← Back
MANHATTAN
212 West 93rd Street Condominium
212 WEST 93 STREET · Upper West Side (Central) · BIN 1033615
💬 Discuss this project
—Year Built
—Stories
—Building Class
C4-6AZoning
—Gross Floor Area
—Units
LL97 Covered0 Open Violations
7,550 sf lot · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionLandscapeCivilGeneral
Floor 81p · 1 filing · 20 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 31p · 1 filing · 8 docs
Floor 21p · 1 filing · 20 docs
Floor 12p · 2 filings · 20 docs
Mezzanine2p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
Sub-Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LANDSEA HOLDINGS1907/08/2026
HE2PD1107/08/2026
ROCK GROUP NY2907/08/2026
LANDSEA HOMES703/22/2026
VOREA CONSTRUCTION CO2003/22/2026
COLE PARTNERS303/22/2026
212 W 93RD ST OWNER LLC103/22/2026
212 WEST 93RD STREET2003/21/2026
212 W 93RD STREET203/21/2026
OLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MG ENGINEERING D.P.C.806/05/2024
CARMI BEE302/12/2024
ASIF JAMIL, RA1310/14/2021
PACE ENGINEERING P.C.408/24/2021
KZ ENGINEERING, P.C210/05/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO2603/21/2026
JM ZONING, LLC.1503/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
EUROCELT EXPEDITING, INC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCK GROUP NY CORPGeneral Contractor1307/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor1203/21/2026
PLATINUM SERVICES NY LLCGeneral Contractor903/21/2026
BREND RESTORATION LLCGeneral Contractor603/21/2026
RETAIL PROJECT MANGEMENTGeneral Contractor507/08/2026
FLUID MECHANICS CORPPlumbing307/08/2026
RRP PLUMBING CORPFire Protection207/08/2026
PRECISION HOIST & SCAFFO*General Contractor207/08/2026
RRP PLUMBING CORPPlumbing107/08/2026
PETER GERAZOUNISElectrical103/21/2026
ROMA ELECTRIC CORPElectrical103/22/2026
JOE ZAGOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMARACON TESTING & INSPEC5842606/05/2024
VIBRANALYSIS INC., DBA VT6864210/20/2023
Building Lifecycle
All (172)Filed (30)Permit Issued (29)Signed Off (8)Violation (52)Inspection (8)Objection (26)Special Inspection (19)
08/29/2024
Signed off — Alteration
Installation of a gas boiler as per plans.
M00362083-I1
08/05/2024
Signed off — Alteration
Installation of a gas boiler as per plans.
M00362083-S1
06/12/2024
Signed off — Alteration
Congregation Shaare Zedek: Modification sprinkler/ plumbing system as per plans filed herewith. Filed in conjunction with NB# 121203884.:
M00362071-I1
06/05/2024
Filed — Alteration
Congregation Shaare Zedek: Modification sprinkler/ plumbing system as per plans filed herewith. Filed in conjunction with NB# 121203884.:
M00362071-P5
06/05/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/05/2024
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
06/03/2024
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
05/29/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
05/22/2024
Filed — Alteration
Congregation Shaare Zedek: Modification sprinkler/ plumbing system as per plans filed herewith. Filed in conjunction with NB# 121203884.:
M00362071-P4
05/08/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/26/2024
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
04/11/2024
Filed — Alteration
Congregation Shaare Zedek: Modification sprinkler/ plumbing system as per plans filed herewith. Filed in conjunction with NB# 121203884.:
M00362071-P3
04/10/2024
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
03/15/2024
Filed — Alteration
Congregation Shaare Zedek: Modification sprinkler/ plumbing system as per plans filed herewith. Filed in conjunction with NB# 121203884.:
M00362071-P2
03/15/2024
Permit issued — Boiler Equipment
M00362083-S1-BE
02/28/2024
Filed — Alteration
Congregation Shaare Zedek: Modification sprinkler/ plumbing system as per plans filed herewith. Filed in conjunction with NB# 121203884.:
M00362071-P1
02/27/2024
Objection raised — Other
02/27/2024
Objection resolved — Addressed
02/23/2024
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
02/12/2024
Filed — No Work
M00970965-I1
02/12/2024
Filed — No Work
M00985525-I1
02/12/2024
Filed — No Work
M00985542-I1
02/09/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/22/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
01/11/2024
Inspection — Fail-Final SP - Up to 9 Requested Floors
Fail
View inspection ↗
01/04/2024
Special inspection requirement — Public Assembly Emergency Lighting
JUAN GOMEZ
12/04/2023
Special inspection requirement — Public Assembly Emergency Lighting
JUAN GOMEZ
11/21/2023
Objection resolved — Addressed
11/21/2023
Objection resolved — Addressed
11/21/2023
Objection resolved — Addressed
11/21/2023
Objection resolved — Addressed
11/16/2023
Objection resolved — Addressed
11/16/2023
Objection resolved — Addressed
11/08/2023
Objection resolved — Addressed
11/08/2023
Objection resolved — Addressed
11/08/2023
Objection resolved — Addressed
11/08/2023
Objection resolved — Addressed
11/08/2023
Objection resolved — Addressed
11/08/2023
Objection resolved — Addressed
11/02/2023
Permit issued — Plumbing
M00362071-I1-EW-SP
11/01/2023
Permit issued — Sprinklers
M00362071-I1-PL
10/27/2023
Objection raised — Scope
10/27/2023
Objection raised — Other
10/27/2023
Objection raised — Scope
10/27/2023
Objection raised — Energy
10/27/2023
Objection raised — Scope
10/27/2023
Objection raised — Structural
10/27/2023
Objection raised — Scope
10/27/2023
Objection raised — Fire_Protection
10/27/2023
Objection raised — Mechanical
10/27/2023
Objection raised — Other
10/27/2023
Objection raised — Admin
10/27/2023
Objection raised — Fire_Protection
10/20/2023
Filed — Alteration
Installation of a gas boiler as per plans.
M00362083-S1
10/17/2023
Special inspection requirement — Heating Systems
JUAN GOMEZ
10/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
09/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/05/2023
Permit issued — Sprinklers
M00362071-I1-EW-SP
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 172 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offFLUID MECHANICS CORP03/15/2024
DOB NOWPlumbingSigned-offFLUID MECHANICS CORP11/02/2023
DOB NOWSprinklersSigned-offFLUID MECHANICS CORP11/01/2023
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.09/05/2023
DOB NOWMechanical SystemsSigned-offRETAIL PROJECT MANGEMENT05/08/2023
DOB NOWPlumbingSigned-offRRP PLUMBING CORP10/24/2022
DOB NOWPlumbingSigned-offRALPH W. LANDOLFI JR.10/24/2022
DOB NOWMechanical SystemsSigned-offRETAIL PROJECT MANGEMENT10/18/2022
DOB NOWMechanical SystemsSigned-offRETAIL PROJECT MANGEMENT03/28/2022
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC10/21/2021
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC10/21/2021
DOB NOWConstruction FenceSigned-offPLATINUM SERVICES NY LLC10/19/2021
DOB NOWSupported ScaffoldSigned-offBREND RESTORATION LLC07/22/2021
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP09/30/2020
DOB NOWConstruction FenceSigned-offROCK GROUP NY CORP09/28/2020
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP09/28/2020
DOB NOWConstruction FenceSigned-offPRECISION HOIST & SCAFFO*09/21/2020
DOB NOWSupported ScaffoldSigned-offBREND RESTORATION LLC07/27/2020
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP10/25/2019
DOB NOWSupported ScaffoldSigned-offROCK GROUP NY CORP10/25/2019
DOB NOWConstruction FenceSigned-offROCK GROUP NY CORP10/10/2019
DOB NOWConstruction FenceSigned-offROCK GROUP NY CORP01/22/2019
DOB NOWConstruction FenceSigned-offPRECISION HOIST & SCAFFO*10/09/2018
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC06/12/2018
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC05/29/2018
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC03/26/2018
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC03/26/2018
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC02/13/2018
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC02/13/2018
BISOTISSUEDRETAIL PROJECT MANGEMENT05/08/2023
BIS—ISSUEDTHE VOREA CONSTRUCTION CO12/20/2022
BISOTISSUEDRETAIL PROJECT MANGEMENT10/18/2022
BISOTISSUEDRETAIL PROJECT MANGEMENT04/22/2022
BIS—ISSUEDTHE VOREA CONSTRUCTION CO02/08/2022
BISPLISSUEDGW MECHANICAL CORP02/02/2022
BIS—ISSUEDTHE VOREA CONSTRUCTION CO01/12/2022
BISOTISSUEDTHE VOREA CONSTRUCTION CO10/18/2021
BISOTISSUEDTHE VOREA CONSTRUCTION CO07/22/2021
BISPLISSUEDGW MECHANICAL CORP02/03/2021
BISSDISSUEDPHOENIX PLMBG & MECH CORP01/21/2021
+ 22 more permits on file
16 projects · most recent 08/19/2026
General Wiring
FiledStatusContractorScope
08/19/2026CompleteNORTHEAST ELECTRICAL CONTRACTING—
06/12/2024CompleteROMA ELECTRIC CORP—
02/01/2024CompleteL&B ELEC'L INTERNATIONALGeneral Wiring
02/22/2023CompletePDI NYC ELECTRIC, LLCGeneral Wiring
12/20/2022CompletePDI NYC ELECTRIC, LLC2 meters, 2 new_meters
12/10/2021CompleteRAINBOW ELECTRIC CO., INC—
11/18/2021CancelledTRINCITY ELECTRIC, INCGeneral Wiring
09/25/2020CompleteJAM ELECTRICAL CORP—
07/07/2020CompleteSTAR ELEC'L CONTRACTORS C—
02/10/2020CompletePDI NYC ELECTRIC, LLC1 meters, 1 new_meters
01/30/2020CompleteILLUMINOUS ELECTRIC CORP.—
05/07/2019CancelledOHM PRO ELECTL CONST CORP—
03/18/2019CancelledOHM PRO ELECTL CONST CORP1 meters, 1 new_meters
02/04/2019CompleteTOP SHELF ELECTRIC CORP—
09/12/2018CompleteROMA ELECTRIC CORPGeneral Wiring
1 project · most recent 10/14/2021
Scaffold Sidewalk Shed
FiledStatusContractorScope
10/14/2021Signed-offROCK GROUP NY CORPScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/05/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/29/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
05/08/2024Pass-Final Boiler Equipment InspectionPassView ↗
02/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/22/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
01/11/2024Fail-Final SP - Up to 9 Requested FloorsFailView ↗
09/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
06/05/2024Sprinkler SystemsCONNIE PISANIspecial
06/03/2024Sprinkler SystemsCONNIE PISANIspecial
04/26/2024Sprinkler SystemsCONNIE PISANIspecial
04/10/2024Sprinkler SystemsCONNIE PISANIspecial
02/23/2024Sprinkler SystemsCONNIE PISANIspecial
01/04/2024Public Assembly Emergency LightingJUAN GOMEZprogress
12/04/2023Public Assembly Emergency LightingJUAN GOMEZprogress
10/17/2023Heating SystemsJUAN GOMEZspecial
10/17/2023Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
06/24/2020HVAC and service water heating system controls JUAN GOMEZenergy_progress
06/24/2020HVAC and service water heating equipment JUAN GOMEZenergy_progress
06/24/2020Mechanical SystemsJUAN GOMEZspecial
06/24/2020Heating SystemsJUAN GOMEZspecial
06/24/2020FinalJUAN GOMEZprogress
06/24/2020HVAC insulation and sealing JUAN GOMEZenergy_progress
06/24/2020Maintenance informationJUAN GOMEZenergy_progress
06/24/2020Shutoff dampersJUAN GOMEZenergy_progress
10/05/2018FinalKarol Zdancewiczprogress
02/07/2018FinalKarol Zdancewiczprogress
▾Documents — 531 on file (BIS + DOB NOW)
▸Plans & Drawings44
▸DOB NOWPlans/Sketch - Supported Scaffold12
09/05/2026M00127180-P5Request digital key ↗
09/05/2026M00127180-P4Request digital key ↗
09/05/2026M00127180-P3Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed8
09/05/2026M00127180-P4Request digital key ↗
09/05/2026M00127180-P3Request digital key ↗
09/05/2026M00127180-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/04/2026M00362071-P5Request digital key ↗
09/04/2026M00362071-I1Request digital key ↗
09/04/2026M00362071-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler6
09/04/2026M00362071-I1Request digital key ↗
09/04/2026M00362071-P2Request digital key ↗
09/04/2026M00362071-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence5
09/05/2026M00120899-I1Request digital key ↗
08/15/2026M00120899-P1Request digital key ↗
08/15/2026M00120899-P4Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/28/2026M00970965-I1Request digital key ↗
08/28/2026M00985525-I1Request digital key ↗
08/15/2026M00985542-I1Request digital key ↗
▸DOB NOWPlans/Sketch3
09/06/2026M00017745-I1Request digital key ↗
09/06/2026M00082918-I1Request digital key ↗
09/04/2026M00362083-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00362083-I1Request digital key ↗
▸Applications & Permits104
▸BISPLAN / WORK APPROVAL APPLICATION68
01/23/2025121203884Open ↗
06/21/2024121203884Open ↗
06/17/2024121203884Open ↗
Showing 3 of 68 on file for this type
▸BISWORK PERMIT APPLICATION31
12/20/2022121203884Open ↗
12/15/2022121203884Open ↗
04/22/2022123794796Open ↗
Showing 3 of 31 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
02/09/2022140741204Open ↗
Showing 1 of 3 on file for this type
▸BISINTENT TO REVOKE APPROVAL/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records9
▸BISZONING DIAGRAM4
08/06/2021121203884Open ↗
Showing 1 of 4 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
12/17/2021121203884Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
12/27/2021121203884Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/17/2021121203884Open ↗
▸Seals & Professional Certifications71
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/05/2026M00120899-P3Open ↗
09/05/2026M00120899-P2Open ↗
09/05/2026M00120899-I1Open ↗
Showing 3 of 30 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M00362083-S1Open ↗
09/02/2026M00362083-I1Open ↗
09/01/2026M00362071-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026M00362083-I1Open ↗
09/02/2026M00362083-I1Open ↗
09/01/2026M00082918-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
07/16/2021141003955Open ↗
06/07/2021141002965Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/16/2021141003955Open ↗
06/07/2021141002965Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
07/16/2021141003955Open ↗
06/07/2021141002965Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment30
▸BISSCHEDULE B - PLUMBING12
05/10/2023121203884Open ↗
01/11/2023121203884Open ↗
02/07/2022121203884Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE PERMITS7
03/24/2022121203884Open ↗
03/24/2022121203884Open ↗
03/24/2022121203884Open ↗
Showing 3 of 7 on file for this type
▸BISSTANDPIPE SYSTEMS3
01/10/2022121203884Open ↗
07/07/2021140725696Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
03/24/2022121203884Open ↗
03/24/2022121203884Open ↗
11/22/2021121203884Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
11/22/2021121203884Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
11/22/2021121203884Open ↗
▸Safety & Tenant Protection12
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN2
12/20/2022121203884Open ↗
10/28/2022141002965Open ↗
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTenant Protection Plan1
09/05/2026M00127180-P7Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
06/13/2024121203884Open ↗
04/22/2022123794796Open ↗
12/27/2021121203884Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
04/05/2024123794796Open ↗
01/13/2022121203884Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/05/2024123794796Open ↗
02/01/2022121203884Open ↗
▸BISLIGHTING CONTROLS2
04/05/2024123794796Open ↗
01/10/2022121203884Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
09/04/2026M00362083-S1Open ↗
09/04/2026M00362083-I1Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/10/2022121203884Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/10/2022121203884Open ↗
▸Inspections & Test Reports50
▸BISTECHNICAL REPORT: RESPONSIBILITY32
05/25/2023141003955Open ↗
01/12/2023121203884Open ↗
04/22/2022123794796Open ↗
Showing 3 of 32 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
12/23/2021121203884Open ↗
12/23/2021121203884Open ↗
Showing 2 of 3 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
04/05/2024123794796Open ↗
11/22/2021121203884Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
04/05/2024123794796Open ↗
11/22/2021121203884Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
11/22/2021121203884Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
01/10/2022121203884Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
06/13/2024121203884Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
11/22/2021121203884Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
01/10/2022121203884Open ↗
▸Approvals, Objections & Sign-offs38
▸BISSCHEDULE A - OCCUPANCY / USE20
01/23/2025121203884Open ↗
06/21/2024121203884Open ↗
06/17/2024121203884Open ↗
Showing 3 of 20 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
09/05/2024123794796Open ↗
06/04/2024123458793Open ↗
05/30/2024141002965Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSUPERSEDING LETTER3
02/09/2022121203884Open ↗
Showing 1 of 3 on file for this type
▸BISFINAL2
05/23/2024141002965Open ↗
04/05/2024123794796Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00017745-I1Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT8
07/16/2021141003955Open ↗
Showing 1 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
05/23/2024141002965Open ↗
03/14/2024123794796Open ↗
05/23/2023141003955Open ↗
Showing 3 of 6 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE6
12/20/2022121203884Open ↗
12/16/2022121203884Open ↗
Showing 2 of 6 on file for this type
▸Filing & Intake Forms59
▸BISADDITIONAL INFORMATION37
01/12/2023121203884Open ↗
11/29/2022121203884Open ↗
11/01/2022121203884Open ↗
Showing 3 of 37 on file for this type
▸BISEFILING COVER SHEET10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISBOROUGH INTAKE FORM7
01/12/2022121203884Open ↗
Showing 1 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
07/16/2021141003955Open ↗
Showing 1 of 5 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISMAINTENANCE INFORMATION2
04/05/2024123794796Open ↗
01/10/2022121203884Open ↗
▸BISBEST SQUAD - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 12
08/28/2026M00985525-I1Open ↗
08/15/2026M00985542-I1Open ↗
▸BISVESTIBULES1
01/10/2022121203884Open ↗