Primarily 3 family with 1 store or office
2125 2 AVENUE
MANHATTAN · BIN 1052438
💬 Discuss this project
1900Year Built
4Stories
S3Building Class
R9AZoning
4,000 sfGross Floor Area
4Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · 1,600 sf lot · 2.5 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralGeneral
Permit Issued — active, not yet Signed-off
Floor 1Under Construction35p · 1 filing · 20 docs
CellarUnder Construction34p · 1 filing · 20 docs
Sub-BasementUnder Construction34p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KIERAN PATRICK SPILLANE412/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C.A.C. INDUSTRIES, INCGeneral Contractor307/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106210/26/2023
Building Lifecycle
All (45)Filed (4)Permit Issued (3)Violation (13)Objection (6)Special Inspection (19)
07/24/2026
Permit issued — Foundation
M00925933-I1-FO
02/23/2026
Permit issued — General Construction
M00925933-S2-FO
01/20/2026
Permit issued — Foundation
M00925933-S2-GC
01/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
01/06/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
01/06/2026
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
12/23/2025
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo vault removal & cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder. Existing vault to be covered.
M00925933-P2
12/22/2025
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo vault removal & cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder. Existing vault to be covered.
M00925933-P1
10/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/16/2025
Special inspection requirement — Deep Foundation Elements
10/16/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
10/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/16/2025
Special inspection requirement — Structural Steel - Details
10/16/2025
Special inspection requirement — Structural Steel - High Strength Bolting
10/16/2025
Special inspection requirement — Structural Steel - Welding
10/16/2025
Special inspection requirement — Subgrade Inspections
10/16/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
10/16/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
10/16/2025
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
10/16/2025
Special inspection requirement — Final
10/16/2025
Special inspection requirement — Footing and Foundation
10/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/16/2025
Special inspection requirement — Final
10/16/2025
Special inspection requirement — Footing and Foundation
02/21/2024
Objection resolved — Addressed
02/21/2024
Objection resolved — Addressed
01/12/2024
Objection raised — Other
01/04/2024
Objection resolved — Addressed
11/27/2023
Violation issued (HPD, closed)
I
10/31/2023
Objection raised — Other
10/30/2023
Objection raised — Other
10/26/2023
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo vault removal & cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder. Existing vault to be covered.
M00925933-I1
10/26/2023
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo vault removal & cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder. Existing vault to be covered.
M00925933-S2
11/16/2022
Violation issued (HPD, closed)
I
10/30/2018
Violation issued (HPD, closed)
I
01/20/2006
Violation issued (HPD, open)
B
01/20/2006
Violation issued (HPD, open)
B
01/20/2006
Violation issued (HPD, open)
B
01/20/2006
Violation issued (HPD, open)
B
11/05/2005
Violation issued (HPD, open)
B
11/05/2005
Violation issued (HPD, open)
B
11/05/2005
Violation issued (HPD, open)
B
11/01/2005
Violation issued (HPD, open)
A
11/01/2005
Violation issued (HPD, open)
C
10/24/2005
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedC.A.C. INDUSTRIES, INC07/24/2026
DOB NOWGeneral ConstructionPermit IssuedC.A.C. INDUSTRIES, INC02/23/2026
DOB NOWFoundationPermit IssuedC.A.C. INDUSTRIES, INC01/20/2026
1 project · most recent 12/23/2025
FiledStatusContractorScope
12/23/2025Permit IssuedC.A.C. INDUSTRIES, INC4 scope_items
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
01/06/2026Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
01/06/2026FinalGEORGE GHEBRYALprogress
01/06/2026Footing and FoundationGEORGE GHEBRYALprogress
10/16/2025Tenant Protection Plan Compliance—special
10/16/2025Deep Foundation Elements—special
10/16/2025Excavations - Sheeting, Shoring, and Bracing—special
10/16/2025Structural Stability – Alterations of existing buildings—special
10/16/2025Structural Steel - Details—special
10/16/2025Structural Steel - High Strength Bolting—special
10/16/2025Structural Steel - Welding—special
10/16/2025Subgrade Inspections—special
10/16/2025Subsurface Conditions – Fill Placement & In-Place Density—special
10/16/2025Subsurface Investigations (Borings/Test Pits)—special
10/16/2025Underpinning and alternate methods of support of buildings and adjacent property—special
10/16/2025Final—progress
10/16/2025Footing and Foundation—progress
10/16/2025Tenant Protection Plan Compliance—special
10/16/2025Final—progress
10/16/2025Footing and Foundation—progress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026M00925933-I1Request digital key ↗
08/20/2026M00925933-S2Request digital key ↗
08/20/2026M00925933-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026M00925933-P1Open ↗
08/13/2026M00925933-I1Open ↗
08/13/2026M00925933-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026M00925933-S2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026M00925933-S2Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026M00925933-S2Open ↗
08/13/2026M00925933-I1Open ↗
08/13/2026M00925933-P2Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026M00925933-P1Open ↗
08/13/2026M00925933-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/20/2026M00925933-I1Open ↗
08/13/2026M00925933-I1Open ↗
▸Other Documents4
▸DOB NOWGeotechnical Peer Review Report (BC 1818)4
08/13/2026M00925933-S2Open ↗
08/13/2026M00925933-P1Open ↗
08/13/2026M00925933-P2Open ↗
Showing 3 of 4 on file for this type