← Back
Banking facility, with or without parking
2122 WHITE PLAINS ROAD
BRONX · Pelham Parkway-Van Nest · BIN 2048788
💬 Discuss this project
1966Year Built
1Stories
K7Building Class
C4-4Zoning
9,205 sfGross Floor Area
1Units
3 Open Violations ▸FDNY Report ↗
Banking facility, with or without parking · Owner of record: H.A. ESTATE ASSOCIATES · 6,550 sf lot · 1.41 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 9 docs
Floor 11p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARENTFOX SCHIFF LLP503/22/2026
CHASE MANHATTAN BANK, N.A.203/21/2026
PM REALTY GROUP C/O JP MORGAN CH103/21/2026
PM REALTY GROUP C O JP MORGAN CH103/21/2026
140 E 45 ST103/21/2026
CHEMICAL BANK303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MERRITT ENGINEERING CONSULTANTS, DPC102/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MERRITT ENGINEERING CONSULTANT DPC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PERFORMANCE MECHANCIALGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MERRITT ENGINEERING CONSU460102/02/2023
Building Lifecycle
All (16)Filed (1)Permit Issued (1)Signed Off (1)Violation (5)Special Inspection (8)
03/01/2023
Signed off — Alteration
REPLACEMENT OF MINI SPLIT HVAC SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00757426-I1
02/16/2023
Permit issued — Mechanical Systems
X00757426-I1-MS
02/02/2023
Filed — Alteration
REPLACEMENT OF MINI SPLIT HVAC SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00757426-I1
06/14/2022
Special inspection requirement — Mechanical Systems
Christopher Krepcio
06/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Krepcio
06/14/2022
Special inspection requirement — Final
Christopher Krepcio
06/14/2022
Special inspection requirement — Energy Code Compliance Inspections
Christopher Krepcio
06/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Krepcio
06/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Krepcio
06/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Krepcio
06/14/2022
Special inspection requirement — Maintenance information
Christopher Krepcio
12/13/1993
Violation issued (DOB, open)
VH-VIOLATION HAZARDOUS - ACTIVE
11/24/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/14/1990
Violation issued (ECB, closed)
Construction
07/18/1990
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
07/18/1990
Violation issued (DOB, open)
VP-VIOLATION UNSERVED ECB-ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPERFORMANCE MECHANCIAL02/16/2023
BIS—ISSUEDNATIONAL MAINTENANCE, INC12/02/2015
BIS—ISSUEDNATIONAL MAINTENANCE INC.08/03/2006
BISMHISSUEDBOTTO MECHANICAL CORP05/23/2006
BIS—ISSUEDLETTERA SIGN & ELECTRIC CO. INC.09/03/1996
BIS—ISSUEDVILLEPIQUE OUTDOOR ADVERTISING02/23/1995
BIS—ISSUEDVILLEPIQUE OUTDOOR ADVERTISING01/19/1995
BISMHISSUEDLANE ASSOCIATES02/16/1994
BIS—ISSUEDJOHN CAPPELLI ERECTORS INC.02/15/1994
BISEQISSUEDS. DIACOMO & SON01/26/1993
BISMHISSUEDS. DIGIACOMO & SON01/26/1993
BISOTISSUEDS. DIGIACOMO & SON01/26/1993
BISMHISSUEDS. DIGIACOMO & SON10/26/1992
BISEQISSUEDS. DIACOMO & SON10/26/1992
BISOTISSUEDS. DIGIACOMO & SON10/26/1992
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
06/14/2022Mechanical SystemsChristopher Krepciospecial
06/14/2022Fire-Resistant Penetrations and JointsChristopher Krepciospecial
06/14/2022FinalChristopher Krepcioprogress
06/14/2022Energy Code Compliance InspectionsChristopher Krepcioprogress
06/14/2022HVAC-R and service water heating equipmentChristopher Krepcioenergy_progress
06/14/2022HVAC-R and service water heating system controlsChristopher Krepcioenergy_progress
06/14/2022HVAC-R and service water piping design and insulationChristopher Krepcioenergy_progress
06/14/2022Maintenance informationChristopher Krepcioenergy_progress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026X00757426-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
11/10/2015220470531Open ↗
▸BISWORK PERMIT APPLICATION1
12/02/2015220470531Open ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature5
08/24/2026X00757426-I1Open ↗
08/24/2026X00757426-I1Open ↗
08/24/2026X00757426-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/12/2016220470531Open ↗
11/10/2015220470531Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/10/2015220470531Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/10/2015220470531Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/23/2026X00757426-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026X00757426-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSIGN HANGER CERTIFICATE1
11/10/2015220470531Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/10/2015220470531Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026X00757426-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
08/22/2016220470531Open ↗
08/12/2016220470531Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/12/2016220470531Open ↗
11/10/2015220470531Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
11/10/2015220470531Open ↗