← Back
Two family converted from one family
2129 EAST 74 STREET
BROOKLYN · BIN 3237780
💬 Discuss this project
1955Year Built
2.5Stories
B3Building Class
R3-1Zoning
2,383 sfGross Floor Area
2Units
2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.6 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanical
Roof2p · 1 filing · 20 docs
Floor 29p · 2 filings · 20 docs
Floor 19p · 2 filings · 20 docs
Cellar8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HAMOUD CONSTRUCTION403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/13/2021$550K—— → —$231/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TARLAN DESIGN BUILD, LLC707/20/2026
REAL ESTATE & ARCHITECTURAL SERVICE107/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LANCIERS ASSOCIATES1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HAMOUD CONSTRUCTION CORPGeneral Contractor1107/08/2026
BDS ELECTRIC CORP.Electrical203/22/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TARLAN DESIGN BUILD, LLC3187607/20/2026
Building Lifecycle
All (100)Filed (8)Permit Issued (6)Signed Off (2)Violation (5)Inspection (5)Objection (52)Special Inspection (22)
08/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SAVERIO TARANTINO
08/06/2026
Special inspection requirement — Fenestration air leakage
SAVERIO TARANTINO
08/06/2026
Special inspection requirement — Air barrier - visual inspection
SAVERIO TARANTINO
08/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAVERIO TARANTINO
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAVERIO TARANTINO
08/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
SAVERIO TARANTINO
08/06/2026
Special inspection requirement — Energy Code Compliance Inspections
SAVERIO TARANTINO
08/06/2026
Special inspection requirement — Insulation placement and R values
SAVERIO TARANTINO
08/06/2026
Special inspection requirement — Fenestration areas
SAVERIO TARANTINO
08/06/2026
Special inspection requirement — Interior lighting power
SAVERIO TARANTINO
07/20/2026
Filed — Alteration CO
Horizontal and Vertical Enlargement of the existing building, interior renovation of the existing building and conversion from a 1 family residence to a two family private dwelling.
B00704747-P2
04/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/17/2024
Signed off — Alteration
Erect Temporary wood construction fence in conjunction with General Construction application #B00704747.
B00704853-I1
05/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAVERIO TARANTINO
05/14/2024
Special inspection requirement — HVAC-R and service water heating equipment
SAVERIO TARANTINO
05/14/2024
Special inspection requirement — HVAC-R and service water heating system controls
SAVERIO TARANTINO
05/07/2024
Filed — Alteration
Remove and Cap fixtures on the cellar and 1st floor. New fixtures in cellar, 1st and 2nd floors in conjunction with application #B00704747
B00765425-P3
05/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAVERIO TARANTINO
05/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
SAVERIO TARANTINO
05/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
SAVERIO TARANTINO
01/05/2024
Signed off — Alteration
Interior demolition of partitions, ceilings, flooring and chimney as per plans submitted.
B00765171-I1
12/11/2023
Objection resolved — Addressed
10/12/2023
Objection raised — Other
10/03/2023
Filed — Alteration
Remove and Cap fixtures on the cellar and 1st floor. New fixtures in cellar, 1st and 2nd floors in conjunction with application #B00704747
B00765425-P2
10/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAVERIO TARANTINO
10/03/2023
Special inspection requirement — HVAC-R and service water heating system controls
SAVERIO TARANTINO
10/03/2023
Special inspection requirement — HVAC-R and service water heating equipment
SAVERIO TARANTINO
08/31/2023
Violation issued (ECB, open)
Construction
08/04/2023
Filed — Alteration
Remove and Cap fixtures on the cellar and 1st floor. New fixtures in cellar, 1st and 2nd floors in conjunction with application #B00704747
B00765425-P1
08/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAVERIO TARANTINO
08/04/2023
Special inspection requirement — HVAC-R and service water heating equipment
SAVERIO TARANTINO
08/04/2023
Special inspection requirement — HVAC-R and service water heating system controls
SAVERIO TARANTINO
08/02/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/25/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/25/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/18/2023
Violation issued (ECB, open)
Construction
07/17/2023
Permit issued — Plumbing
B00765425-I1-PL
07/17/2023
Violation issued (ECB, closed)
Construction
07/17/2023
Violation issued (ECB, closed)
Construction
07/17/2023
Violation issued (ECB, closed)
Construction
06/09/2023
Permit issued — General Construction
B00704747-I1-GC
11/15/2022
Objection raised — Mechanical
11/15/2022
Objection resolved — Addressed
11/15/2022
Objection raised — Mechanical
11/15/2022
Objection resolved — Addressed
11/15/2022
Objection raised — Inspections
11/15/2022
Objection resolved — Addressed
11/15/2022
Objection raised — Admin
11/15/2022
Objection resolved — Addressed
11/15/2022
Objection raised — Scope
11/15/2022
Objection resolved — Addressed
11/15/2022
Objection raised — Other
11/15/2022
Objection resolved — Addressed
11/01/2022
Filed — Alteration
Remove and Cap fixtures on the cellar and 1st floor. New fixtures in cellar, 1st and 2nd floors in conjunction with application #B00704747
B00765425-I1
09/12/2022
Objection raised — Other
09/12/2022
Objection resolved — Addressed
09/12/2022
Objection raised — Other
09/12/2022
Objection resolved — Addressed
09/12/2022
Objection raised — Other
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG07/17/2023
DOB NOWGeneral ConstructionPermit IssuedHAMOUD CONSTRUCTION CORP06/09/2023
DOB NOWGeneral ConstructionSigned-offHAMOUD CONSTRUCTION CORP08/24/2022
DOB NOWConstruction FenceSigned-offHAMOUD CONSTRUCTION CORP08/24/2022
DOB NOWGeneral ConstructionSigned-offHAMOUD CONSTRUCTION CORP07/07/2022
DOB NOWConstruction FenceSigned-offHAMOUD CONSTRUCTION CORP05/05/2022
1 project · most recent 05/07/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/07/2024Signed-offJOHN FITZGERALD PLBG &HTGGas, Water/Sanitary
1 project · most recent 05/08/2026
General Wiring Lighting
FiledStatusContractorScope
05/08/2026CompleteBDS ELECTRIC CORP.General Wiring, Lighting
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
08/06/2026Fenestration and door U-factor and product ratingsSAVERIO TARANTINOenergy_progress
08/06/2026Fenestration air leakageSAVERIO TARANTINOenergy_progress
08/06/2026Air barrier - visual inspectionSAVERIO TARANTINOenergy_progress
08/06/2026Structural Stability – Alterations of existing buildingsSAVERIO TARANTINOspecial
08/06/2026Fire-Resistant Penetrations and JointsSAVERIO TARANTINOspecial
08/06/2026Fire-Resistance Rated ConstructionSAVERIO TARANTINOprogress
08/06/2026Energy Code Compliance InspectionsSAVERIO TARANTINOprogress
08/06/2026Insulation placement and R valuesSAVERIO TARANTINOenergy_progress
08/06/2026Fenestration areasSAVERIO TARANTINOenergy_progress
08/06/2026Interior lighting powerSAVERIO TARANTINOenergy_progress
05/14/2024Fire-Resistant Penetrations and JointsSAVERIO TARANTINOspecial
05/14/2024HVAC-R and service water heating equipmentSAVERIO TARANTINOenergy_progress
05/14/2024HVAC-R and service water heating system controlsSAVERIO TARANTINOenergy_progress
05/07/2024Fire-Resistant Penetrations and JointsSAVERIO TARANTINOspecial
05/07/2024HVAC-R and service water heating system controlsSAVERIO TARANTINOenergy_progress
05/07/2024HVAC-R and service water heating equipmentSAVERIO TARANTINOenergy_progress
10/03/2023Fire-Resistant Penetrations and JointsSAVERIO TARANTINOspecial
10/03/2023HVAC-R and service water heating system controlsSAVERIO TARANTINOenergy_progress
10/03/2023HVAC-R and service water heating equipmentSAVERIO TARANTINOenergy_progress
08/04/2023Fire-Resistant Penetrations and JointsSAVERIO TARANTINOspecial
08/04/2023HVAC-R and service water heating equipmentSAVERIO TARANTINOenergy_progress
08/04/2023HVAC-R and service water heating system controlsSAVERIO TARANTINOenergy_progress
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/30/2026B00704853-I1Request digital key ↗
08/29/2026B00765171-I1Request digital key ↗
08/28/2026B00704747-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records10
▸DOB NOWRestrictive Declaration/Easement 16
08/28/2026B00704747-P2Open ↗
08/13/2026B00765425-P1Open ↗
08/13/2026B00765425-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/28/2026B00704747-P2Open ↗
08/13/2026B00704747-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/28/2026B00704747-P2Open ↗
08/13/2026B00704747-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/28/2026B00704747-I1Open ↗
08/28/2026B00704747-P2Open ↗
08/28/2026B00765425-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026B00765425-P3Open ↗
08/26/2026B00765425-P2Open ↗
08/26/2026B00765425-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B00765425-P3Open ↗
08/26/2026B00765425-P2Open ↗
08/26/2026B00765425-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/28/2026B00704747-P2Open ↗
08/13/2026B00704747-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00704747-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/28/2026B00704747-P2Open ↗
08/28/2026B00765425-P3Open ↗
08/28/2026B00765425-P2Open ↗
Showing 3 of 7 on file for this type
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/28/2026B00704747-P2Open ↗
08/14/2026B00704747-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/28/2026B00704747-P2Open ↗
08/13/2026B00704747-I1Open ↗
▸DOB NOWPlot Diagram2
08/28/2026B00704747-P2Open ↗
08/13/2026B00704747-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/28/2026B00704747-P2Open ↗
08/14/2026B00704747-I1Open ↗