction
10/26/2021
Violation issued (ECB, closed)
Construction
10/21/2021
Violation issued (ECB, closed)
Unknown
10/21/2021
Violation issued (ECB, closed)
Construction
10/21/2021
Violation issued (ECB, closed)
Construction
10/20/2021
Permit issued — Sidewalk Shed
M00509543-I1-SH
10/19/2021
Permit issued — Supported Scaffold
M00537986-I1-SF
10/19/2021
Permit issued — General Construction
M00470886-I1-GC
08/18/2021
Violation issued (ECB, closed)
Construction
07/07/2021
Permit issued — General Construction
M00470886-I1-GC
06/23/2021
Permit issued — Supported Scaffold
M00537986-I1-SF
06/22/2021
Filed — Alteration
Installation of temporary Supported Scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application
M00537986-I1
05/27/2021
Permit issued — Sidewalk Shed
M00509543-I1-SH
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offKEW FOREST PLBG & HTG INC01/02/2025
DOB NOWPlumbingSigned-offSYSTEMS 2000 PLBG SVCS LL11/20/2024
DOB NOWPlumbingSigned-offSYSTEMS 2000 PLBG SVCS LL11/08/2023
DOB NOWPlumbingSigned-offSYSTEMS 2000 PLBG SVCS LL09/07/2023
DOB NOWPlumbingSigned-offSYSTEMS 2000 PLBG SVCS LL05/23/2022
DOB NOWSidewalk ShedSigned-offPRAT ENTERPRISES CORP10/20/2021
DOB NOWSupported ScaffoldSigned-offPRAT ENTERPRISES CORP10/19/2021
DOB NOWGeneral ConstructionSigned-offPRAT ENTERPRISES CORP10/19/2021
DOB NOWGeneral ConstructionSigned-offPRAT ENTERPRISES CORP07/07/2021
DOB NOWSupported ScaffoldSigned-offPRAT ENTERPRISES CORP06/23/2021
DOB NOWSidewalk ShedSigned-offPRAT ENTERPRISES CORP05/27/2021
DOB NOWSidewalk ShedSigned-offPRATT CONSTRUCTION & RES*04/25/2021
BISOTISSUEDPRATT CONSTRUCTION & REST02/05/2018
BISPLISSUEDM & S MECHANICAL SVCS INC01/17/2017
BISOTISSUEDMETROPOLITAN PAINTING & C09/11/2014
BISMHISSUEDTECHNICAL CONSTR SERV.INC05/16/2014
BISOTISSUEDTECHNICAL CONSTR SERV.INC05/16/2014
BISOTISSUEDTECHNICAL CONSTR SERV.INC04/16/2014
BISMHISSUEDTECHNICAL CONSTR SERV.INC04/16/2014
BISPLISSUEDABSOLUTE PLBG HTG & MECH01/14/2014
BISOTISSUEDZKC NY LLC01/09/2014
BISOTISSUEDJT MAGEN & COMPANY INC05/20/2013
BISOTISSUEDRCDOLNER LLC08/16/2012
BISMHISSUEDRCDOLNER LLC08/16/2012
BISMHISSUEDRCDOLNER LLC05/30/2012
BISOTISSUEDRCDOLNER LLC05/30/2012
BISMHISSUEDRCDOLNER LLC05/30/2012
BISOTISSUEDRCDOLNER LLC05/30/2012
BISEQISSUEDEMPIRE CONTROL ABATEMENT03/02/2012
BISEQISSUEDS&E BRIDGE & SCAFFOLD LLC.03/10/2011
BISOTISSUEDJT MAGEN & COMPANY INC02/08/2011
BISEQISSUEDS&E BRIDGE & SCAFFOLD LLC.10/21/2010
BISEQISSUEDAM&G WATERPROOFING LLC08/09/2010
BISEQISSUEDS&E BRIDGE & SCAFFOLD LLC.07/13/2010
BISOTISSUEDTRASK LTD09/14/2006
BISPLISSUEDACCURATE MECHANICAL INC09/07/2006
BISOTISSUEDHOCHBERG CONTRACTING MANAGEMENT,09/06/2006
BISCCISSUEDMETEOTECH CONTRACTING03/16/2004
BISEQISSUEDM & W WATERPROOFING08/03/1999
BISOTISSUEDSKYLINE WINDOWS LLC11/14/1997
+ 4 more permits on file
5 projects · most recent 04/02/2025
FiledStatusContractorScope
04/02/2025CompleteSAFETECH ELECL CONTNG COR—
10/18/2023CompleteEMPIRE LIC ELECL CONTRS—
07/21/2023CompleteN.Z. PILGRIM ELECTRIC INC—
04/28/2021CompleteSTEVEN FARKAS—
12/13/2018CompleteCONCORDE ELEC'L SER INC—
1 project · most recent 03/23/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
03/23/2026——Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
07/15/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
09/09/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
03/23/2026Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
03/23/2026Post-installed AnchorsKarol Zdancewiczspecial
04/02/2025Fire-Resistant Penetrations and JointsJon Colatrellaspecial
02/18/2025Fire-Resistant Penetrations and JointsJon Colatrellaspecial
05/06/2024Final—progress
04/11/2024Structural Stability – Alterations of existing buildings—special
04/11/2024Post-installed Anchors—special
02/01/2023Fire-Resistant Penetrations and JointsJon Colatrellaspecial
▾Documents — 284 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
09/03/2026M00509543-I1Request digital key ↗
09/03/2026M00537986-I1Request digital key ↗
08/26/2026M01079911-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00470886-I1Request digital key ↗
▸Applications & Permits54
▸BISPLAN / WORK APPROVAL APPLICATION32
10/15/2021140935601Open ↗
11/14/2017123169944Open ↗
07/21/2017122957933Open ↗
Showing 3 of 32 on file for this type
▸BISWORK PERMIT APPLICATION21
02/06/2018123169944Open ↗
01/18/2017122957933Open ↗
09/17/2014121545186Open ↗
Showing 3 of 21 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
03/07/2018123169944Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026M01034086-I1Open ↗
▸Seals & Professional Certifications73
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION46
03/07/2018123169944Open ↗
01/26/2018123169944Open ↗
11/16/2017122957933Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/03/2026M00509543-I1Open ↗
09/03/2026M00470886-I1Open ↗
09/03/2026M00537986-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
06/04/2012121079849Open ↗
06/04/2012121079849Open ↗
06/04/2012121079849Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/04/2012121079849Open ↗
03/08/2012120997680Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026M00587834-I1Open ↗
08/28/2026M01376443-I1Open ↗
08/28/2026M01376443-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/10/2020140935601Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
07/21/2017122957933Open ↗
12/12/2016122957933Open ↗
12/09/2016122957933Open ↗
▸BISSCHEDULE B - PLUMBING1
10/26/2013121824384Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
12/04/2014121824384Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes4
11/14/2017123169944Open ↗
12/12/2016122957933Open ↗
12/09/2016122957933Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos23
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
08/10/2020140935601Open ↗
12/12/2016122957933Open ↗
12/09/2016122957933Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026M01079911-I1Open ↗
08/24/2026M00587834-P1Open ↗
08/24/2026M00587834-P3Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
04/12/2012120438188Open ↗
Showing 1 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
04/22/2014121911627Open ↗
05/31/2012121079849Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
05/31/2012121079849Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/03/2026M00470886-I1Open ↗
▸Energy Compliance26
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
03/07/2018123169944Open ↗
11/16/2017122957933Open ↗
11/14/2017123169944Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
03/07/2018123169944Open ↗
11/16/2017122957933Open ↗
06/28/2017121079849Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/10/2020140935601Open ↗
▸BISTR8: Energy Code Progress Inspections1
04/18/2014121911627Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/18/2012121079830Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/10/2020140935601Open ↗
▸Approvals, Objections & Sign-offs22
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
03/07/2018123169944Open ↗
11/16/2017122957933Open ↗
06/28/2017121079849Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
06/04/2012121079849Open ↗
05/18/2012121079830Open ↗
09/28/2011120827267Open ↗
Showing 3 of 9 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/12/2012120438188Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/26/2026M01079911-I1Open ↗
▸Cost, Insurance & Ownership29
▸BISCOST AFFIDAVIT29
08/10/2020140935601Open ↗
03/07/2018123169944Open ↗
11/16/2017122957933Open ↗
Showing 3 of 29 on file for this type
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET22
11/14/2017123169944Open ↗
12/12/2016122957933Open ↗
12/09/2016122957933Open ↗
Showing 3 of 22 on file for this type
▸BISADDITIONAL INFORMATION3
04/22/2014121824384Open ↗
12/13/2012121079830Open ↗
Showing 2 of 3 on file for this type
▸BISBOROUGH INTAKE FORM2
03/07/2018123169944Open ↗
11/16/2017122957933Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
08/10/2020140935601Open ↗
09/28/2011120827267Open ↗
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
09/14/2011120406113Open ↗
08/25/2011120508655Open ↗
06/10/2011120407853Open ↗
▸DOB NOWPlot Diagram1
08/13/2026M01034086-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01376443-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01376443-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M01034086-I1Open ↗