← Back
MANHATTAN
2127 2 AVENUE
MANHATTAN · East Harlem (North) · BIN 1052439
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
10 Open Violations ▸FDNY Report ↗
Flood zone X500
Locations of Work
StructuralGeneral
Permit Issued — active, not yet Signed-off
Floor 1Under Construction3p · 1 filing · 14 docs
CellarUnder Construction4p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
G S REALTY ASSOCIATES707/23/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KIERAN PATRICK SPILLANE212/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOE MIDDLETONElectrical203/21/2026
ZBIGNIEW RYBICKIElectrical203/21/2026
C.A.C. INDUSTRIES, INCGeneral Contractor207/23/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106212/23/2025
Building Lifecycle
All (76)Filed (2)Permit Issued (2)Violation (60)Objection (1)Special Inspection (11)
07/22/2026
Permit issued — Foundation
M01120778-I1-FO
06/29/2026
Permit issued — Structural
M01120778-S1-GC-CX
04/13/2026
Objection raised — Scope
12/23/2025
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & vault removal. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder.
M01120778-S1
12/22/2025
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & vault removal. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder.
M01120778-I1
11/22/2024
Violation issued (HPD, closed)
I
10/16/2024
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
10/02/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
GEORGE GHEBRYAL
10/02/2024
Special inspection requirement — Demolition
GEORGE GHEBRYAL
10/02/2024
Special inspection requirement — Masonry
GEORGE GHEBRYAL
10/02/2024
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
10/02/2024
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
10/02/2024
Special inspection requirement — Vertical Masonry Foundation Elements
GEORGE GHEBRYAL
10/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
10/02/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
10/02/2024
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
10/02/2024
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/2023
Violation issued (HPD, closed)
A
03/22/2022
Violation issued (HPD, open)
C
03/22/2022
Violation issued (HPD, open)
C
03/22/2022
Violation issued (HPD, closed)
A
03/22/2022
Violation issued (HPD, closed)
B
03/22/2022
Violation issued (HPD, closed)
B
04/01/2021
Violation issued (HPD, closed)
A
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/05/2018
Violation issued (HPD, closed)
I
06/28/2017
Violation issued (HPD, closed)
B
06/28/2017
Violation issued (HPD, closed)
A
06/28/2017
Violation issued (HPD, closed)
A
06/28/2017
Violation issued (HPD, closed)
A
06/28/2017
Violation issued (HPD, closed)
C
06/28/2017
Violation issued (HPD, closed)
A
06/28/2017
Violation issued (HPD, closed)
A
06/28/2017
Violation issued (HPD, open)
A
06/28/2017
Violation issued (HPD, open)
A
10/24/2016
Violation issued (HPD, closed)
I
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/17/2006
Violation issued (HPD, closed)
B
06/28/2000
Violation issued (HPD, closed)
B
06/28/2000
Violation issued (HPD, closed)
B
06/28/2000
Violation issued (HPD, closed)
B
06/28/2000
Violation issued (HPD, closed)
B
07/19/1996
Violation issued (HPD, closed)
B
07/19/1996
Violation issued (HPD, closed)
A
07/19/1996
Violation issued (HPD, closed)
C
07/19/1996
Violation issued (HPD, open)
B
07/19/1996
Violation issued (HPD, open)
B
07/19/1996
Violation issued (HPD, closed)
A
07/19/1996
Violation issued (HPD, closed)
A
06/11/1996
Violation issued (HPD, closed)
B
06/11/1996
Violation issued (HPD, closed)
C
06/11/1996
Violation issued (HPD, closed)
B
03/15/1996
Violation issued (HPD, closed)
C
03/15/1996
Violation issued (HPD, closed)
C
03/15/1996
Violation issued (HPD, closed)
B
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedC.A.C. INDUSTRIES, INC07/22/2026
DOB NOWStructuralPermit IssuedC.A.C. INDUSTRIES, INC06/29/2026
1 project · most recent 12/23/2025
Steel Concrete
FiledStatusContractorScope
12/23/2025Permit IssuedC.A.C. INDUSTRIES, INCSteel, Concrete
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
10/16/2024Structural Steel - DetailsGEORGE GHEBRYALspecial
10/02/2024Construction Operations Influencing Adjacent StructuresGEORGE GHEBRYALspecial
10/02/2024DemolitionGEORGE GHEBRYALspecial
10/02/2024MasonryGEORGE GHEBRYALspecial
10/02/2024Post-installed AnchorsGEORGE GHEBRYALspecial
10/02/2024Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
10/02/2024Vertical Masonry Foundation ElementsGEORGE GHEBRYALspecial
10/02/2024Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
10/02/2024FinalGEORGE GHEBRYALprogress
10/02/2024Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
10/02/2024Footing and FoundationGEORGE GHEBRYALprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026M01120778-S1Request digital key ↗
08/20/2026M01120778-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026M01120778-S1Open ↗
08/20/2026M01120778-I1Open ↗
08/13/2026M01120778-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026M01120778-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026M01120778-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M01120778-I1Open ↗
08/13/2026M01120778-S1Open ↗
▸Other Documents2
▸DOB NOWGeotechnical Peer Review Report (BC 1818)2
08/13/2026M01120778-I1Open ↗
08/13/2026M01120778-S1Open ↗