ECB08/21/2026ATOI, OBSERVE 2 HVAC UNITS AT EXPO 3 ON FACADE WITH ELECTRICAL POWER AND SWITCHING SUPPLIED TO EXTERIOR WITHOUT ANY PERMITS ON FILE FOR THE SCOPE OF WORK, OBTAIN ALL PERMITS
Two stories - detached, small or mid-size · 2,500 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.