← Back
BuildNYC
MANHATTAN
212 WEST 93RD STREET
MANHATTAN · BIN 1033615
💬 Discuss this project
—Year Built
—Stories
—Building Class
C4-6AZoning
—Gross Floor Area
—Units
LL97 Covered0 Active Violations
7,550 sf lot · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsSupported scaffold with material hoist1 filing
RoofCongregation Shaare Zedek1 filing · 10 docs
BulkheadCongregation Shaare Zedek1p · 1 filing · 10 docs
Floor 8Sidewalk shed and overhead protection1p · 1 filing · 20 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Congregation Shaare Zedek4p · 3 filings · 20 docs
Floor 1Congregation Shaare Zedek5p · 5 filings · 20 docs
MezzanineCongregation Shaare Zedek4p · 2 filings · 20 docs
CellarCongregation Shaare Zedek5p · 3 filings · 20 docs
Sub-CellarCongregation Shaare Zedek3p · 2 filings · 20 docs
Site & exteriorLandsea Holdings Corporation3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Landsea Holdings2607/08/2026
212 West 93rd St2003/21/2026
HE2PD1107/08/2026
212 W 93rd St New York NY303/21/2026
212 W 93rd Street203/21/2026
212 W 93rd St Owner103/22/2026
OLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MG Engineering806/05/2024
Carmi Bee302/12/2024
Asif Jamil, RA1310/14/2021
Pace Engineering408/24/2021
KZ Engineering210/05/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Green Studio2603/21/2026
Design 21471503/21/2026
Synergy Building Consultants203/21/2026
Eurocelt Expediting803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rock Group NYScaffold1307/08/2026
Arsenal ScaffoldScaffold1203/21/2026
Platinum Services NYScaffold903/21/2026
Brend RestorationScaffold603/21/2026
Retail Project MangementGeneral Contractor507/08/2026
Fluid MechanicsPlumbing307/08/2026
RRP PlumbingFire Protection207/08/2026
Precision Hoist & Scaffo*Scaffold207/08/2026
RRP PlumbingPlumbing107/08/2026
Peter GerazounisElectrical103/21/2026
Roma ElectricElectrical103/22/2026
Roma ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Amaracon Testing & Inspec5842606/05/2024
Vibranalysis Inc., Dba VT6864210/20/2023
Building Lifecycle
All (172)Filed (30)Permit Issued (29)Signed Off (8)Violation (52)Inspection (8)Objection (26)Special Inspection (19)
08/29/2024
Signed off — Alteration
Installation of a gas boiler as per plans.
M00362083-I1
08/05/2024
Signed off — Alteration
Installation of a gas boiler as per plans.
M00362083-S1
06/12/2024
Signed off — Alteration
Congregation Shaare Zedek: Modification sprinkler/ plumbing system as per plans filed herewith. Filed in conjunction with NB# 121203884.:
M00362071-I1
06/05/2024
Filed — Alteration
Congregation Shaare Zedek: Modification sprinkler/ plumbing system as per plans filed herewith. Filed in conjunction with NB# 121203884.:
M00362071-P5
06/05/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/05/2024
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
06/03/2024
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
05/29/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
05/22/2024
Filed — Alteration
Congregation Shaare Zedek: Modification sprinkler/ plumbing system as per plans filed herewith. Filed in conjunction with NB# 121203884.:
M00362071-P4
05/08/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/26/2024
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
04/11/2024
Filed — Alteration
Congregation Shaare Zedek: Modification sprinkler/ plumbing system as per plans filed herewith. Filed in conjunction with NB# 121203884.:
M00362071-P3
04/10/2024
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
03/15/2024
Filed — Alteration
Congregation Shaare Zedek: Modification sprinkler/ plumbing system as per plans filed herewith. Filed in conjunction with NB# 121203884.:
M00362071-P2
03/15/2024
Permit issued — Boiler Equipment
M00362083-S1-BE
02/28/2024
Filed — Alteration
Congregation Shaare Zedek: Modification sprinkler/ plumbing system as per plans filed herewith. Filed in conjunction with NB# 121203884.:
M00362071-P1
02/27/2024
Objection raised — Other
02/27/2024
Objection resolved — Addressed
02/23/2024
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
02/12/2024
Filed — No Work
M00985542-I1
02/12/2024
Filed — No Work
M00970965-I1
02/12/2024
Filed — No Work
M00985525-I1
02/09/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/22/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
01/11/2024
Inspection — Fail-Final SP - Up to 9 Requested Floors
Fail
View inspection ↗
01/04/2024
Special inspection requirement — Public Assembly Emergency Lighting
JUAN GOMEZ
12/04/2023
Special inspection requirement — Public Assembly Emergency Lighting
JUAN GOMEZ
11/21/2023
Objection resolved — Addressed
11/21/2023
Objection resolved — Addressed
11/21/2023
Objection resolved — Addressed
11/21/2023
Objection resolved — Addressed
11/16/2023
Objection resolved — Addressed
11/16/2023
Objection resolved — Addressed
11/08/2023
Objection resolved — Addressed
11/08/2023
Objection resolved — Addressed
11/08/2023
Objection resolved — Addressed
11/08/2023
Objection resolved — Addressed
11/08/2023
Objection resolved — Addressed
11/08/2023
Objection resolved — Addressed
11/02/2023
Permit issued — Plumbing
M00362071-I1-EW-SP
11/01/2023
Permit issued — Plumbing
M00362071-I1-PL
10/27/2023
Objection raised — Fire_Protection
10/27/2023
Objection raised — Fire_Protection
10/27/2023
Objection raised — Admin
10/27/2023
Objection raised — Scope
10/27/2023
Objection raised — Other
10/27/2023
Objection raised — Scope
10/27/2023
Objection raised — Energy
10/27/2023
Objection raised — Scope
10/27/2023
Objection raised — Structural
10/27/2023
Objection raised — Scope
10/27/2023
Objection raised — Mechanical
10/27/2023
Objection raised — Other
10/20/2023
Filed — Alteration
Installation of a gas boiler as per plans.
M00362083-S1
10/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
10/17/2023
Special inspection requirement — Heating Systems
JUAN GOMEZ
09/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/05/2023
Permit issued — Sprinklers
M00362071-I1-EW-SP
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 172 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offFluid Mechanics03/15/2024
DOB NOWSprinklersSigned-offFluid Mechanics11/02/2023
DOB NOWPlumbingSigned-offFluid Mechanics11/01/2023
DOB NOWSprinklersSigned-offRalph W. Landolfi JR09/05/2023
DOB NOWMechanical SystemsSigned-offRetail Project Mangement05/08/2023
DOB NOWPlumbingSigned-offRRP Plumbing10/24/2022
DOB NOWSprinklersSigned-offRalph W. Landolfi JR10/24/2022
DOB NOWMechanical SystemsSigned-offRetail Project Mangement10/18/2022
DOB NOWMechanical SystemsSigned-offRetail Project Mangement03/28/2022
DOB NOWSidewalk ShedSigned-offPlatinum Services NY10/21/2021
DOB NOWSidewalk ShedSigned-offPlatinum Services NY10/21/2021
DOB NOWConstruction FenceSigned-offPlatinum Services NY10/19/2021
DOB NOWSupported ScaffoldSigned-offBrend Restoration07/22/2021
DOB NOWSidewalk ShedSigned-offRock Group NY09/30/2020
DOB NOWConstruction FenceSigned-offRock Group NY09/28/2020
DOB NOWSidewalk ShedSigned-offRock Group NY09/28/2020
DOB NOWConstruction FenceSigned-offPrecision Hoist & Scaffo*09/21/2020
DOB NOWSupported ScaffoldSigned-offBrend Restoration07/27/2020
DOB NOWSidewalk ShedSigned-offRock Group NY10/25/2019
DOB NOWSupported ScaffoldSigned-offRock Group NY10/25/2019
DOB NOWConstruction FenceSigned-offRock Group NY10/10/2019
DOB NOWConstruction FenceSigned-offRock Group NY01/22/2019
DOB NOWConstruction FenceSigned-offPrecision Hoist & Scaffo*10/09/2018
DOB NOWSupported ScaffoldSigned-offArsenal Scaffold06/12/2018
DOB NOWSidewalk ShedSigned-offArsenal Scaffold05/29/2018
DOB NOWSidewalk ShedSigned-offArsenal Scaffold03/26/2018
DOB NOWSidewalk ShedSigned-offArsenal Scaffold03/26/2018
DOB NOWSidewalk ShedSigned-offArsenal Scaffold02/13/2018
DOB NOWSupported ScaffoldSigned-offArsenal Scaffold02/13/2018
BISOTISSUEDRetail Project Mangement05/08/2023
BIS—ISSUEDThe Vorea Construction Co12/20/2022
BISOTISSUEDRetail Project Mangement10/18/2022
BISOTISSUEDRetail Project Mangement04/22/2022
BIS—ISSUEDThe Vorea Construction Co02/08/2022
BISPLISSUEDGW Mechanical02/02/2022
BIS—ISSUEDThe Vorea Construction Co01/12/2022
BISOTISSUEDThe Vorea Construction Co10/18/2021
BISOTISSUEDThe Vorea Construction Co07/22/2021
BISPLISSUEDGW Mechanical02/03/2021
BISSDISSUEDPhoenix Plumbing & Mechanical01/21/2021
+ 22 more permits on file
16 projects · most recent 08/19/2026
General Wiring
FiledStatusContractorScope
08/19/2026CompleteNortheast Electrical Contracting—
06/12/2024CompleteRoma Electric—
02/01/2024CompleteL&B Electrical InternationalGeneral Wiring
02/22/2023CompletePdi NYC ElectricGeneral Wiring
12/20/2022CompletePdi NYC Electric2 meters, 2 new_meters
12/10/2021CompleteRainbow Electric Co—
11/18/2021CancelledTrincity ElectricGeneral Wiring
09/25/2020CompleteJam Electrical—
07/07/2020CompleteStar Electrical Contractors—
02/10/2020CompletePdi NYC Electric1 meters, 1 new_meters
01/30/2020CompleteIlluminous Electric—
05/07/2019CancelledOhm Pro Electl Construction—
03/18/2019CancelledOhm Pro Electl Construction1 meters, 1 new_meters
02/04/2019CompleteTop Shelf Electric—
09/12/2018CompleteRoma ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/05/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/29/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
05/08/2024Pass-Final Boiler Equipment InspectionPassView ↗
02/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/22/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
01/11/2024Fail-Final SP - Up to 9 Requested FloorsFailView ↗
09/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
06/05/2024Sprinkler SystemsCONNIE PISANIspecial
06/03/2024Sprinkler SystemsCONNIE PISANIspecial
04/26/2024Sprinkler SystemsCONNIE PISANIspecial
04/10/2024Sprinkler SystemsCONNIE PISANIspecial
02/23/2024Sprinkler SystemsCONNIE PISANIspecial
01/04/2024Public Assembly Emergency LightingJUAN GOMEZprogress
12/04/2023Public Assembly Emergency LightingJUAN GOMEZprogress
10/17/2023Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
10/17/2023Heating SystemsJUAN GOMEZspecial
06/24/2020HVAC and service water heating system controls JUAN GOMEZenergy_progress
06/24/2020HVAC and service water heating equipment JUAN GOMEZenergy_progress
06/24/2020Mechanical SystemsJUAN GOMEZspecial
06/24/2020Heating SystemsJUAN GOMEZspecial
06/24/2020FinalJUAN GOMEZprogress
06/24/2020HVAC insulation and sealing JUAN GOMEZenergy_progress
06/24/2020Maintenance informationJUAN GOMEZenergy_progress
06/24/2020Shutoff dampersJUAN GOMEZenergy_progress
10/05/2018FinalKarol Zdancewiczprogress
02/07/2018FinalKarol Zdancewiczprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Congregation Shaare ZedekOtherSub-cellar, Cellar, Floors 1, 2, Mezzanine, Roof
Project M00362071 Alteration · LOC Issued · 08/20/2020
Project M00362083 Alteration · LOC Issued · 08/20/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 531 on file (BIS + DOB NOW)
▸Plans & Drawings44
▸DOB NOWPlans/Sketch - Supported Scaffold12
09/05/2026M00127180-P5Request digital key ↗
09/05/2026M00127180-P4Request digital key ↗
09/05/2026M00127180-P3Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed8
09/05/2026M00127180-P4Request digital key ↗
09/05/2026M00127180-P3Request digital key ↗
09/05/2026M00127180-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/04/2026M00362071-P5Request digital key ↗
09/04/2026M00362071-I1Request digital key ↗
09/04/2026M00362071-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler6
09/04/2026M00362071-I1Request digital key ↗
09/04/2026M00362071-P2Request digital key ↗
09/04/2026M00362071-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence5
09/05/2026M00120899-I1Request digital key ↗
08/15/2026M00120899-P4Request digital key ↗
08/15/2026M00120899-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/28/2026M00970965-I1Request digital key ↗
08/28/2026M00985525-I1Request digital key ↗
08/15/2026M00985542-I1Request digital key ↗
▸DOB NOWPlans/Sketch3
09/06/2026M00017745-I1Request digital key ↗
09/06/2026M00082918-I1Request digital key ↗
09/04/2026M00362083-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00362083-I1Request digital key ↗
▸Applications & Permits104
▸BISPLAN / WORK APPROVAL APPLICATION68
01/23/2025121203884Open ↗
06/21/2024121203884Open ↗
06/17/2024121203884Open ↗
Showing 3 of 68 on file for this type
▸BISWORK PERMIT APPLICATION31
12/20/2022121203884Open ↗
12/15/2022121203884Open ↗
04/22/2022123794796Open ↗
Showing 3 of 31 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
02/09/2022140741204Open ↗
Showing 1 of 3 on file for this type
▸BISINTENT TO REVOKE APPROVAL/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records9
▸BISZONING DIAGRAM4
08/06/2021121203884Open ↗
Showing 1 of 4 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
12/17/2021121203884Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
12/27/2021121203884Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/17/2021121203884Open ↗
▸Seals & Professional Certifications71
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/05/2026M00120899-P3Open ↗
09/05/2026M00120899-P2Open ↗
09/05/2026M00120899-I1Open ↗
Showing 3 of 30 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M00362083-S1Open ↗
09/02/2026M00362083-I1Open ↗
09/01/2026M00362071-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026M00362083-I1Open ↗
09/02/2026M00362083-I1Open ↗
09/01/2026M00082918-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
07/16/2021141003955Open ↗
06/07/2021141002965Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/16/2021141003955Open ↗
06/07/2021141002965Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
07/16/2021141003955Open ↗
06/07/2021141002965Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment30
▸BISSCHEDULE B - PLUMBING12
05/10/2023121203884Open ↗
01/11/2023121203884Open ↗
02/07/2022121203884Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE PERMITS7
03/24/2022121203884Open ↗
03/24/2022121203884Open ↗
03/24/2022121203884Open ↗
Showing 3 of 7 on file for this type
▸BISSTANDPIPE SYSTEMS3
01/10/2022121203884Open ↗
07/07/2021140725696Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
03/24/2022121203884Open ↗
03/24/2022121203884Open ↗
11/22/2021121203884Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
11/22/2021121203884Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
11/22/2021121203884Open ↗
▸Safety & Tenant Protection12
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN2
12/20/2022121203884Open ↗
10/28/2022141002965Open ↗
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTenant Protection Plan1
09/05/2026M00127180-P7Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
06/13/2024121203884Open ↗
04/22/2022123794796Open ↗
12/27/2021121203884Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
04/05/2024123794796Open ↗
01/13/2022121203884Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/05/2024123794796Open ↗
02/01/2022121203884Open ↗
▸BISLIGHTING CONTROLS2
04/05/2024123794796Open ↗
01/10/2022121203884Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
09/04/2026M00362083-S1Open ↗
09/04/2026M00362083-I1Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/10/2022121203884Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/10/2022121203884Open ↗
▸Inspections & Test Reports50
▸BISTECHNICAL REPORT: RESPONSIBILITY32
05/25/2023141003955Open ↗
01/12/2023121203884Open ↗
04/22/2022123794796Open ↗
Showing 3 of 32 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
12/23/2021121203884Open ↗
12/23/2021121203884Open ↗
Showing 2 of 3 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
04/05/2024123794796Open ↗
11/22/2021121203884Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
04/05/2024123794796Open ↗
11/22/2021121203884Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
11/22/2021121203884Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
01/10/2022121203884Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
06/13/2024121203884Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
11/22/2021121203884Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
01/10/2022121203884Open ↗
▸Approvals, Objections & Sign-offs38
▸BISSCHEDULE A - OCCUPANCY / USE20
01/23/2025121203884Open ↗
06/21/2024121203884Open ↗
06/17/2024121203884Open ↗
Showing 3 of 20 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
09/05/2024123794796Open ↗
06/04/2024123458793Open ↗
05/30/2024141002965Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSUPERSEDING LETTER3
02/09/2022121203884Open ↗
Showing 1 of 3 on file for this type
▸BISFINAL2
05/23/2024141002965Open ↗
04/05/2024123794796Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00017745-I1Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT8
07/16/2021141003955Open ↗
Showing 1 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
05/23/2024141002965Open ↗
03/14/2024123794796Open ↗
05/23/2023141003955Open ↗
Showing 3 of 6 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE6
12/20/2022121203884Open ↗
12/16/2022121203884Open ↗
Showing 2 of 6 on file for this type
▸Filing & Intake Forms59
▸BISADDITIONAL INFORMATION37
01/12/2023121203884Open ↗
11/29/2022121203884Open ↗
11/01/2022121203884Open ↗
Showing 3 of 37 on file for this type
▸BISEFILING COVER SHEET10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISBOROUGH INTAKE FORM7
01/12/2022121203884Open ↗
Showing 1 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
07/16/2021141003955Open ↗
Showing 1 of 5 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISMAINTENANCE INFORMATION2
04/05/2024123794796Open ↗
01/10/2022121203884Open ↗
▸BISBEST SQUAD - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 12
08/28/2026M00985525-I1Open ↗
08/15/2026M00985542-I1Open ↗
▸BISVESTIBULES1
01/10/2022121203884Open ↗