BuildNYC
Condo, residential unit in elevator building
2121 SHORE PARKWAY
BROOKLYN · BIN 3187763
💬 Discuss this project
1963Year Built
6Stories
R4Building Class
R6Zoning
87,805 sfGross Floor Area
110Units
LL97 CoveredRent Stabilized42 Active Violations ▸FISP: SWARMPFDNY Report ↗
Condo, residential unit in elevator building · Owner of record: 2121 Shore Parkway Condominium · 20,000 sf lot · 4.39 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofThe 2121 Shore CondominiumUnder Construction22p · 8 filings · 20 docs
BulkheadThe 2121 Shore CondominiumUnder Construction1p · 1 filing · 7 docs
Floor 7Unit 7PUnder Construction17p · 2 filings · 10 docs
Floor 6Temporary equipment pipe scaffoldUnder Construction6p · 2 filings · 8 docs
Floor 5Unit 5CUnder Construction9p · 3 filings · 14 docs
Floor 4Unit 4C, Unit 4DUnder Construction9p · 3 filings · 14 docs
Floor 3Unit 3A, Unit 3C, Unit 3DUnder Construction14p · 4 filings · 20 docs
Floor 2Unit 2CUnder Construction9p · 3 filings · 14 docs
Floor 1Temporary equipment pipe scaffoldUnder Construction6p · 2 filings · 8 docs
CellarThe 2121 Shore CondominiumUnder Construction4p · 1 filing · 5 docs
BasementLaundry room dryer gas line replacement3p · 1 filing · 11 docs
Sub-BasementLaundry room dryer gas line replacement1p · 2 filings · 16 docs
Site & exteriorThe 2121 Shore CondominiumUnder Construction27p · 6 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2121 Shore Condominium8010/14/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution603/21/2026
Construction Permit Services303/21/2026
Argo Real Estate103/21/2026
Municipal Building Consultants203/21/2026
CCM Services Group103/21/2026
Basic Groups403/21/2026
Jon Paul Design & Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold610/14/2026
SKY Tech RestGeneral Contractor507/08/2026
Everest ScaffoldingScaffold203/21/2026
Juno ContractingScaffold210/06/2026
Beyond BuildingGeneral Contractor203/21/2026
Star Electrical ContractorsElectrical103/22/2026
Cube Builders Group NYGeneral Contractor104/09/2026
Current CommunicationsGeneral Contractor107/08/2026
Eci Contracting GroupGeneral Contractor104/09/2026
Gotham CommunicationsGeneral Contractor107/08/2026
Juno ContractingGeneral Contractor104/09/2026
New JM Home ImprovmentGeneral Contractor104/09/2026
Borowide Elect'l ContractorsElectrical103/22/2026
General PlumbingPlumbing107/08/2026
Cross Hudson ElectricalElectrical103/21/2026
Borowide Elect'l ContractorsElectrical103/21/2026
QNCC Electrical ContractingElectrical103/21/2026
J Y ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SWL Engineering Inspectio6912211/04/2025
Nic Design9758210/15/2025
Mohammad Ahead - Professi9286109/24/2025
CD Architect Studio2573102/12/2025
Scherer Design Group7921208/03/2023
Alan Margolin & Associates423106/22/2022
CMSC6098212/22/2021
RMR Inspection Group1977204/28/2021
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
10/20/2026
Bc 3307.4.7 at the time of inspection, observed construction materials stored unsafely on the public roadway adjacent to the job site at exp# 2.…
ECB violation · open
10/15/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01299822-I1
10/13/2026
Permit renewed — Supported Scaffold
Renewed without changes
B01299822-I1-SF
10/09/2026
Permit renewed — Sidewalk Shed
Renewed without changes
B01299816-I1-SH
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding10/13/2026
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding10/09/2026
DOB NOWSupported ScaffoldPermit IssuedJuno Contracting10/05/2026
DOB NOWSuspended ScaffoldPermit IssuedJuno Contracting10/02/2026
DOB NOWGeneral ConstructionPermit IssuedKey Developers09/30/2026
DOB NOWStructuralPermit IssuedEci Contracting Group02/25/2026
DOB NOWSupported ScaffoldPermit IssuedJuno Contracting10/17/2025
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding10/14/2025
DOB NOWSuspended ScaffoldPermit IssuedJuno Contracting10/14/2025
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding10/14/2025
DOB NOWGeneral ConstructionPermit IssuedJuno Contracting10/03/2025
DOB NOWGeneral ConstructionSigned-offCube Builders Group NY08/19/2025
DOB NOWGeneral ConstructionPermit IssuedNew JM Home Improvment03/17/2025
DOB NOWAntennaSigned-offCurrent Communications09/29/2023
DOB NOWStructuralSigned-offSKY Tech Rest07/25/2023
DOB NOWStructuralSigned-offSKY Tech Rest07/19/2023
DOB NOWGeneral ConstructionSigned-offSKY Tech Rest04/18/2023
DOB NOWAntennaSigned-offGotham Communications09/02/2022
DOB NOWGeneral ConstructionSigned-offBeyond Building11/22/2021
DOB NOWPlumbingSigned-offGeneral Plumbing03/25/2021
DOB NOWSidewalk ShedSigned-offEverest Scaffolding03/30/2019
BISOTISSUEDCadena Construction06/24/2019
BISPLISSUEDBedrock Plumbing & Heating03/27/2017
BISMHISSUEDRC3 Electric03/16/2017
BISOTISSUEDRC3 Electric06/21/2016
BISMHISSUEDHS Venus03/16/2016
BISOTISSUEDHS Venus03/04/2016
BISOTISSUEDCourt Restoration10/11/2012
BISOTISSUEDCourt Restoration10/11/2012
BISOTISSUEDCourt Restoration01/23/2012
BISOTISSUEDCourt Restoration01/23/2012
BISOTISSUEDRamapo Communication08/30/2010
BISEQISSUEDBay Restoration04/20/2007
BISOTISSUEDBay Restoration04/10/2007
BISEQISSUEDBay Restoration01/16/2007
BISEQISSUEDEmpire Scaffolding System12/20/2006
BISEQISSUEDEmpire Scaffolding System12/14/2006
BISOTISSUEDBay Restoration07/21/2006
BISEQISSUEDXinos Construction03/09/2006
BISEQISSUEDXinos Construction01/11/2006
+ 13 more permits on file
1 project · most recent 07/14/2022
Generators
FiledStatusContractorScope
07/14/2022——Generators
1 project · most recent 07/14/2022
Gas
FiledStatusContractorScope
07/14/2022——Gas
7 projects · most recent 10/14/2025
General Wiring
FiledStatusContractorScope
10/14/2025CompleteJ Y Electric—
10/07/2025Permit IssuedBorowide Elect'l Contractors—
04/24/2025CompleteApn ElectricalGeneral Wiring
12/17/2021CompleteJ Y Electric—
08/06/2021Permit IssuedThe Metro Group Electric—
03/28/2019CompleteBorowide Elect'l Contractors—
03/20/2019CompleteStar Electrical Contractors—
1 project · most recent 11/04/2025
Steel Concrete
FiledStatusContractorScope
11/04/2025Permit IssuedEci Contracting GroupSteel, Concrete
2 projects · most recent 10/11/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
10/11/2025Signed-offAndamio ScaffoldingScaffold
10/11/2025Permit IssuedAndamio ScaffoldingSidewalk Shed
1 project · most recent 09/24/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/24/2025Permit IssuedJuno ContractingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/11/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
10/16/2025Fire-Resistant Penetrations and JointsEric Sunspecial
10/16/2025FinalEric Sunprogress
10/16/2025Tenant Protection Plan ComplianceEric Sunspecial
10/16/2025Interior lighting powerEric Sunenergy_progress
10/16/2025Insulation placement and R valuesEric Sunenergy_progress
10/16/2025Fire-Resistance Rated ConstructionEric Sunprogress
10/16/2025Energy Code Compliance InspectionsEric Sunprogress
10/09/2025Structural Steel - WeldingJOSHUA LUCKRITZspecial
10/07/2025Structural Stability – Alterations of existing buildingsMOHAMMAD AHEADspecial
09/10/2025FinalYakov Weinsteinprogress
09/10/2025Fire-Resistant Penetrations and JointsJOSHUA LUCKRITZspecial
09/10/2025Sprayed fire-resistant materialsJOSHUA LUCKRITZspecial
09/10/2025Structural Steel - DetailsJOSHUA LUCKRITZspecial
09/10/2025Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
07/30/2025Post-installed AnchorsMOHAMMAD AHEADspecial
07/30/2025Alternative Materials - OTCR Buildings Bulletin NumberMOHAMMAD AHEADspecial
02/03/2025Fire-Resistant Penetrations and JointsNat Costanzaspecial
02/03/2025Fire-Resistance Rated ConstructionNat Costanzaprogress
02/03/2025Energy Code Compliance InspectionsNat Costanzaprogress
02/03/2025Insulation placement and R valuesNat Costanzaenergy_progress
02/03/2025Lighting in dwelling unitsNat Costanzaenergy_progress
12/02/2022Post-installed AnchorsCOLLEEN CONNOLLYspecial
05/11/2022Fire-Resistant Penetrations and JointsCOLLEEN CONNOLLYspecial
05/11/2022Final—progress
05/11/2022Mechanical Systems—special
Latest 25 of 26.
198 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account