Three families
212 ADELPHI STREET
BROOKLYN · BIN 3058508
💬 Discuss this project
1866Year Built
3Stories
C0Building Class
R6BZoning
3,600 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Three families · 1,933 sf lot · 1.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction18p · 2 filings · 20 docs
Floor 3Under Construction30p · 1 filing · 20 docs
Floor 2Under Construction31p · 1 filing · 20 docs
Floor 1Under Construction44p · 1 filing · 20 docs
CellarUnder Construction1 filing · 5 docs
BasementUnder Construction32p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/28/2024$3.7M—Private party → Private party$1,031/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOUTIQKEY1203/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KENNEDY CONSTRUCTION SERVGeneral Contractor1107/08/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor104/09/2026
R.J.C. MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
QUALITY TESTING, LLC7344412/04/2025
NKM ENGINEERING PLLC6244110/30/2025
KENDALL ENGINEERING PC4154106/17/2025
Building Lifecycle
All (94)Filed (8)Permit Issued (9)Violation (11)Inspection (5)Objection (36)Special Inspection (25)
05/08/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/08/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/01/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/21/2026
Objection resolved — Addressed
04/20/2026
Objection raised — DPL-1
04/14/2026
Filed — Alteration CO
PLUMBING WORK WITH THE ALTERATION OF THE CONVERTED 3 TO 2 FAMILY TOWNHOUSE. INSTALL STORM AND PLUMBING. CAP AND REMOVE ALL GAS FIXTURES AND PIPING. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B01173061-P3
03/10/2026
Permit issued — General Construction
B01173061-I1-GC
12/08/2025
Special inspection requirement — Structural Steel - High Strength Bolting
KEVIN SNEDEKER
12/08/2025
Special inspection requirement — Subgrade Inspections
12/08/2025
Special inspection requirement — Final
KEVIN SNEDEKER
12/08/2025
Special inspection requirement — Structural Wood Frame
KEVIN SNEDEKER
12/08/2025
Special inspection requirement — Structural Steel - Details
KEVIN SNEDEKER
12/08/2025
Special inspection requirement — Masonry
KEVIN SNEDEKER
12/08/2025
Special inspection requirement — Concrete - Cast-In-Place
12/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
KEVIN SNEDEKER
12/08/2025
Special inspection requirement — Post-installed Anchors
KEVIN SNEDEKER
12/08/2025
Special inspection requirement — Structural Steel - Welding
KEVIN SNEDEKER
12/04/2025
Filed — Alteration CO
PLUMBING WORK WITH THE ALTERATION OF THE CONVERTED 3 TO 2 FAMILY TOWNHOUSE. INSTALL STORM AND PLUMBING. CAP AND REMOVE ALL GAS FIXTURES AND PIPING. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B01173061-P1
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KEVIN SNEDEKER
11/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
KEVIN SNEDEKER
11/16/2025
Filed — Alteration CO
PLUMBING WORK WITH THE ALTERATION OF THE CONVERTED 3 TO 2 FAMILY TOWNHOUSE. INSTALL STORM AND PLUMBING. CAP AND REMOVE ALL GAS FIXTURES AND PIPING. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B01173061-P2
11/10/2025
Special inspection requirement — Concrete - Cast-In-Place
11/10/2025
Special inspection requirement — Subgrade Inspections
11/06/2025
Special inspection requirement — Structural Wood Frame
KEVIN SNEDEKER
11/06/2025
Special inspection requirement — Structural Steel - Welding
KEVIN SNEDEKER
11/06/2025
Special inspection requirement — Structural Steel - High Strength Bolting
KEVIN SNEDEKER
11/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
KEVIN SNEDEKER
11/06/2025
Special inspection requirement — Post-installed Anchors
KEVIN SNEDEKER
11/06/2025
Special inspection requirement — Masonry
KEVIN SNEDEKER
11/06/2025
Special inspection requirement — Structural Steel - Details
KEVIN SNEDEKER
11/06/2025
Special inspection requirement — Final
KEVIN SNEDEKER
11/03/2025
Permit issued — Solar
B01307113-I1-SL
10/30/2025
Filed — Alteration
B01307113-I1
08/11/2025
Permit issued — Mechanical Systems
B01173061-S2-MS
08/11/2025
Permit issued — General Construction
B01173061-I1-GC
08/11/2025
Permit issued — Structural
B01173061-S3-ST
08/08/2025
Permit issued — Plumbing
B01173061-S1-PL
07/23/2025
Permit issued — Structural
B01173061-S3-ST
07/22/2025
Permit issued — General Construction
B01173061-I1-GC
07/21/2025
Permit issued — Mechanical Systems
B01173061-S2-MS
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
06/30/2025
Objection resolved — Addressed
06/30/2025
Objection resolved — Addressed
06/30/2025
Objection resolved — Addressed
06/23/2025
Objection raised — Structural
06/23/2025
Objection raised — Structural
06/23/2025
Objection raised — Inspections
06/17/2025
Filed — Alteration CO
PLUMBING WORK WITH THE ALTERATION OF THE CONVERTED 3 TO 2 FAMILY TOWNHOUSE. INSTALL STORM AND PLUMBING. CAP AND REMOVE ALL GAS FIXTURES AND PIPING. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B01173061-S2
06/17/2025
Filed — Alteration CO
PLUMBING WORK WITH THE ALTERATION OF THE CONVERTED 3 TO 2 FAMILY TOWNHOUSE. INSTALL STORM AND PLUMBING. CAP AND REMOVE ALL GAS FIXTURES AND PIPING. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B01173061-S1
06/13/2025
Filed — Alteration CO
PLUMBING WORK WITH THE ALTERATION OF THE CONVERTED 3 TO 2 FAMILY TOWNHOUSE. INSTALL STORM AND PLUMBING. CAP AND REMOVE ALL GAS FIXTURES AND PIPING. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B01173061-S3
06/11/2025
Objection raised — Other
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KEVIN KENDALL
06/06/2025
Violation issued (HPD, closed)
A
06/04/2025
Objection resolved — Addressed
06/04/2025
Objection resolved — Addressed
06/04/2025
Objection resolved — Addressed
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKENNEDY CONSTRUCTION SERV03/10/2026
DOB NOWSolarPermit IssuedBROOKLYN SOLARWORKS LLC11/03/2025
DOB NOWMechanical SystemsPermit IssuedKENNEDY CONSTRUCTION SERV08/11/2025
DOB NOWGeneral ConstructionPermit IssuedKENNEDY CONSTRUCTION SERV08/11/2025
DOB NOWStructuralPermit IssuedKENNEDY CONSTRUCTION SERV08/11/2025
DOB NOWPlumbingPermit IssuedR.J.C. MECHANICAL CORP08/08/2025
DOB NOWStructuralPermit IssuedKENNEDY CONSTRUCTION SERV07/23/2025
DOB NOWGeneral ConstructionPermit IssuedKENNEDY CONSTRUCTION SERV07/22/2025
DOB NOWMechanical SystemsPermit IssuedKENNEDY CONSTRUCTION SERV07/21/2025
1 project · most recent 04/14/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/14/2026Permit IssuedKENNEDY CONSTRUCTION SERVHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric mxz-sm36namhz2-U1 36,000 BTU · Heat Pump Outdoor ×1
mxz-sm42namhz2-U1 42,000 BTU · Vrf Outdoor ×1
mxz-sm48namhz2-U1 48,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 04/14/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/14/2026Permit IssuedR.J.C. MECHANICAL CORPGas, Storm, Water/Sanitary
2 projects · most recent 10/23/2025
General Wiring
FiledStatusContractorScope
10/23/2025CompleteBROOKYLN SOLARWORKS, LLC—
08/14/2025Permit IssuedMOMERN ELECT'L CONTRS INCGeneral Wiring
1 project · most recent 04/14/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
04/14/2026Permit IssuedKENNEDY CONSTRUCTION SERVSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/08/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/08/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/08/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/01/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
12/08/2025Structural Steel - High Strength BoltingKEVIN SNEDEKERspecial
12/08/2025Subgrade Inspections—special
12/08/2025FinalKEVIN SNEDEKERprogress
12/08/2025Structural Wood FrameKEVIN SNEDEKERprogress
12/08/2025Structural Steel - DetailsKEVIN SNEDEKERspecial
12/08/2025MasonryKEVIN SNEDEKERspecial
12/08/2025Concrete - Cast-In-Place—special
12/08/2025Structural Stability – Alterations of existing buildingsKEVIN SNEDEKERspecial
12/08/2025Post-installed AnchorsKEVIN SNEDEKERspecial
12/08/2025Structural Steel - WeldingKEVIN SNEDEKERspecial
11/21/2025Fire-Resistant Penetrations and JointsKEVIN SNEDEKERspecial
11/21/2025Fire-Resistance Rated ConstructionKEVIN SNEDEKERprogress
11/10/2025Concrete - Cast-In-Place—special
11/10/2025Subgrade Inspections—special
11/06/2025Structural Wood FrameKEVIN SNEDEKERprogress
11/06/2025Structural Steel - WeldingKEVIN SNEDEKERspecial
11/06/2025Structural Steel - High Strength BoltingKEVIN SNEDEKERspecial
11/06/2025Structural Stability – Alterations of existing buildingsKEVIN SNEDEKERspecial
11/06/2025Post-installed AnchorsKEVIN SNEDEKERspecial
11/06/2025MasonryKEVIN SNEDEKERspecial
11/06/2025Structural Steel - DetailsKEVIN SNEDEKERspecial
11/06/2025FinalKEVIN SNEDEKERprogress
06/10/2025Fire-Resistant Penetrations and JointsKEVIN KENDALLspecial
01/28/2025FinalKEVIN KENDALLprogress
01/28/2025Mechanical SystemsKEVIN KENDALLspecial
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/20/2026B01307113-I1Request digital key ↗
08/19/2026B01173061-S1Request digital key ↗
08/19/2026B01173061-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit8
08/15/2026B01173061-P3Open ↗
08/13/2026B01173061-S2Open ↗
08/13/2026B01173061-I1Open ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01173061-I1Open ↗
08/13/2026B01173061-P2Open ↗
▸Seals & Professional Certifications28
▸DOB NOWSpecial Inspector Seal & Signature14
09/02/2026B01173061-P1Open ↗
09/02/2026B01173061-P1Open ↗
09/02/2026B01173061-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/19/2026B01173061-P3Open ↗
08/19/2026B01173061-P2Open ↗
08/19/2026B01173061-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026B01173061-P1Open ↗
09/02/2026B01173061-P1Open ↗
09/01/2026B01173061-S2Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/19/2026B01173061-P2Open ↗
08/14/2026B01173061-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/19/2026B01173061-S2Open ↗
08/19/2026B01173061-S1Open ↗
08/15/2026B01173061-S3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01307113-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01307113-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification2
08/19/2026B01173061-P2Open ↗
08/14/2026B01173061-I1Open ↗
▸DOB NOWProof of Historic Building2
08/13/2026B01173061-P2Open ↗
08/13/2026B01173061-I1Open ↗