← Back
One family attached or semi-detached
212 THROGS NECK BLVD
BRONX · Throgs Neck-Schuylerville · BIN 2078600
💬 Discuss this project
1950Year Built
2Stories
A5Building Class
R4-1Zoning
960 sfGross Floor Area
1Units
0 Open Violations
One family attached or semi-detached · 2,248 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/14/2015$399K—— → —$416/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR107/23/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281107/23/2024
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Violation (2)Special Inspection (5)
06/30/2026
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 17 Panels, 6.97 kW
X01084574-I1
07/24/2024
Permit issued — Solar
X01084574-I1-SL
07/23/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 17 Panels, 6.97 kW
X01084574-I1
07/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
07/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
07/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
07/23/2024
Special inspection requirement — Final
Mina Makar
07/23/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
11/19/2003
Violation issued (ECB, closed)
Construction
08/28/1996
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR07/24/2024
1 project · most recent 07/23/2024
FiledStatusContractorScope
07/23/2024CompleteISLAND ELECTRIC CORP—
1 project · most recent 07/23/2024
FiledStatusContractorScope
07/23/2024Signed-offMOMENTUM SOLAR17 panels, 6.97 kw, 299 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/23/2024Fire-Resistant Penetrations and JointsMina Makarspecial
07/23/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
07/23/2024Energy Code Compliance InspectionsMina Makarprogress
07/23/2024FinalMina Makarprogress
07/23/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026X01084574-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026X01084574-I1Open ↗
09/01/2026X01084574-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026X01084574-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026X01084574-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01084574-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWUtility Company Final Acceptance Letter2
08/21/2026X01084574-I1Open ↗
08/13/2026X01084574-I1Open ↗