Onyx Square Condominium
2128 OCEAN AVENUE · BIN 3425675
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFISP: SWARMPFDNY Report ↗
Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 1Under Construction1p · 1 filing · 13 docs
CellarUnder Construction14p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCK GROUP NY603/21/2026
CPCC MANAGEMENT503/21/2026
OCEAN BAY BUILDING MANAGEMENT2103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/12/2016$3.9M—MILLENNIAL REAL ESTATE LLC → CPCC MANAGEMENT LLC— not available
12/13/2013$1.3M—Private party → OCEAN BAY BUILDING MANAGEMENT LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FOCAL POINT ARCHITECTS & ASS.301/03/2025
CHOSEN MEP, CORP.211/11/2021
SAM FLIGMAN ARCHITECTURE + DESIGN110/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITER GROUP603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRISTATE FIRE SPRINK INCFire Protection207/14/2026
MAC ELECT'L CONTR. INC.Electrical103/22/2026
KHAIKA CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394210/01/2024
MSM ENGINEERING SERVICES,8449108/23/2024
MOHAMMAD AHEAD - PROFESSI9286111/11/2021
Building Lifecycle
All (78)Filed (6)Permit Issued (3)Signed Off (1)Facade (FISP) (3)Violation (20)Objection (15)Special Inspection (30)
07/13/2026
Permit issued — Sprinklers
B00587177-S2-EW-SP
04/30/2026
Signed off — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION ON EXISTING DAYCARE AT CELLAR LEVEL TO THE REFERENCED(9) NINE STORY WITH CELLAR, OF A EXISTING MIXED RESIDENTIAL & COMMERCIAL BUILDING . NO CHANGE IN USE, EGRESS OROCCUPANCY.
B01101001-I1
02/27/2025
Permit issued — Plumbing
B00587177-S2-EW-SP
01/13/2025
Special inspection requirement — Final
Feng Zhang
01/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
01/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
01/03/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION ON EXISTING DAYCARE AT CELLAR LEVEL TO THE REFERENCED(9) NINE STORY WITH CELLAR, OF A EXISTING MIXED RESIDENTIAL & COMMERCIAL BUILDING . NO CHANGE IN USE, EGRESS OROCCUPANCY.
B01101001-P1
12/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/27/2024
Special inspection requirement — Fire-Resistance Rated Construction
12/26/2024
Special inspection requirement — Final
Feng Zhang
10/15/2024
Objection resolved — Addressed
10/14/2024
Objection resolved — Addressed
10/08/2024
Objection raised — Scope
10/08/2024
Objection raised — Inspections
10/08/2024
Objection raised — Scope
10/01/2024
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION ON EXISTING DAYCARE AT CELLAR LEVEL TO THE REFERENCED(9) NINE STORY WITH CELLAR, OF A EXISTING MIXED RESIDENTIAL & COMMERCIAL BUILDING . NO CHANGE IN USE, EGRESS OROCCUPANCY.
B01101001-S2
10/01/2024
Special inspection requirement — Maintenance information
FARHAD BASSIRI-TEHRANI
10/01/2024
Special inspection requirement — Permanent certificate
FARHAD BASSIRI-TEHRANI
10/01/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
10/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
09/06/2024
Permit issued — General Construction
B01101001-I1-GC
08/23/2024
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION ON EXISTING DAYCARE AT CELLAR LEVEL TO THE REFERENCED(9) NINE STORY WITH CELLAR, OF A EXISTING MIXED RESIDENTIAL & COMMERCIAL BUILDING . NO CHANGE IN USE, EGRESS OROCCUPANCY.
B01101001-I1
08/23/2024
Violation issued (ECB, closed)
Construction
08/23/2024
Violation issued (ECB, closed)
Construction
08/23/2024
Violation issued (ECB, closed)
Construction
02/20/2024
Cycle 9 facade report submitted
02/20/2024
Cycle 9 facade report signed — SWARMP
01/24/2024
Cycle 9 facade inspection completed
06/07/2022
Violation issued (ECB, closed)
Construction
12/08/2021
Objection resolved — Addressed
11/18/2021
Objection raised — Structural
11/17/2021
Objection resolved — Addressed
11/11/2021
Filed — Alteration CO
MODIFICATION TO EXISTING PLUMBING AND SPRINKLER SYSTEMS
B00587177-S2
11/11/2021
Filed — Alteration CO
MODIFICATION TO EXISTING PLUMBING AND SPRINKLER SYSTEMS
B00587177-S1
11/11/2021
Objection resolved — Addressed
11/11/2021
Objection resolved — Addressed
11/11/2021
Objection resolved — Addressed
11/04/2021
Objection raised — Scope
10/28/2021
Objection raised — Accessibility
10/28/2021
Objection raised — Structural
10/28/2021
Objection raised — Scope
10/28/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MOHAMMAD AHEAD
10/28/2021
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
10/28/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
FARHAD BASSIRI-TEHRANI
10/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
10/28/2021
Special inspection requirement — Post-installed Anchors
MOHAMMAD AHEAD
10/27/2021
Special inspection requirement — Heating Systems
10/27/2021
Special inspection requirement — Final
10/27/2021
Special inspection requirement — Energy Code Compliance Inspections
10/27/2021
Special inspection requirement — Electrical motors and elevators
10/27/2021
Special inspection requirement — HVAC-R and service water heating system controls
10/27/2021
Special inspection requirement — Shutoff dampers
10/27/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
10/27/2021
Special inspection requirement — HVAC-R and service water heating equipment
10/27/2021
Special inspection requirement — Sprinkler Systems
MOHAMMAD AHEAD
10/27/2021
Special inspection requirement — Mechanical Systems
10/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/20/2021
Filed — Alteration CO
MODIFICATION TO EXISTING PLUMBING AND SPRINKLER SYSTEMS
B00587177-I1
09/01/2021
Special inspection requirement — Maintenance information
FARHAD BASSIRI-TEHRANI
09/01/2021
Special inspection requirement — Interior lighting power
FARHAD BASSIRI-TEHRANI
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedTRISTATE FIRE SPRINK INC07/13/2026
DOB NOWPlumbingPermit IssuedTRISTATE FIRE SPRINK INC02/27/2025
DOB NOWGeneral ConstructionSigned-offKHAIKA CONSTRUCTION INC09/06/2024
BIS—ISSUEDNEW EMPIRE BUILDER CORP08/03/2018
BISPLISSUEDRRP PLUMBING CORP03/23/2018
BISSDISSUEDRRP PLUMBING CORP03/23/2018
BISEQISSUEDNEW EMPIRE BUILDER CORP03/14/2018
BISEQISSUEDINTERSYSTEM S&S CORP01/18/2018
BIS—ISSUEDNEW EMPIRE BUILDER CORP07/10/2017
BIS—ISSUEDNEW EMPIRE BUILDER CORP06/05/2017
BISEQISSUEDROCK GROUP NY CORP04/03/2017
BISSDISSUEDRRP PLUMBING CORP03/09/2017
BISPLISSUEDRRP PLUMBING CORP02/28/2017
BISEQISSUEDNEW EMPIRE BUILDER CORP02/24/2017
BISEQISSUEDNEW EMPIRE BUILDER CORP02/15/2017
BISEQISSUEDROCK GROUP NY CORP02/14/2017
BISEQISSUEDINTERSYSTEM S&S CORP11/10/2016
BIS—ISSUEDNEW EMPIRE BUILDER CORP09/15/2016
BIS—ISSUEDNEW EMPIRE BUILDER CORP08/24/2016
BIS—RE-ISSUEDNEW EMPIRE BUILDER CORP07/13/2016
BISEQISSUEDNEW EMPIRE BUILDER CORP02/18/2016
BIS—ISSUEDNEW EMPIRE BUILDER CORP02/18/2016
BISEQISSUEDGREEN-CITI MANAGEMENT INC06/11/2015
BIS—ISSUEDGREEN-CITI MANAGEMENT INC06/11/2015
BISSDISSUEDTOP DOG PLBG & HTG CORP06/04/2015
BIS—ISSUEDNEW YORK FAST GENERAL CON04/20/2015
BIS—ISSUEDNEW YORK FAST GENERAL CON04/20/2015
BISEQISSUEDNEW YORK FAST GENERAL CON04/04/2015
1 project · most recent 11/11/2021
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/11/2021——Air Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Daikin RXYQ144ATJA 154,000 BTU · Vrf Outdoor ×2
RXYQ72AXTJA 69,000 BTU · Vrf Outdoor ×1
Heating
Qmark ×5
Daikin RXYQ144ATJA 154,000 BTU · Vrf Outdoor ×1
RXYQ72AXTJA 73,000 BTU · Vrf Outdoor ×1
Hubbell SEU30 40,920 BTU ×1
Ventilation
Whisper Warm FV-08VH1 80 CFM · Exhaust Fan ×13
Ducts & Piping
__Junk__ DUCTS Ductwork ×1
1 project · most recent 11/11/2021
Sprinkler System
FiledStatusContractorScope
11/11/2021Permit IssuedTRISTATE FIRE SPRINK INCSprinkler System
1 project · most recent 11/11/2021
Water/Sanitary
FiledStatusContractorScope
11/11/2021——Water/Sanitary
2 projects · most recent 09/20/2024
General Wiring
FiledStatusContractorScope
09/20/2024Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
08/12/2021CompleteMAC ELECT'L CONTR. INC.General Wiring
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
01/13/2025FinalFeng Zhangprogress
01/13/2025Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
01/13/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
12/27/2024Fire-Resistant Penetrations and Joints—special
12/27/2024Fire-Resistance Rated Construction—progress
12/26/2024FinalFeng Zhangprogress
10/01/2024Maintenance informationFARHAD BASSIRI-TEHRANIenergy_progress
10/01/2024Permanent certificateFARHAD BASSIRI-TEHRANIenergy_progress
10/01/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
10/01/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
10/28/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMOHAMMAD AHEADspecial
10/28/2021Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
10/28/2021HVAC-R and service water piping design and insulationFARHAD BASSIRI-TEHRANIenergy_progress
10/28/2021Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
10/28/2021Post-installed AnchorsMOHAMMAD AHEADspecial
10/27/2021Heating Systems—special
10/27/2021Final—progress
10/27/2021Energy Code Compliance Inspections—progress
10/27/2021Electrical motors and elevators—energy_progress
10/27/2021HVAC-R and service water heating system controls—energy_progress
10/27/2021Shutoff dampers—energy_progress
10/27/2021HVAC-R and service water piping design and insulation—energy_progress
10/27/2021HVAC-R and service water heating equipment—energy_progress
10/27/2021Sprinkler SystemsMOHAMMAD AHEADspecial
10/27/2021Mechanical Systems—special
Latest 25 of 32.
▾Documents — 362 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/31/2026B00587177-S1Request digital key ↗
08/31/2026B00587177-S2Request digital key ↗
08/23/2026B01101001-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits67
▸BISPLAN / WORK APPROVAL APPLICATION38
01/11/2021320917843Open ↗
12/17/2020320917843Open ↗
08/26/2020320917843Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION25
03/26/2018320917843Open ↗
03/26/2018320917843Open ↗
03/26/2018320917843Open ↗
Showing 3 of 25 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
06/22/2017340488154Open ↗
Showing 1 of 2 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/20/2018320917843Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
03/06/2020320917843Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
11/30/2020320917843Open ↗
▸BISDOB - ZONING DIAGRAM (ZD1)1
10/05/2017320917843Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications54
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
08/31/2018340468149Open ↗
08/31/2018340468149Open ↗
07/30/2018340468149Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026B01101001-P1Open ↗
08/26/2026B01101001-S2Open ↗
08/26/2026B01101001-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/31/2026B00587177-I1Open ↗
08/31/2026B00587177-S1Open ↗
08/31/2026B00587177-S2Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
04/01/2017340488154Open ↗
02/22/2017340475177Open ↗
02/11/2017340468149Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
04/01/2017340488154Open ↗
02/22/2017340475177Open ↗
02/11/2017340468149Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
04/01/2017340488154Open ↗
02/22/2017340475177Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026B01101001-S2Open ↗
08/26/2026B01101001-I1Open ↗
08/24/2026B00587177-S2Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment28
▸BISSCHEDULE B - PLUMBING12
01/17/2019320917843Open ↗
12/15/2018320917843Open ↗
08/22/2018320917843Open ↗
Showing 3 of 12 on file for this type
▸BISWATER CUT-OFF2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
03/06/2020320917843Open ↗
09/10/2018320917843Open ↗
▸BISELECTRIC CUT-OFF2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISGAS CUT-OFF2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0212
06/29/2018320917843Open ↗
06/29/2018320917843Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTANDPIPE SYSTEMS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
09/10/2018320917843Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/30/2018321559087Open ↗
▸Safety & Tenant Protection8
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWStreet Tree Checklist1
08/14/2026B00587177-I1Open ↗
▸Environmental & Asbestos10
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED6
04/01/2017340488154Open ↗
02/22/2017340475177Open ↗
02/11/2017340468149Open ↗
Showing 3 of 6 on file for this type
▸BISRODENT CONTROL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
08/13/2018320917843Open ↗
07/30/2018320917843Open ↗
07/20/2018320917843Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
07/20/2018320917843Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY12
07/18/2020340219917Open ↗
07/18/2020340219917Open ↗
04/01/2017340488154Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
07/30/2018320917843Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
07/30/2018320917843Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBPP: SIDEWALK CONCRETE STRENGTH REPORT1
07/18/2020340219917Open ↗
▸Approvals, Objections & Sign-offs57
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST25
01/20/2021320917843Open ↗
12/14/2020320917843Open ↗
09/11/2020320917843Open ↗
Showing 3 of 25 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE13
01/12/2021320917843Open ↗
01/11/2021320917843Open ↗
12/17/2020320917843Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
08/13/2018320917843Open ↗
08/13/2018320917843Open ↗
08/13/2018320917843Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER4
03/17/2017340266679Open ↗
Showing 1 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLANDMARKS APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISMECHANICAL (MH) SIGNOFF1
09/11/2020320917843Open ↗
▸Cost, Insurance & Ownership9
▸BISPROJECT-SPECIFIC GL INSURANCE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT4
07/25/2018321559087Open ↗
07/20/2018321559087Open ↗
07/17/2018340266679Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: ENGINEERS AFFIDAVIT1
07/18/2020340219917Open ↗
▸Filing & Intake Forms60
▸BISADDITIONAL INFORMATION26
09/03/2020320917843Open ↗
12/20/2019320917843Open ↗
12/12/2019320917843Open ↗
Showing 3 of 26 on file for this type
▸BISBOROUGH INTAKE FORM21
03/06/2020320917843Open ↗
12/20/2019320917843Open ↗
10/08/2019340266679Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
04/01/2017340488154Open ↗
02/22/2017340475177Open ↗
Showing 2 of 6 on file for this type
▸BISEFILING COVER SHEET6
04/26/2017321559087Open ↗
Showing 1 of 6 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
08/13/2018320917843Open ↗
05/31/2018320917843Open ↗
08/23/2017320917843Open ↗
Showing 3 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
07/18/2020340219917Open ↗
07/18/2020340219917Open ↗
07/18/2020340219917Open ↗
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
04/01/2017340488154Open ↗
▸BISREJECTED! RESOLVE 2 OPEN DOB VIOLATIONS1
01/06/2021320917843Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026B00587177-I1Open ↗