← Back
BuildNYC
Over six families without stores
2120 TIEBOUT AVENUE
BRONX · BIN 2013304
💬 Discuss this project
1927Year Built
5Stories
C1Building Class
R7-1Zoning
63,750 sfGross Floor Area
75Units
LL97 CoveredRent Stabilized461 Active Violations ▸
Over six families without stores · Owner of record: 2120 Tiebout · 21,910 sf lot · 2.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 22p · 1 filing · 4 docs
Floor 1
CellarBoiler and tank replacement16p · 1 filing · 20 docs
Site & exteriorSidewalk shedUnder Construction6p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Citiskyline Realty3207/08/2026
2120 Tiebout1103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/03/2015$10.4M—TIEBOUT ASSOCIATES LLC → 2120 TIEBOUT LLC$164/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M Engineering Design & Inspection105/30/2024
New York & Company508/09/2021
MW Professional Engineering106/17/2020
Ashraf101/20/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design103/21/2026
New York & Company503/21/2026
MW Professional Engineering P203/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dynamic Hoisting ScaffScaffold709/09/2026
Shah Group EnterprisesScaffold303/21/2026
Robin Electrical CoElectrical203/21/2026
DMT Plumbing & HeatingPlumbing207/08/2026
DMT Plumbing & Heating*specialty_contractor107/08/2026
Zone Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851308/09/2021
MW Professional Engineering570106/17/2020
Building Lifecycle
09/08/2026
Permit renewed — Sidewalk Shed
Renewed without changes
X01050293-I1-SH
08/20/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 5th ROOM FROM EAST AT NORTH…
HPD violation · open
08/20/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PARQUET WOOD TILES AT FLOOR (SPLINTERING) IN THE 3rd ROOM FROM…
HPD violation · open
08/20/2026
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE,…
HPD violation · open
08/20/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH IN THE BATHROOM LOCATED AT APT E2, 1st STORY,…
HPD violation · open
242 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedDynamic Hoisting Scaff09/08/2026
DOB NOWSidewalk ShedPermit IssuedDynamic Hoisting Scaff03/17/2026
DOB NOWSidewalk ShedPermit IssuedDynamic Hoisting Scaff07/15/2025
DOB NOWSidewalk ShedPermit IssuedDynamic Hoisting Scaff08/06/2024
DOB NOWSidewalk ShedPermit IssuedDynamic Hoisting Scaff05/30/2024
DOB NOWGeneral ConstructionSigned-offDMT Plumbing & Heating*10/25/2021
DOB NOWBoiler EquipmentSigned-offDMT Plumbing & Heating05/25/2021
DOB NOWPlumbingSigned-offDMT Plumbing & Heating Co05/20/2021
DOB NOWPlumbingSigned-offZone Plumbing & Heating07/02/2020
DOB NOWBoiler EquipmentSigned-offDMT Plumbing & Heating03/11/2020
DOB NOWPlumbingSigned-offDMT Plumbing & Heating Co03/04/2020
DOB NOWSidewalk ShedPermit IssuedShah Group Enterprises01/24/2019
BISOTISSUEDDK Builders07/22/2020
BISOTISSUEDHonor Construction03/17/2020
BISOTISSUEDZ Tech Building Solutions05/21/2019
BISOTISSUEDOZ Bosph Construction01/28/2019
BISOTISSUEDOZ Bosph Construction09/18/2018
BISPLISSUEDAll Hour Sewer Service Co08/21/2018
BISOTISSUEDOZ Bosph Construction07/26/2018
BISPLISSUEDAAA Total Plumbing05/22/2018
BISOTISSUEDHonor Construction05/18/2018
BISOTISSUEDOZ Bosph Construction05/04/2018
BISOTISSUEDOZ Bosph Construction05/04/2018
BISOTISSUEDUltimate Renovations & Co02/22/2018
BISPLISSUEDAAA Total Plumbing11/06/2017
BISOTISSUEDOZ Bosph Construction10/27/2017
BISPLISSUEDG. & S. Plumbing & Heating Co10/20/2017
BISOTISSUEDZ Tech Building Solutions08/09/2017
BISPLISSUEDZone Plumbing & Heating05/19/2017
BISOTISSUEDHonor Construction05/19/2017
BISPLISSUEDAAA Total Plumbing04/26/2017
BISOTISSUEDOZ Bosph Construction04/04/2017
BISPLISSUEDAAA Total Plumbing01/13/2017
BISOTISSUEDAlpha Restoration & Cons12/15/2016
BISOTISSUEDAlpha Restoration & Cons11/10/2016
BISOTISSUEDAlpha Restoration & Cons09/01/2016
BISPLISSUEDDMT Plumbing & Heating09/05/2012
BISOTISSUEDG. Bauer06/03/2004
5 projects · most recent 07/06/2020
General Wiring
FiledStatusContractorScope
07/06/2020CompletePower Surge ElectricGeneral Wiring
03/15/2020CompleteHI-Lights Electric—
01/20/2019Permit IssuedRichard Neu—
07/31/2018CompletePower Surge ElectricGeneral Wiring
06/05/2018Permit IssuedPower Surge ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/29/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/22/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/05/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/22/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/18/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
07/20/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
07/16/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
07/16/2021Heating SystemsLOUIS ARENAspecial
07/16/2021Maintenance informationLOUIS ARENAenergy_progress
07/16/2021HVAC and service water heating equipment LOUIS ARENAenergy_progress
07/16/2021HVAC and service water heating system controls LOUIS ARENAenergy_progress
05/25/2021FinalLOUIS ARENAprogress
05/25/2021Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
05/25/2021Fire-Resistance Rated ConstructionLOUIS ARENAprogress
05/03/2021HVAC and service water heating equipment LOUIS ARENAenergy_progress
05/03/2021HVAC and service water heating system controls LOUIS ARENAenergy_progress
05/03/2021Maintenance informationLOUIS ARENAenergy_progress
05/03/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
05/03/2021Heating SystemsLOUIS ARENAspecial
343 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account