← Back
BRONX
2123 GLEBE AVENUE
BRONX · BIN 2130862
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
7 Open Violations ▸
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof4p · 2 filings · 10 docs
Floor 9Under Construction45p · 1 filing · 20 docs
Floor 8Under Construction45p · 1 filing · 20 docs
Floor 7Under Construction45p · 1 filing · 20 docs
Floor 6Under Construction47p · 1 filing · 20 docs
Floor 5Under Construction45p · 1 filing · 20 docs
Floor 4Under Construction46p · 1 filing · 20 docs
Floor 3Under Construction47p · 1 filing · 20 docs
Floor 2Under Construction49p · 1 filing · 20 docs
Floor 1Under Construction50p · 3 filings · 20 docs
CellarUnder Construction47p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VAJA GROUP9407/08/2026
OWNERS REP907/08/2026
254 MELROSE1307/08/2026
THE GLEBE CASTLE LLC103/22/2026
CITY WIDE BUILDERS GRP IN1103/22/2026
BUILDERS GRP IN CITY WIDE503/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNSHINE PLAZA LLC3103/21/2026
NYC DESIGN FILE203/21/2026
THE GREEN STUDIO803/21/2026
MILLENNIUM DESIGNS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITY WIDE BUILDERS GRP INGeneral Contractor1607/08/2026
BENJAMIN DREBINElectrical1003/21/2026
ACCURATE ELECL CORP 002950General Contractor903/22/2026
GWT ENTERPRISES INCGeneral Contractor907/08/2026
BEST MECHANICAL SVCS INCPlumbing607/08/2026
RIGHTWAY PLBG AND HTG INCFire Protection207/08/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91682604/15/2026
ENGINEERING CONSULTING SE2050112/15/2023
Building Lifecycle
All (240)Filed (41)Permit Issued (28)Signed Off (16)Violation (34)Inspection (17)Objection (71)Special Inspection (30)Tax Incentive (3)
08/01/2026
421-a(16) construction completed
07/13/2026
Signed off — New Building
Sprinkler & Standpipe work type filed in conjunction with NB application #X00705496-I1
X00705496-S3
05/25/2026
Signed off — New Building
Sprinkler & Standpipe work type filed in conjunction with NB application #X00705496-I1
X00705496-S8
05/20/2026
Violation issued (HPD, open)
C
05/20/2026
Violation issued (HPD, open)
B
05/20/2026
Violation issued (HPD, open)
A
05/20/2026
Violation issued (HPD, open)
B
05/20/2026
Violation issued (HPD, open)
C
04/27/2026
Special inspection requirement — Insulation placement and R values
Soorjbally Harilall
04/27/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Soorjbally Harilall
04/27/2026
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
04/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
SOORJBALLY HARILALL
04/27/2026
Special inspection requirement — Interior lighting power
Soorjbally Harilall
04/27/2026
Special inspection requirement — Electrical motors and elevators
Soorjbally Harilall
04/27/2026
Special inspection requirement — Lighting controls
Soorjbally Harilall
04/27/2026
Special inspection requirement — Metering
Soorjbally Harilall
04/27/2026
Special inspection requirement — Air barrier continuity plan testing
Soorjbally Harilall
04/27/2026
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
04/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Soorjbally Harilall
04/27/2026
Special inspection requirement — Fenestration areas
Soorjbally Harilall
04/27/2026
Special inspection requirement — Lighting in dwelling units
Soorjbally Harilall
04/27/2026
Special inspection requirement — Protection of exposed foundation insulation
Soorjbally Harilall
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
04/27/2026
Special inspection requirement — Exterior lighting power
Soorjbally Harilall
04/27/2026
Special inspection requirement — Maintenance information
Soorjbally Harilall
04/27/2026
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
04/18/2026
Violation issued (HPD, closed)
B
04/18/2026
Violation issued (HPD, closed)
B
04/18/2026
Violation issued (HPD, closed)
B
04/18/2026
Violation issued (HPD, closed)
B
04/15/2026
Filed — New Building
Sprinkler & Standpipe work type filed in conjunction with NB application #X00705496-I1
X00705496-B6
02/11/2026
Violation issued (HPD, closed)
C
02/11/2026
Violation issued (HPD, closed)
B
02/11/2026
Violation issued (HPD, open)
B
02/11/2026
Violation issued (HPD, closed)
C
02/11/2026
Violation issued (HPD, closed)
C
02/11/2026
Violation issued (HPD, open)
B
02/05/2026
Violation issued (HPD, closed)
B
02/05/2026
Violation issued (HPD, closed)
B
01/20/2026
Signed off — New Building
Sprinkler & Standpipe work type filed in conjunction with NB application #X00705496-I1
X00705496-Z4
12/23/2025
Objection raised — Energy
12/23/2025
Objection raised — Zoning
12/23/2025
Objection raised — Admin
12/23/2025
Objection raised — Zoning
12/23/2025
Objection raised — Zoning
12/23/2025
Objection raised — Admin
12/23/2025
Objection raised — Admin
12/23/2025
Objection raised — Zoning
12/02/2025
Filed — New Building
Sprinkler & Standpipe work type filed in conjunction with NB application #X00705496-I1
X00705496-B4
11/25/2025
Signed off — New Building
Sprinkler & Standpipe work type filed in conjunction with NB application #X00705496-I1
X00705496-Z3
11/25/2025
Special inspection requirement — Protection of exposed foundation insulation
Soorjbally Harilall
11/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Soorjbally Harilall
11/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
SOORJBALLY HARILALL
11/25/2025
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
11/25/2025
Special inspection requirement — Metering
Soorjbally Harilall
11/25/2025
Special inspection requirement — Interior lighting power
Soorjbally Harilall
11/25/2025
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
11/25/2025
Special inspection requirement — Insulation placement and R values
Soorjbally Harilall
11/25/2025
Special inspection requirement — Exterior lighting power
Soorjbally Harilall
11/25/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Soorjbally Harilall
Latest 60 of 240 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offBEST MECHANICAL SVCS INC07/09/2025
DOB NOWStandpipeSigned-offRIGHTWAY PLBG AND HTG INC07/09/2025
DOB NOWBoiler EquipmentSigned-offMICHAEL S. KAPLAN04/23/2025
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC02/18/2025
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC02/13/2025
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC02/10/2025
DOB NOWProtection and Mechanical MethodsSigned-offGWT ENTERPRISES INC01/21/2025
DOB NOWConstruction FenceSigned-offCITY WIDE BUILDERS GRP IN12/24/2024
DOB NOWCurb CutSigned-offCITY WIDE BUILDERS GRP IN12/06/2024
DOB NOWGeneral ConstructionPermit IssuedCITY WIDE BUILDERS GRP IN09/24/2024
DOB NOWStructuralSigned-offCITY WIDE BUILDERS GRP IN08/20/2024
DOB NOWGeneral ConstructionPermit IssuedCITY WIDE BUILDERS GRP IN08/08/2024
DOB NOWMechanical SystemsSigned-offCITY WIDE BUILDERS GRP IN07/18/2024
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC07/17/2024
DOB NOWStandpipeSigned-offBEST MECHANICAL SVCS INC07/10/2024
DOB NOWStandpipeSigned-offRIGHTWAY PLBG AND HTG INC07/10/2024
DOB NOWSprinklersSigned-offBEST MECHANICAL SVCS INC07/10/2024
DOB NOWGeneral ConstructionPermit IssuedCITY WIDE BUILDERS GRP IN06/21/2024
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC03/07/2024
DOB NOWProtection and Mechanical MethodsSigned-offGWT ENTERPRISES INC02/15/2024
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC02/15/2024
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC02/15/2024
DOB NOWProtection and Mechanical MethodsSigned-offGWT ENTERPRISES INC01/24/2024
DOB NOWStructuralSigned-offCITY WIDE BUILDERS GRP IN01/04/2024
DOB NOWFoundationSigned-offCITY WIDE BUILDERS GRP IN01/03/2024
DOB NOWFoundationSigned-offCITY WIDE BUILDERS GRP IN12/15/2023
DOB NOWSupport of ExcavationSigned-offCITY WIDE BUILDERS GRP IN12/15/2023
DOB NOWConstruction FenceSigned-offCITY WIDE BUILDERS GRP IN12/13/2023
2 projects · most recent 04/15/2026
Air Conditioning Systems Heating Systems Ventilation Systems Generators
FiledStatusContractorScopeMake / Model / Capacity
04/15/2026Signed-offCITY WIDE BUILDERS GRP INAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Amana PTH073G35 7,600 BTU · Ptac ×402
PTH123G35 12,000 BTU · Ptac ×176
PTH093G35 9,000 BTU · Ptac ×98
PTH153G35 14,700 BTU · Ptac ×46
Heating
Amana PTH073G35 6,800 BTU · Electric Heater ×402
PTH123G35 11,300 BTU · Electric Heater ×176
TH093G35 8,100 BTU · Electric Heater ×98
PTH153G35 13,600 BTU · Electric Heater ×46
Ventilation
Nutone AEN110 50 CFM ×100
Greenheck AER-24-03-0315-VG 5,000 CFM · Exhaust Fan ×2
USF-04-B7 400 CFM · Exhaust Fan ×2
04/23/2025——Generators—
1 project · most recent 04/15/2026
Sprinkler System
FiledStatusContractorScope
04/15/2026Signed-offRIGHTWAY PLBG AND HTG INCSprinkler System
1 project · most recent 04/15/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/15/2026Signed-offBEST MECHANICAL SVCS INCGas, Storm, Water/Sanitary
5 projects · most recent 12/21/2025
General Wiring
FiledStatusContractorScope
12/21/2025CompleteACCURATE ELEC'L CORP.General Wiring
10/02/2024CompleteDENALI ELECTRIC CORP—
09/19/2024CompleteACCURATE ELEC'L CORP.General Wiring
09/06/2024CompleteSTAR ELEC'L CONTRACTORS C—
01/25/2024CompleteSOLAS ELECTRICAL CORP—
2 projects · most recent 04/15/2026
Concrete
FiledStatusContractorScope
04/15/2026Signed-offRIGHTWAY PLBG AND HTG INCConcrete
05/11/2022——1 scope_items
1 project · most recent 04/15/2026
Fence
FiledStatusContractorScope
04/15/2026Signed-offRIGHTWAY PLBG AND HTG INCFence
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
07/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/22/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/26/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
03/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/21/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
03/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/19/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/17/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/30/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/20/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/10/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/11/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/19/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
04/27/2026Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
04/27/2026Interior lighting powerSoorjbally Harilallenergy_progress
04/27/2026Air barrier continuity plan testingSoorjbally Harilallenergy_progress
04/27/2026Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
04/27/2026Exterior Insulation and Finish Systems (EIFS)Soorjbally Harilallspecial
04/27/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
04/27/2026Lighting in dwelling unitsSoorjbally Harilallenergy_progress
04/27/2026Insulation placement and R valuesSoorjbally Harilallenergy_progress
04/27/2026Exterior lighting powerSoorjbally Harilallenergy_progress
04/27/2026Lighting controlsSoorjbally Harilallenergy_progress
04/27/2026Maintenance informationSoorjbally Harilallenergy_progress
04/27/2026Air barrier - visual inspectionSoorjbally Harilallenergy_progress
04/27/2026MeteringSoorjbally Harilallenergy_progress
04/27/2026Fenestration air leakageSoorjbally Harilallenergy_progress
04/27/2026Electrical motors and elevatorsSoorjbally Harilallenergy_progress
04/27/2026Fire-Resistance Rated ConstructionSOORJBALLY HARILALLprogress
04/27/2026Energy Code Compliance InspectionsSOORJBALLY HARILALLprogress
04/27/2026Fenestration areasSoorjbally Harilallenergy_progress
11/25/2025Fenestration air leakageSoorjbally Harilallenergy_progress
11/25/2025Fenestration areasSoorjbally Harilallenergy_progress
11/25/2025Interior lighting powerSoorjbally Harilallenergy_progress
11/25/2025Insulation placement and R valuesSoorjbally Harilallenergy_progress
11/25/2025Air barrier continuity plan testingSoorjbally Harilallenergy_progress
11/25/2025Air barrier - visual inspectionSoorjbally Harilallenergy_progress
11/25/2025Lighting in dwelling unitsSoorjbally Harilallenergy_progress
Latest 25 of 150.
▾Documents — 270 on file (BIS + DOB NOW)
▸Plans & Drawings43
▸DOB NOWPlans/Sketch43
08/21/2026X00994080-I1Request digital key ↗
08/21/2026X00994080-P1Request digital key ↗
08/21/2026X00994080-P2Request digital key ↗
Showing 3 of 43 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
01/07/2026240357564Open ↗
▸Zoning, Tax Lot & Property Records25
▸DOB NOWZD1: DOB Zoning Diagram12
08/17/2026X00705496-I1Open ↗
08/17/2026X00705496-B6Open ↗
08/17/2026X00705496-A9Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWZoning Exhibit form (1-5)12
08/17/2026X00705496-I1Open ↗
08/17/2026X00705496-B6Open ↗
08/17/2026X00705496-A9Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026X00705496-I1Open ↗
▸Seals & Professional Certifications121
▸DOB NOWProgress Inspector Seal & Signature44
09/01/2026X00705496-A3Open ↗
09/01/2026X00705496-A3Open ↗
09/01/2026X00705496-A3Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature43
08/24/2026X00729075-I1Open ↗
08/21/2026X00994080-P2Open ↗
08/21/2026X00994080-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature33
09/26/2026X00705496-A6Open ↗
09/23/2026X00705496-Z5Open ↗
09/14/2026X00705496-Z4Open ↗
Showing 3 of 33 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/17/2023240357564Open ↗
▸Trade Schedules & Equipment12
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)11
08/17/2026X00705496-A1Open ↗
08/17/2026X00705496-I1Open ↗
08/17/2026X00705496-A9Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/17/2026X00705496-I1—
▸Safety & Tenant Protection17
▸DOB NOWStreet Tree Checklist12
08/17/2026X00705496-I1Open ↗
08/17/2026X00705496-B6Open ↗
08/17/2026X00705496-A9Open ↗
Showing 3 of 12 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
04/09/2024240357564Open ↗
▸BISSTREET TREE CHECKLIST1
04/09/2024240357564Open ↗
▸DOB NOWStreet Tree Sign Off1
08/17/2026X00705496-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/17/2026X00705496-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026X00705496-I1Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
08/17/2026X00705496-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/17/2026X00705496-S1Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/17/2026X00705496-S1Open ↗
▸DOB NOWConcrete Testing Exception Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Plot Diagram1
08/17/2026X00705496-S1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/17/2023240357564Open ↗
▸Other Documents41
▸DOB NOWSite Survey: Initial12
08/17/2026X00705496-I1Open ↗
08/17/2026X00705496-B6Open ↗
08/17/2026X00705496-A9Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone12
08/17/2026X00705496-A1Open ↗
08/17/2026X00705496-I1Open ↗
08/17/2026X00705496-P9Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProperty Ownership Certification12
08/17/2026X00705496-B6Open ↗
08/17/2026X00705496-P9Open ↗
Showing 2 of 12 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
03/19/2025240357564Open ↗
04/03/2024240357564Open ↗
12/27/2023240357564Open ↗
▸DOB NOWFinal Survey1
08/17/2026X00705496-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/17/2026X00705496-S9Open ↗