Three families
2126 LAFAYETTE AVENUE
BRONX · BIN 2022397
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R3-2Zoning
3,720 sfGross Floor Area
3Units
Rent Stabilized24 Open Violations ▸
Three families · Owner of record: 2126 LAFAYETTE CORP · 2,875 sf lot · 1.29 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction7p · 2 filings · 14 docs
Floor 1Under Construction8p · 2 filings · 14 docs
BasementUnder Construction5p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2126 LAFAYETTE CORP2507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/09/2020$525K—— → —$141/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A GUAMAN CONSTRUCTION COR402/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
E&A DESIGN AND EXPEDITER CORP.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JADA PLUMBING & HTG LLCPlumbing307/08/2026
RAFALEX CONTRACTING CORPGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616402/17/2024
Building Lifecycle
All (66)Filed (4)Permit Issued (5)Violation (27)Inspection (3)Objection (24)Special Inspection (3)
06/04/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
05/29/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/30/2026
Violation issued (HPD, open)
A
04/27/2026
Permit issued — Plumbing
X00818060-I1-PL
04/23/2026
Permit issued — General Construction
X00818041-I1-GC
04/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/05/2026
Violation issued (ECB, open)
Construction
03/05/2026
Violation issued (ECB, open)
Construction
03/05/2026
Violation issued (ECB, open)
Construction
03/05/2026
Violation issued (ECB, open)
Construction
11/18/2025
Violation issued (HPD, open)
I
06/05/2025
Violation issued (HPD, open)
A
11/27/2024
Permit issued — Plumbing
X00818060-I1-PL
11/25/2024
Violation issued (HPD, open)
I
09/05/2024
Objection resolved — Addressed
09/05/2024
Objection resolved — Addressed
04/02/2024
Violation issued (HPD, open)
A
02/21/2024
Objection raised — Other
02/21/2024
Objection raised — Admin
02/17/2024
Filed — Alteration
INTERIOR RENOVATION TO RESTORE PREMISE TO LEGAL CONDITIONS AND CORRECT ECB VIOLATIONS #'S 35477118L;35477117J;35477116H;35477175X;35477114Y & 35477107X.NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
X00818041-P1
02/17/2024
Filed — Alteration
INTERIOR RENOVATION TO RESTORE PREMISE TO LEGAL CONDITIONS AND CORRECT ECB VIOLATIONS #'S 35477118L &35477107X.NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
X00818060-P1
01/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
01/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/17/2023
Permit issued — Plumbing
X00818060-I1-PL
11/16/2023
Violation issued (HPD, open)
I
08/28/2023
Permit issued — General Construction
X00818041-I1-GC
04/10/2023
Objection resolved — Addressed
03/17/2023
Violation issued (HPD, open)
A
03/01/2023
Objection raised — Scope
02/25/2023
Objection raised — Structural
02/25/2023
Objection resolved — Addressed
02/25/2023
Objection raised — Fire_Protection
02/25/2023
Objection resolved — Addressed
02/25/2023
Objection raised — Structural
02/25/2023
Objection resolved — Addressed
02/25/2023
Objection raised — Fire_Protection
02/25/2023
Objection resolved — Addressed
02/25/2023
Objection raised — Zoning
02/25/2023
Objection resolved — Addressed
02/25/2023
Objection raised — Inspections
02/25/2023
Objection resolved — Addressed
02/25/2023
Objection raised — Fire_Protection
02/25/2023
Objection resolved — Addressed
02/25/2023
Objection raised — Admin
02/25/2023
Objection resolved — Addressed
02/25/2023
Objection raised — Scope
02/25/2023
Objection resolved — Addressed
02/22/2023
Filed — Alteration
INTERIOR RENOVATION TO RESTORE PREMISE TO LEGAL CONDITIONS AND CORRECT ECB VIOLATIONS #'S 35477118L;35477117J;35477116H;35477175X;35477114Y & 35477107X.NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
X00818041-I1
02/22/2023
Filed — Alteration
INTERIOR RENOVATION TO RESTORE PREMISE TO LEGAL CONDITIONS AND CORRECT ECB VIOLATIONS #'S 35477118L &35477107X.NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
X00818060-I1
11/16/2022
Violation issued (ECB, open)
Quality of Life
11/16/2022
Violation issued (ECB, open)
Construction
11/16/2022
Violation issued (ECB, open)
Quality of Life
11/16/2022
Violation issued (ECB, open)
Construction
11/16/2022
Violation issued (ECB, open)
Construction
11/16/2022
Violation issued (ECB, open)
Quality of Life
11/04/2022
Violation issued (HPD, open)
I
02/17/2022
Violation issued (HPD, open)
A
02/17/2022
Violation issued (HPD, open)
I
04/02/2021
Violation issued (HPD, open)
A
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJADA PLUMBING & HTG LLC04/27/2026
DOB NOWGeneral ConstructionPermit IssuedRAFALEX CONTRACTING CORP04/23/2026
DOB NOWPlumbingPermit IssuedJADA PLUMBING & HTG LLC11/27/2024
DOB NOWPlumbingPermit IssuedJADA PLUMBING & HTG LLC11/17/2023
DOB NOWGeneral ConstructionPermit IssuedRAFALEX CONTRACTING CORP08/28/2023
BISOTISSUEDMEROPOLITAN RESTORATION12/31/1998
1 project · most recent 02/17/2024
Gas Water/Sanitary
FiledStatusContractorScope
02/17/2024Permit IssuedJADA PLUMBING & HTG LLCGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/04/2026Fail-Final Boiler Equipment InspectionFailView ↗
05/29/2026Fail-Final General Construction Non-Directive 14FailView ↗
04/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
01/31/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/31/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
01/31/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026X00818060-P1Request digital key ↗
08/21/2026X00818041-I1Request digital key ↗
08/15/2026X00818060-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026X00818060-P1Open ↗
08/21/2026X00818060-I1Open ↗
08/21/2026X00818041-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026X00818041-P1Open ↗
08/26/2026X00818060-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026X00818060-P1Open ↗
08/21/2026X00818041-I1Open ↗
08/15/2026X00818060-I1Open ↗
Showing 3 of 4 on file for this type