Condo, residential unit in elevator building
The 2121 Shore Condominium
2121 SHORE PARKWAY · BIN 3187763
💬 Discuss this project
1963Year Built
6Stories
R4Building Class
R6Zoning
87,805 sfGross Floor Area
110Units
LL97 CoveredRent Stabilized44 Open Violations ▸FISP: SWARMPFDNY Report ↗
Condo, residential unit in elevator building · Owner of record: 2121 SHORE PARKWAY CONDOMINIUM · 20,000 sf lot · 4.39 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction13p · 7 filings · 20 docs
BulkheadUnder Construction1p · 1 filing · 7 docs
Floor 7Under Construction4p · 2 filings · 10 docs
Floor 6Under Construction1 filing · 3 docs
Floor 5Under Construction4p · 2 filings · 9 docs
Floor 4Under Construction4p · 2 filings · 9 docs
Floor 3Under Construction7p · 3 filings · 16 docs
Floor 2Under Construction4p · 2 filings · 9 docs
Floor 1Under Construction1 filing · 3 docs
CellarUnder Construction5p · 1 filing · 5 docs
Basement3p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2121 SHORE CONDOMINIUM5607/08/2026
T-MOBILE307/08/2026
2121 SHORE PARKWAY CONDOMINIUM1803/22/2026
2121 SHORE PARKWAY103/22/2026
2121 SHOR EPKWY CONDOMINU103/22/2026
SHORE PARKWAY CONDOMINIUM103/22/2026
2121 SHORE CONDO C O ADVANCE203/21/2026
2121 SHORE CONDO C O METRO MAN703/21/2026
METRO MANAGEMENT DEV103/21/2026
MARVIN GOLD MANAGEMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION603/21/2026
CONSTRUCTION PERMIT SERVICES303/21/2026
ARGO REAL ESTATE103/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
BASIC GROUPS403/21/2026
JON PAUL DESIGN & CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKY TECH REST CORPGeneral Contractor507/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor404/09/2026
BEYOND BUILDING INCGeneral Contractor203/21/2026
JUNO CONTRACTING CORPGeneral Contractor204/09/2026
EVEREST SCAFFOLDING INCGeneral Contractor203/21/2026
J Y ELECTRIC INCElectrical103/22/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
VIALVA, JOSEPHElectrical103/21/2026
CUBE BUILDERS GROUP NYGeneral Contractor104/09/2026
CURRENT COMMUNICATIONS LLGeneral Contractor107/08/2026
ECI CONTRACTING GROUP INCGeneral Contractor104/09/2026
GOTHAM COMMUNICATIONS LLCGeneral Contractor107/08/2026
NEW JM HOME IMPROVMENT INGeneral Contractor104/09/2026
BECKER, CHARLESElectrical103/21/2026
GENERAL PLUMBING CORPPlumbing107/08/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
FILARDI, JAMESElectrical103/21/2026
GREGORY PAPANTONIOUElectrical103/21/2026
JOSEPH KASHINSKYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SWL ENGINEERING INSPECTIO6912211/04/2025
NIC DESIGN INC9758210/15/2025
MOHAMMAD AHEAD - PROFESSI9286109/24/2025
CD ARCHITECT STUDIO, LLP2573102/12/2025
SCHERER DESIGN GROUP7921208/03/2023
ALAN MARGOLIN & ASSOC423106/22/2022
CMSC, INC6098212/22/2021
RMR INSPECTION GROUP LLC1977204/28/2021
Building Lifecycle
All (181)Filed (19)Permit Issued (17)Signed Off (6)Facade (FISP) (13)Violation (60)Inspection (4)Objection (36)Special Inspection (26)
09/30/2026
Permit issued — General Construction
B01249006-I1-GC
05/21/2026
Violation issued (HPD, open)
A
04/06/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
02/25/2026
Permit issued — Structural
B01284888-I1-GC-CX
01/29/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/29/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/26/2025
Signed off — Alteration
RENOVATION 3RD FLOOR APARTMENT#3A OF THE EXISTING 6 STORY BUILDING. NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT. CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01266648-I1
11/25/2025
Objection raised — Other
11/25/2025
Objection resolved — Addressed
11/25/2025
Objection raised — Other
11/25/2025
Objection resolved — Addressed
11/04/2025
Filed — Alteration
GC & STRUCTURAL WORK FOR GARAGE REPAIRS INCLUDING CONCRETE SLAB REPAIRS, STEEL REINFORCEMENT, AND INSTALLATION OF FIREPROOFING ON STEEL FRAMING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01284888-I1
10/17/2025
Filed — Alteration
B01260645-I1
10/17/2025
Permit issued — Supported Scaffold
B01260645-I1-SF
10/16/2025
Special inspection requirement — Interior lighting power
Eric Sun
10/16/2025
Special inspection requirement — Final
Eric Sun
10/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
10/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
Eric Sun
10/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
10/16/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
10/15/2025
Filed — Alteration
RENOVATION 3RD FLOOR APARTMENT#3A OF THE EXISTING 6 STORY BUILDING. NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT. CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01266648-P1
10/14/2025
Permit issued — Sidewalk Shed
B01299816-I1-SH
10/14/2025
Permit issued — Supported Scaffold
B01299822-I1-SF
10/14/2025
Permit issued — Suspended Scaffold
B01263691-I1-SC
10/11/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01299822-I1
10/11/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01299816-I1
10/10/2025
Objection resolved — Addressed
10/09/2025
Special inspection requirement — Structural Steel - Welding
JOSHUA LUCKRITZ
10/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMMAD AHEAD
10/03/2025
Permit issued — General Construction
B01249006-I1-GC
09/29/2025
Objection raised — Structural
09/24/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
B01263691-I1
09/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOSHUA LUCKRITZ
09/10/2025
Special inspection requirement — Final
Yakov Weinstein
09/10/2025
Special inspection requirement — Structural Steel - Details
JOSHUA LUCKRITZ
09/10/2025
Special inspection requirement — Sprayed fire-resistant materials
JOSHUA LUCKRITZ
09/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSHUA LUCKRITZ
08/29/2025
Filed — Alteration
B01249006-I1
08/19/2025
Permit issued — General Construction
B01266648-I1-GC
08/12/2025
Filed — Alteration
RENOVATION 3RD FLOOR APARTMENT#3A OF THE EXISTING 6 STORY BUILDING. NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT. CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01266648-I1
07/30/2025
Special inspection requirement — Post-installed Anchors
MOHAMMAD AHEAD
07/30/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MOHAMMAD AHEAD
05/20/2025
Violation issued (HPD, closed)
A
03/17/2025
Permit issued — General Construction
B01175839-I1-GC
03/06/2025
Signed off — Alteration
Modification to existing VERIZON site on the roof. Installation of 2 microwave dishes.
B00892951-I1
02/24/2025
Objection raised — Admin
02/24/2025
Objection resolved — Addressed
02/12/2025
Filed — Alteration
GENERAL CONSTRUCTION TO REPAIR FIRE DAMAGES IN UNIT 2C, 3C, 3D, 4C, 4D, 5C, 5D & RESTORE INTERIOR SURFACES & COSMETIC FINISHES AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
B01175839-I1
02/05/2025
Violation issued (HPD, closed)
I
02/05/2025
Violation issued (HPD, closed)
I
02/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nat Costanza
02/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Nat Costanza
02/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nat Costanza
02/03/2025
Special inspection requirement — Lighting in dwelling units
Nat Costanza
02/03/2025
Special inspection requirement — Insulation placement and R values
Nat Costanza
01/21/2025
Violation issued (HPD, closed)
C
01/21/2025
Violation issued (HPD, closed)
C
12/01/2024
Violation issued (HPD, open)
B
12/01/2024
Violation issued (HPD, open)
B
Latest 60 of 181 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKEY DEVELOPERS INC09/30/2026
DOB NOWStructuralPermit IssuedECI CONTRACTING GROUP INC02/25/2026
DOB NOWSupported ScaffoldPermit IssuedJUNO CONTRACTING10/17/2025
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC10/14/2025
DOB NOWSupported ScaffoldPermit IssuedANDAMIO SCAFFOLDING LLC10/14/2025
DOB NOWSuspended ScaffoldPermit IssuedJUNO CONTRACTING CORP10/14/2025
DOB NOWGeneral ConstructionPermit IssuedJUNO CONTRACTING10/03/2025
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY08/19/2025
DOB NOWGeneral ConstructionPermit IssuedNEW JM HOME IMPROVMENT IN03/17/2025
DOB NOWAntennaSigned-offCURRENT COMMUNICATIONS LL09/29/2023
DOB NOWStructuralSigned-offSKY TECH REST CORP07/25/2023
DOB NOWStructuralSigned-offSKY TECH REST CORP07/19/2023
DOB NOWGeneral ConstructionSigned-offSKY TECH REST CORP04/18/2023
DOB NOWAntennaSigned-offGOTHAM COMMUNICATIONS LLC09/02/2022
DOB NOWGeneral ConstructionSigned-offBEYOND BUILDING INC11/22/2021
DOB NOWPlumbingSigned-offGENERAL PLUMBING CORP03/25/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC03/30/2019
BISOTISSUEDCADENA CONSTRUCTION INC06/24/2019
BISPLISSUEDBEDROCK PLBG. & HTG., INC03/27/2017
BISMHISSUEDRC3 ELECTRIC, LLC03/16/2017
BISOTISSUEDRC3 ELECTRIC, LLC06/21/2016
BISMHISSUEDHS VENUS CORP03/16/2016
BISOTISSUEDHS VENUS CORP03/04/2016
BISOTISSUEDCOURT RESTORATION INC10/11/2012
BISOTISSUEDCOURT RESTORATION INC10/11/2012
BISOTISSUEDCOURT RESTORATION INC01/23/2012
BISOTISSUEDCOURT RESTORATION INC01/23/2012
BISOTISSUEDRAMAPO COMMUNICATION CORP08/30/2010
BISEQISSUEDBAY RESTORATION CORP04/20/2007
BISOTISSUEDBAY RESTORATION CORP04/10/2007
BISEQISSUEDBAY RESTORATION CORP01/16/2007
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM12/20/2006
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM12/14/2006
BISOTISSUEDBAY RESTORATION CORP07/21/2006
BISEQISSUEDXINOS CONSTRUCTION CORP03/09/2006
BISEQISSUEDXINOS CONSTRUCTION CORP01/11/2006
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM01/03/2006
BISEQISSUEDXINOS CONSTRUCTION CORP03/28/2005
BISEQISSUEDXINOS CONSTRUCTION CORP01/22/2004
BISEQISSUEDSPRING SCAFFOLDING08/21/2003
+ 7 more permits on file
1 project · most recent 07/14/2022
Generators
FiledStatusContractorScopeMake / Model / Capacity
07/14/2022——Generators
Generators
Kohler KG50 50 kW · Generator ×1
1 project · most recent 07/14/2022
Gas
FiledStatusContractorScope
07/14/2022——Gas
7 projects · most recent 10/14/2025
General Wiring
FiledStatusContractorScope
10/14/2025CompleteJ Y ELECTRIC INC—
10/07/2025Permit IssuedBOROWIDE ELECT'L CONTR'S—
04/24/2025CompleteAPN ELECTRICAL CORPGeneral Wiring
12/17/2021CompleteJ Y ELECTRIC INC—
08/06/2021Permit IssuedTHE METRO GROUP ELECTRIC—
03/28/2019CompleteBOROWIDE ELECT'L CONTR'S—
03/20/2019CompleteSTAR ELEC'L CONTRACTORS C—
1 project · most recent 11/04/2025
Steel Concrete
FiledStatusContractorScope
11/04/2025Permit IssuedECI CONTRACTING GROUP INCSteel, Concrete
2 projects · most recent 10/11/2025
Sidewalk Shed Scaffold
FiledStatusContractorScope
10/11/2025Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
10/11/2025Permit IssuedANDAMIO SCAFFOLDING LLCScaffold
1 project · most recent 09/24/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/24/2025Permit IssuedJUNO CONTRACTING CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/06/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
01/29/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/29/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/11/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
10/16/2025Interior lighting powerEric Sunenergy_progress
10/16/2025FinalEric Sunprogress
10/16/2025Energy Code Compliance InspectionsEric Sunprogress
10/16/2025Fire-Resistant Penetrations and JointsEric Sunspecial
10/16/2025Tenant Protection Plan ComplianceEric Sunspecial
10/16/2025Fire-Resistance Rated ConstructionEric Sunprogress
10/16/2025Insulation placement and R valuesEric Sunenergy_progress
10/09/2025Structural Steel - WeldingJOSHUA LUCKRITZspecial
10/07/2025Structural Stability – Alterations of existing buildingsMOHAMMAD AHEADspecial
09/10/2025Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
09/10/2025FinalYakov Weinsteinprogress
09/10/2025Structural Steel - DetailsJOSHUA LUCKRITZspecial
09/10/2025Sprayed fire-resistant materialsJOSHUA LUCKRITZspecial
09/10/2025Fire-Resistant Penetrations and JointsJOSHUA LUCKRITZspecial
07/30/2025Post-installed AnchorsMOHAMMAD AHEADspecial
07/30/2025Alternative Materials - OTCR Buildings Bulletin NumberMOHAMMAD AHEADspecial
02/03/2025Fire-Resistant Penetrations and JointsNat Costanzaspecial
02/03/2025Energy Code Compliance InspectionsNat Costanzaprogress
02/03/2025Fire-Resistance Rated ConstructionNat Costanzaprogress
02/03/2025Lighting in dwelling unitsNat Costanzaenergy_progress
02/03/2025Insulation placement and R valuesNat Costanzaenergy_progress
12/02/2022Post-installed AnchorsCOLLEEN CONNOLLYspecial
05/11/2022Final—progress
05/11/2022Mechanical Systems—special
05/11/2022Fire-Resistant Penetrations and JointsCOLLEEN CONNOLLYspecial
Latest 25 of 26.
▾Documents — 198 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch16
08/31/2026B00631170-I1Request digital key ↗
08/31/2026B00631170-P1Request digital key ↗
08/29/2026B00718019-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00398476-I1Request digital key ↗
08/15/2026B00398476-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00144202-I1Request digital key ↗
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION14
05/12/2023301319286Open ↗
10/29/2020321307509Open ↗
08/24/2020321307509Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION10
03/31/2017321307509Open ↗
03/22/2017321307509Open ↗
06/21/2016321317062Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
12/22/2017321307509Open ↗
06/15/2017321307509Open ↗
05/22/2017321307509Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/02/2026B00144202-I1Open ↗
09/02/2026B00398476-I1Open ↗
09/02/2026B00398476-P1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
08/30/2019321969250Open ↗
06/24/2019321969250Open ↗
05/24/2018321735789Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026B00398476-P1Open ↗
08/25/2026B01263691-I1Open ↗
08/25/2026B01263691-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/24/2026B01175839-I1Open ↗
08/24/2026B01175839-I1Open ↗
08/23/2026B01284888-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
06/24/2019321969250Open ↗
03/11/2016321321547Open ↗
01/23/2012320423172Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
01/23/2012320423172Open ↗
01/23/2012320423555Open ↗
▸BISProfessional and Owner Certification (POC3)1
06/24/2019321969250Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/11/2016321321547Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
01/16/2018321307509Open ↗
07/12/2017321307509Open ↗
06/06/2017321307509Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
03/16/2017321307509Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes4
06/24/2019321969250Open ↗
03/13/2018321735789Open ↗
08/26/2016321307509Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026B00398476-P1Open ↗
08/13/2026B00398476-I1Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/02/2026B00398476-I1Open ↗
09/02/2026B00398476-P1Open ↗
08/31/2026B00631170-P1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
06/24/2019321969250Open ↗
06/24/2019321969250Open ↗
03/13/2018321735789Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
01/23/2012320423172Open ↗
07/06/2010320183378Open ↗
07/06/2010320183378Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
08/30/2019321969250Open ↗
06/24/2019321969250Open ↗
04/11/2018321317062Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
09/30/2020321307509Open ↗
04/03/2018321317062Open ↗
05/04/2016321321547Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
01/23/2012320423172Open ↗
01/23/2012320423555Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/30/2020321307509Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00631170-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/14/2020321307509Open ↗
09/30/2020321307509Open ↗
▸Approvals, Objections & Sign-offs14
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
11/09/2020321307509Open ↗
08/30/2019321969250Open ↗
04/11/2018321317062Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
03/11/2016321321547Open ↗
03/09/2016321307509Open ↗
03/09/2016321317062Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/19/2012320423172Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026B01260645-I1Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT13
09/30/2020321307509Open ↗
08/30/2019321969250Open ↗
06/24/2019321969250Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET7
06/25/2019321969250Open ↗
03/13/2018321735789Open ↗
03/09/2016321307509Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION4
09/22/2020321307509Open ↗
01/30/2018321307509Open ↗
07/12/2017321307509Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
08/30/2019321969250Open ↗
04/11/2018321317062Open ↗
04/03/2018321317062Open ↗
▸Other Documents5
▸DOB NOWDHCR Document2
08/13/2026B00398476-I1Open ↗
08/13/2026B00398476-P1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00736468-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01263691-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01263691-I1Open ↗