← Back
BuildNYC
Public elementary, junior or senior high
Public School #59
2120 QUARRY ROAD · BIN 2011852
💬 Discuss this project
1973Year Built
1Stories
W1Building Class
C4-4AZoning
7,400 sfGross Floor Area
1Units
0 Active Violations
Public elementary, junior or senior high · Owner of record: NYC Housing Authority · 14,086 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPublic School #59Under Construction49p · 3 filings · 16 docs
Floor 1Public School #59Under Construction34p · 2 filings · 16 docs
Site & exteriorP.S. 59X Annex, Public School #5929p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority2709/13/2026
New York City Housing Authority1103/21/2026
Housing Authority103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AECOM205/13/2026
AECOM USA405/23/2024
AK Consulting Services403/15/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AECOM USA1003/21/2026
AK Consulting Services803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ash ContractingScaffold1107/08/2026
Ash ContractingGeneral Contractor507/08/2026
Varsity Plumbing and HeatingPlumbing407/08/2026
Clairmont Electrical ContractingElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106505/13/2026
Twin Peaks317105/16/2023
Building Lifecycle
All (75)Filed (10)Permit Issued (15)Violation (31)Inspection (1)Special Inspection (18)
05/20/2026
Permit issued — General Construction
X00485645-I1-GC
05/18/2026
Special inspection requirement — Insulation placement and R values
GEORGE GHEBRYAL
05/18/2026
Special inspection requirement — Fenestration air leakage
GEORGE GHEBRYAL
05/18/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
05/18/2026
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
05/18/2026
Special inspection requirement — Masonry
GEORGE GHEBRYAL
05/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
05/18/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
05/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
GEORGE GHEBRYAL
05/13/2026
Filed — Alteration
OT: REMOVE EXISTING ROOFING / FLASHING AND PROVIDE NEW. REMOVE EXISTING CEILINGS AND PROVIDE NEW. REMOVE WINDOWS PROVIDE NEW. MH: TEMP. REMOVE/ REINSTALL EXISITING MECHANICAL EQUIP. TO ALLOW FOR WORK. NO CHANGE IN USE OCCUPANCY OR EGRESS.
X00485645-P3
06/25/2025
Permit issued — Plumbing
X00486239-I1-PL
05/28/2025
Permit issued — Sidewalk Shed
X00929946-I1-SH
05/21/2025
Permit issued — Mechanical Systems
X00485645-I1-GC
05/21/2025
Permit issued — Construction Fence
X00929930-I1-FN
05/16/2025
Permit issued — Mechanical Systems
X00485645-I1-GC
05/16/2025
Permit issued — Construction Fence
X00929930-I1-FN
06/20/2024
Permit issued — Plumbing
X00486239-I1-PL
05/23/2024
Filed — Alteration
OT: REMOVE EXISTING ROOFING / FLASHING AND PROVIDE NEW. REMOVE EXISTING CEILINGS AND PROVIDE NEW. REMOVE WINDOWS PROVIDE NEW. MH: TEMP. REMOVE/ REINSTALL EXISITING MECHANICAL EQUIP. TO ALLOW FOR WORK. NO CHANGE IN USE OCCUPANCY OR EGRESS.
X00485645-P2
05/16/2024
Permit issued — Sidewalk Shed
X00929946-I1-SH
05/15/2024
Permit issued — General Construction
X00485645-I1-GC
05/15/2024
Permit issued — Construction Fence
X00929930-I1-FN
04/30/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/15/2024
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 59X AT 2120 QUARRY ROAD, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00929930-P1
03/15/2024
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED FOR PS 59X AT 2120 QUARRY ROAD, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00929946-P1
09/13/2023
Permit issued — Sidewalk Shed
X00929946-I1-SH
09/13/2023
Permit issued — Construction Fence
X00929930-I1-FN
09/12/2023
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED FOR PS 59X AT 2120 QUARRY ROAD, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00929946-I1
09/12/2023
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 59X AT 2120 QUARRY ROAD, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00929930-I1
07/12/2023
Permit issued — Mechanical Systems
X00485645-I1-GC
06/26/2023
Permit issued — Plumbing
X00486239-I1-PL
05/16/2023
Filed — Alteration
OT: REMOVE EXISTING ROOFING / FLASHING AND PROVIDE NEW. REMOVE EXISTING CEILINGS AND PROVIDE NEW. REMOVE WINDOWS PROVIDE NEW. MH: TEMP. REMOVE/ REINSTALL EXISITING MECHANICAL EQUIP. TO ALLOW FOR WORK. NO CHANGE IN USE OCCUPANCY OR EGRESS.
X00485645-P1
05/16/2023
Filed — Alteration
PL: Remove Existing Roof Drains and Provide New. No change in Use, Occupancy, or Egress.
X00486239-P1
05/16/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
GEORGE GHEBRYAL
05/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIORGI KHARDZEISHVILI
05/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
05/16/2023
Special inspection requirement — Masonry
GEORGE GHEBRYAL
05/16/2023
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
05/16/2023
Special inspection requirement — Final
05/16/2023
Special inspection requirement — Insulation placement and R values
GEORGE GHEBRYAL
05/16/2023
Special inspection requirement — Fenestration air leakage
GEORGE GHEBRYAL
05/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
05/10/2021
Filed — Alteration
OT: REMOVE EXISTING ROOFING / FLASHING AND PROVIDE NEW. REMOVE EXISTING CEILINGS AND PROVIDE NEW. REMOVE WINDOWS PROVIDE NEW. MH: TEMP. REMOVE/ REINSTALL EXISITING MECHANICAL EQUIP. TO ALLOW FOR WORK. NO CHANGE IN USE OCCUPANCY OR EGRESS.
X00485645-I1
05/05/2021
Filed — Alteration
PL: Remove Existing Roof Drains and Provide New. No change in Use, Occupancy, or Egress.
X00486239-I1
04/25/2018
Violation issued (ECB, closed)
Construction
06/02/2017
Violation issued (ECB, closed)
Construction
10/07/2016
Violation issued (ECB, closed)
Construction
09/04/2012
Violation issued (ECB, closed)
Construction
09/02/2011
Violation issued (ECB, closed)
Unknown
09/02/2011
Violation issued (ECB, closed)
Construction
09/02/2011
Violation issued (ECB, closed)
Construction
05/13/2010
Violation issued (ECB, closed)
Construction
05/13/2010
Violation issued (ECB, closed)
Construction
05/13/2010
Violation issued (ECB, closed)
Construction
05/13/2010
Violation issued (ECB, closed)
Construction
05/13/2010
Violation issued (ECB, closed)
Unknown
03/19/2009
Violation issued (ECB, closed)
Unknown
02/02/2005
Violation issued (ECB, closed)
Construction
02/02/2005
Violation issued (ECB, closed)
Construction
02/02/2005
Violation issued (ECB, closed)
Construction
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAsh Contracting05/20/2026
DOB NOWPlumbingSigned-offVarsity Plumbing and Heating06/25/2025
DOB NOWSidewalk ShedPermit IssuedAsh Contracting05/28/2025
DOB NOWMechanical SystemsPermit IssuedAsh Contracting05/21/2025
DOB NOWConstruction FencePermit IssuedAsh Contracting05/21/2025
DOB NOWMechanical SystemsPermit IssuedAsh Contracting05/16/2025
DOB NOWConstruction FencePermit IssuedAsh Contracting05/16/2025
DOB NOWPlumbingSigned-offVarsity Plumbing and Heating06/20/2024
DOB NOWSidewalk ShedPermit IssuedAsh Contracting05/16/2024
DOB NOWGeneral ConstructionPermit IssuedAsh Contracting05/15/2024
DOB NOWConstruction FencePermit IssuedAsh Contracting05/15/2024
DOB NOWSidewalk ShedPermit IssuedAsh Contracting09/13/2023
DOB NOWConstruction FencePermit IssuedAsh Contracting09/13/2023
DOB NOWMechanical SystemsPermit IssuedAsh Contracting07/12/2023
DOB NOWPlumbingSigned-offVarsity Plumbing and Heating06/26/2023
BISOTISSUEDPositive Electric Associates07/06/2012
BISOTISSUEDPositive Electric Associates07/06/2012
BISOTISSUEDPositive Electric Associates07/06/2012
BISOTISSUEDPositive Electric Associates05/05/2011
BISOTISSUEDPositive Electric Associates05/05/2011
BISPLISSUEDVarsity Plumbing and Heating01/22/2008
BISMHISSUEDCentral Mechanical Systems08/30/2006
BISPLISSUEDLafata Corallo P & H08/30/2006
BISEQRE-ISSUEDYork Scaffold Equipment08/30/2006
BISEQISSUEDLiberty Architectural Products06/03/2005
BISOTISSUEDLiberty Architectural Products05/23/2005
BISEQISSUEDLiberty Architectural Products05/23/2005
BISEQISSUEDLiberty Architectural Products05/23/2005
BISOTISSUEDLiberty Architectural Products05/23/2005
1 project · most recent 05/13/2026
Ventilation Systems
FiledStatusContractorScope
05/13/2026Permit IssuedAsh ContractingVentilation Systems
1 project · most recent 05/16/2023
Storm
FiledStatusContractorScope
05/16/2023Signed-offVarsity Plumbing and HeatingStorm
1 project · most recent 09/30/2023
FiledStatusContractorScope
09/30/2023Permit IssuedClairmont Electrical Contracting—
2 projects · most recent 03/15/2024
Fence Sidewalk Shed
FiledStatusContractorScope
03/15/2024Permit IssuedAsh ContractingFence
03/15/2024Permit IssuedAsh ContractingSidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/30/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
05/18/2026Insulation placement and R valuesGEORGE GHEBRYALenergy_progress
05/18/2026Fenestration air leakageGEORGE GHEBRYALenergy_progress
05/18/2026Post-installed AnchorsGEORGE GHEBRYALspecial
05/18/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
05/18/2026Mechanical SystemsGEORGE GHEBRYALspecial
05/18/2026MasonryGEORGE GHEBRYALspecial
05/18/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
05/18/2026FinalGEORGE GHEBRYALprogress
05/18/2026Fenestration and door U-factor and product ratingsGEORGE GHEBRYALenergy_progress
05/16/2023Fenestration and door U-factor and product ratingsGEORGE GHEBRYALenergy_progress
05/16/2023Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
05/16/2023Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
05/16/2023MasonryGEORGE GHEBRYALspecial
05/16/2023Mechanical SystemsGEORGE GHEBRYALspecial
05/16/2023Final—progress
05/16/2023Insulation placement and R valuesGEORGE GHEBRYALenergy_progress
05/16/2023Fenestration air leakageGEORGE GHEBRYALenergy_progress
05/16/2023Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 59X AnnexEducation—
Project X00929946 Alteration · Permit Entire · 09/12/2023
Public School #59EducationFloor 1, Roof
Project X00929930 Alteration · Permit Entire · 09/12/2023
Project X00485645 Alteration · Permit Issued · 05/10/2021
Project X00486239 Alteration · Permit Entire · 05/05/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/25/2026X00486239-P1Request digital key ↗
08/25/2026X00486239-P2Request digital key ↗
08/25/2026X00486239-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/22/2026X00929946-I1Open ↗
08/22/2026X00929946-P1Open ↗
08/21/2026X00929930-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026X00485645-I1Open ↗
09/01/2026X00485645-I1Open ↗
09/01/2026X00485645-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026X00485645-I1Open ↗
09/01/2026X00485645-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026X00485645-I1Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/22/2026X00929946-I1Open ↗
08/22/2026X00929946-P1Open ↗
08/13/2026X00929930-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/13/2026X00486239-I1Open ↗
08/13/2026X00485645-I1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026X00485645-P3Open ↗
08/13/2026X00485645-P1Open ↗
08/13/2026X00485645-P2Open ↗
Showing 3 of 4 on file for this type