← Back
Primarily 3 family with 1 store or office
2129 2 AVENUE
MANHATTAN · BIN 1052440
💬 Discuss this project
1900Year Built
4Stories
S3Building Class
R9AZoning
4,000 sfGross Floor Area
4Units
Rent Stabilized3 Open Violations ▸
Primarily 3 family with 1 store or office · Owner of record: 2129 SECOND AVE COR · 1,600 sf lot · 2.5 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralGeneral
Permit Issued — active, not yet Signed-off
Floor 1Under Construction24p · 1 filing · 20 docs
CellarUnder Construction26p · 2 filings · 20 docs
Sub-BasementUnder Construction23p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOGON REALTY908/26/2026
2129 SECOND AVE COR103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KIERAN PATRICK SPILLANE612/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOL BUILDING CONSULTING SERVICES203/21/2026
JAM CONSULTANTS, INC.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C.A.C. INDUSTRIES, INCGeneral Contractor208/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106312/09/2025
Building Lifecycle
All (50)Filed (6)Permit Issued (2)Violation (12)Special Inspection (30)
07/20/2026
Permit issued — Foundation
M00870296-S1-FO
02/11/2026
Permit issued — Structural
M00870296-I1-GC-CX
12/11/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
GEORGE GHEBRYAL
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
12/11/2025
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
12/11/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
12/11/2025
Special inspection requirement — Demolition
GEORGE GHEBRYAL
12/11/2025
Special inspection requirement — Vertical Masonry Foundation Elements
GEORGE GHEBRYAL
12/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
12/11/2025
Special inspection requirement — Masonry
GEORGE GHEBRYAL
12/11/2025
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
12/11/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
12/11/2025
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
12/09/2025
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building underpinning. Repair and strengthen existing foundation walls and columns, with inclusion of minipiles.
M00870296-P3
12/09/2025
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building underpinning. Repair and strengthen existing foundation walls and columns, with inclusion of minipiles.
M00870296-P4
09/15/2025
Special inspection requirement — Footing and Foundation
09/15/2025
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Demolition
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Masonry
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Vertical Masonry Foundation Elements
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/15/2025
Special inspection requirement — Deep Foundation Elements
09/15/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
09/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/15/2025
Special inspection requirement — Structural Steel - Details
09/15/2025
Special inspection requirement — Structural Steel - High Strength Bolting
09/15/2025
Special inspection requirement — Structural Steel - Welding
06/04/2025
Violation issued (HPD, closed)
A
04/01/2024
Violation issued (HPD, closed)
A
03/04/2024
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building underpinning. Repair and strengthen existing foundation walls and columns, with inclusion of minipiles.
M00870296-P2
03/04/2024
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building underpinning. Repair and strengthen existing foundation walls and columns, with inclusion of minipiles.
M00870296-P1
11/15/2023
Violation issued (HPD, closed)
I
09/21/2023
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building underpinning. Repair and strengthen existing foundation walls and columns, with inclusion of minipiles.
M00870296-I1
09/21/2023
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building underpinning. Repair and strengthen existing foundation walls and columns, with inclusion of minipiles.
M00870296-S1
02/15/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
I
10/25/2019
Violation issued (HPD, closed)
I
10/05/2018
Violation issued (HPD, closed)
I
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/27/2014
Violation issued (HPD, closed)
B
12/25/2004
Violation issued (HPD, open)
B
02/28/1979
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedC.A.C. INDUSTRIES, INC07/20/2026
DOB NOWStructuralPermit IssuedC.A.C. INDUSTRIES, INC02/11/2026
BISFSISSUEDUNFLAT PEROTTO ASSO12/22/1995
1 project · most recent 12/09/2025
Steel Concrete Masonry
FiledStatusContractorScope
12/09/2025Permit IssuedC.A.C. INDUSTRIES, INCSteel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
12/11/2025Construction Operations Influencing Adjacent StructuresGEORGE GHEBRYALspecial
12/11/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
12/11/2025Structural Steel - DetailsGEORGE GHEBRYALspecial
12/11/2025Post-installed AnchorsGEORGE GHEBRYALspecial
12/11/2025DemolitionGEORGE GHEBRYALspecial
12/11/2025Vertical Masonry Foundation ElementsGEORGE GHEBRYALspecial
12/11/2025Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
12/11/2025MasonryGEORGE GHEBRYALspecial
12/11/2025Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
12/11/2025FinalGEORGE GHEBRYALprogress
12/11/2025Footing and FoundationGEORGE GHEBRYALprogress
09/15/2025Footing and Foundation—progress
09/15/2025Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
09/15/2025Construction Operations Influencing Adjacent StructuresGEORGE GHEBRYALspecial
09/15/2025DemolitionGEORGE GHEBRYALspecial
09/15/2025MasonryGEORGE GHEBRYALspecial
09/15/2025Post-installed AnchorsGEORGE GHEBRYALspecial
09/15/2025Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
09/15/2025Structural Steel - DetailsGEORGE GHEBRYALspecial
09/15/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
09/15/2025Vertical Masonry Foundation ElementsGEORGE GHEBRYALspecial
09/15/2025FinalGEORGE GHEBRYALprogress
09/15/2025Footing and FoundationGEORGE GHEBRYALprogress
09/15/2025Tenant Protection Plan Compliance—special
09/15/2025Deep Foundation Elements—special
Latest 25 of 57.
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026M00870296-P3Request digital key ↗
08/27/2026M00870296-P1Request digital key ↗
08/27/2026M00870296-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026M00870296-S1Open ↗
08/27/2026M00870296-I1Open ↗
08/27/2026M00870296-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026M00870296-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026M00870296-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026M00870296-I1Open ↗
08/27/2026M00870296-S1Open ↗
08/13/2026M00870296-P4Open ↗
Showing 3 of 4 on file for this type
▸Other Documents12
▸DOB NOWGeotechnical Peer Review Report (BC 1818)6
08/27/2026M00870296-S1Open ↗
08/27/2026M00870296-I1Open ↗
08/27/2026M00870296-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)6
08/27/2026M00870296-S1Open ↗
08/27/2026M00870296-I1Open ↗
08/27/2026M00870296-P2Open ↗
Showing 3 of 6 on file for this type